Permanent Occupancy | | 9/30/2004 | 9/30/2004 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/21/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9304 issued 8-21-02 to Dr. Blaisdell.
|
BLD-Final | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | PASS |
Russ Owen
|
|
|
Matt - ###-#### - Cathy has the occ. request card. Ok perm oc. 8/16/2002 1:57:02 PM
|
PubWorks Occupancy Approval | 8/13/2002 | 8/13/2002 | 8/13/2002 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 8/12/02. R.Rokovitz
|
Telephone call | | | 8/13/2002 | | DONE |
|
|
|
Talked with Dr.'s secretary re: status of temp. occ.
|
Fee Review-notes | 7/19/2001 | 7/19/2001 | 7/12/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 7/2/2002 | | PASS |
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF AND RELEASE OF BOND.
|
Temporary occupancy | | | 6/5/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4823 issued 6-5-02 to Dr. Blaisdell.
|
BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PART |
Russ Owen
|
|
|
###-####. Ok for a temp oc.needs all other signatures for a perm oc. fire caulk basement and gas room . 5/31/2002 1:39:50 PM 5/31/2002 1:40:20 PM
|
BLD-Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PART |
Russ Owen
|
|
|
###-####. Ok for a temp oc.needs all other signatures for a perm oc. fire caulk basement and gas room . 5/31/2002 1:39:50 PM 5/31/2002 1:40:20 PM
|
FIRE-Final Inspection | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PASS |
Rick Jackson
|
|
|
CHRIS ###-####
|
Code Occupancy Approval Temp | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Wm. Michael Meloy
|
|
|
OK to bond at $16,000 for landscaping. 5/23/2002 4:10:12 PM
|
FIRE-Final Inspection | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | FAIL |
Rick Jackson
|
|
|
###-####-chris address and med gas room fire stopping; verify gas piping labels 5/23/2002 9:29:02 AM
|
BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 | P | FAIL |
Russ Owen
|
|
|
fn occ--chris ###-####. needs all signatures on card . also complete basement fire caulking etc. and gas storage. 5/23/2002 3:15:46 PM
|
BLD-Other | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | PART |
Russ Owen
|
|
|
CEILING ###-#### SCOTT . all ok except 1 closet in room next to south east entry. 4/30/2002 4:54:26 PM 4/30/2002 4:54:56 PM
|
BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | PASS |
Russ Owen
|
|
|
###-#### Jory Truss company repaired truss. 2/28/2002 5:08:24 PM
|
BLD-Framing/Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 22:47:09. Contact: ###-####. Need truss repair from truss comp contractor said truss company will repair. complete seal behind basement fured out wall. Ok to start sheetrock except at effected areas contractor at site notified. 2/26/2002 2:30:12 PM
|
BLD-Framing/Rough-in | 2/24/2002 | 2/25/2002 | 2/25/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/24/2002 at 20:42:15. Contact: ###-####. Most corrections complete still need a few items on c/n posted. 2/25/2002 4:21:31 PM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 20:56:02. Contact: (208) 9-6374. ok to insulate insulate spoke with contractor about c/n posted.. 2/22/2002 4:38:47 PM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 22:15:06. Contact: ###-####. C/n posted. 2/21/2002 4:43:17 PM
|
BLD-Other | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 21:34:16. Contact: ###-####. shear wall ok to cover ext 2/1/2002 10:18:09 AM
|
BLD-Other | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 22:22:32. Contact: ###-####. need saddl shear nailing at north wall. 1/31/2002 2:11:09 PM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | PART |
Russ Owen
|
|
|
wip 1/14/2002 10:17:31 AM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 22:03:05. Contact: . lower crawl shear at pony wall supporting floor joists. 10/25/2001 9:53:18 AM
|
BLD-Foundation | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | PASS |
Alan Hauser
|
|
|
###-#### MIKE
|
BLD-Foundation | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted need eng ok for verts and horiz in basement walls not per plan 9/20/2001 9:03:12 AM
|
BLD-Footing | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 10:19:44. Contact: ###-####.
