Permit Information
Permit NumberBLD01-01956
StatusFinaled
Name TIMES SQUARE PROFESSIONAL PARK, LLC
Site Address 1541 S TIMESQUARE LN
Project NameDR SAM SMITH
Customer Number 
ePlanReviewNo
Description
To construct a new 2,600 sq.ft. single story, wood framed, multi-tenant office building with a 435 sq.ft basement mechanical room. NOTE: The basement area can not be used for any purpose other than a mechanical room there can not be any storage of files or furniture in this area. All construction is per the approved plans and CABO/ANSI A117.1. Additional work covered under this permit includes on site grading and landscaping. A separate Certificate of Occupancy must be obtained to occupy the 850 sq.ft. future tenant space. MJP DRH00-00242 PC#609-01. 10/4/01-PLAN MODIFICATION APPROVED FOR SITE RELOCATION OF STRUCTURE. EAST WALL OF BUILDING TO BE 29"-6" FROM PROPERTY LINE. REVISED LANDSCAPE PLAN TO BE SUBMITTED TO PLANNING & APPROVED PRIOR TO INSTALLATION OF PLANT MATERIALS. (MYS)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/9/20037/9/20037/9/2003 DONE
Additional values from subcontractors.
Permanent occupancy  7/19/2002 DONE
Perm. Occ. Cert. #9265 issued 7-19-02 to Dr. Sam Smith Orthodontics.
Permanent Occupancy 7/16/20027/16/2002 DONE
Details
BLD-Final7/16/20027/16/20027/16/2002PPART
DetailsRuss Owen
RUSS; Phone #: ###-####Ok for a perm oc if all required signatures are on card. 7/16/2002 4:05:55 PM. 7/16/2002 4:07:06 PM
BLD-Final7/15/20027/15/20027/15/2002PFAIL
DetailsRuss Owen
208/221/6881 fn occ burke --. c/n for fire caulk and rear door hdwr. 7/15/2002 3:07:56 PM
Fee Review-notes7/19/20017/19/20014/26/2002 DONE
5/7 called GC for final and Jay is working it up.
BLD-Final3/21/20023/22/20023/22/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/21/2002 at 20:24:32. Contact: ###-####. C/n posted for corrections. Would be ok for a temp oc pending all required signatures 3/22/2002 2:38:38 PM
FIRE-Final Inspection3/22/20023/22/20023/22/2002PPASS
DetailsTroy Cobbley
fire life/safety finaled. fire alarm permit to be voided 3/22/2002 4:04:53 PM
Temporary occupancy  3/22/2002 DONE
Temp. Occ. Cert. #4751 issued 3-22-02 to Dr. Sam Smith.
FIRE-Final Inspection3/21/20023/21/20023/21/2002PFAIL
DetailsRick Jackson
fire fn ###-####- chris west exit door hardware; it appears that a fire alarm system is being installed without plans, alarm plans have been received as part of this project but not isssued 3/21/2002 2:47:56 PM
BLD-Framing/Rough-in3/14/20023/15/20023/15/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/14/2002 at 16:15:31. Contact: .
BLD-Framing/Rough-in3/14/20023/14/20023/14/2002PPART
DetailsRuss Owen
chris ###-####. need to complete the rear area by stairs. 3/14/2002 4:48:19 PM
BLD-Wall cover1/22/20021/23/20021/23/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/22/2002 at 19:11:59. Contact: ###-####.
BLD-Framing/Rough-in1/14/20021/15/20021/15/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/14/2002 at 18:31:27. Contact: ###-####. I have approved the revised floor plan and have a letter owner 1/15/2002 4:38:19 PM 1/15/2002 4:39:16 PM a 1/15/2002 4:39:16 PM to employ no more than 4 people. 1/15/2002 4:39:48 PM
BLD-Framing/Rough-in1/13/20021/14/20021/14/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/13/2002 at 20:49:46. Contact: ###-####.
BLD-Framing/Rough-in1/10/20021/11/20021/11/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/10/2002 at 22:09:08. Contact: ###-####. Need revised floor plan resolved and approved. 1/11/2002 1:17:01 PM
BLD-Framing/Rough-in1/8/20021/9/20021/9/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/08/2002 at 23:32:06. Contact: .Posted c/n, for framing and plan modification. 1/9/2002 12:18:59 PM
BLD-Framing/Rough-in1/7/20021/8/20021/8/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