|
(F) Reprint permit | | | 9/6/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/5/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/20/2001 | | 8/31/2001 | | PASS |
Mike Phillips
|
|
|
8/31/2001 08:22:25 M_P - activity updated through activity BLDA022 from case BLD01-01955.
|
Routing - PLAN CHECK | 8/30/2001 | | 8/31/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/31/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/31/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/31/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/31/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/31/2001 | | DONE |
|
|
|
LEFT MESS FOR MATT MORGAN THAT PERMIT IS READY
|
Routing - PUBLIC WORKS | 8/29/2001 | | 8/30/2001 | | PASS |
|
|
|
|
Routing - FIRE | 8/29/2001 | 8/29/2001 | 8/29/2001 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 8/29/2001 | | 8/29/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 8/28/2001 | | 8/29/2001 | | DONE |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 8/29/2001 | | PEND |
|
|
|
Waiting for other to approve prior to issuing permit.
|
Routing - PLUMBING | 8/21/2001 | | 8/28/2001 | | PASS |
|
|
|
additional cross connection protection may be required, per plans and resubmittals dated 8/16/01 and 97 upc
|
Plan resubmittals received | | | 8/24/2001 | | DONE |
|
|
|
Received two copies of revised sheets A0 A1, A2, A3, A4, A5, A6, A6.1, A7, A8, M-1, M-2, E-2, E-4. Two copies of responses. Routed to Mike P. KMM
|
Routing - PLAN CHECK | 8/20/2001 | | 8/21/2001 | | |
|
|
|
Routing to plumbing.
|
Routing - PUBLIC WORKS | 8/16/2001 | | 8/20/2001 | | FAIL |
|
|
|
Drainage plan does not comply with new standards. Revisions are required per Brian Murphy. KMM
|
Telephone call | | | 8/17/2001 | | DONE |
|
|
|
Discussed fire dampers and shaft requirements for basement ceiling penetrations and openings.
|
Routing - FIRE | 8/15/2001 | 8/16/2001 | 8/16/2001 | | FAIL |
Bill Alexander
|
|
|
Does not meet UFC plan requirements
|
Routing - PLAN CHECK | 8/13/2001 | 8/13/2001 | 8/16/2001 | | |
|
|
|
Received plans from Jeff Jones and starting to do review.
|
Meeting | | | 8/16/2001 | | |
|
|
|
Dan Stewart and myself met with Larry and discussed plan review comments.
|
Plan Review Completed(1st rev) | | | 8/16/2001 | | FAIL |
|
|
|
Fail fire plumbing public works building. .
|
Plan Reviewer's activity | | | 8/15/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
Print Pending Permit.LaserJet4 | | | 8/15/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/31/2001 | | 8/15/2001 | | FAIL |
|
|
|
Routing to fire
|
Plan Reviewer's activity | | | 8/14/2001 | | FAIL |
|
|
|
Called and talked with Oscar about shear wall lay outs or engineers red lines. If this requirement is not provided today plans must be review and stamped by engineer of record.
|
Routing - PLUMBING | 7/30/2001 | | 7/31/2001 | | FAIL |
|
|
|
PROVIDE A SITE PLAN SHOWING SEWER AND WATER SERVICES, IF WALLS BETWEEN TREATMENT AREAS ARE NOT FULL HEIGHT, REVISE PLANS SHOWING ISLAND FIXTURE VENTING, 1" WATER LINE TO GAS CABINET MUST TIE TO WATER SYSTEM DOWNSTREAM OF PREMISE BACKFLOW PREVENTOR, MIN. VACUUM PIPE SIZE IS 3/4".
|
Routing - PLANNING | 7/26/2001 | | 7/30/2001 | | PASS |
|
|
|
Approved per DRH01-82.
|
Routing - PUBLIC WORKS | 7/20/2001 | | 7/26/2001 | | FAIL |
|
|
|
Drainage plan does not comply with new standards. Revisions required. Per Jim Wyllie
|
Plan routing begun/NEW & ADDTN | | | 7/20/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/20/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 7/19/2001 | | DONE |
|
|
|
|
Application received | | | 7/19/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/19/2001 | | DONE |
|
|
|
|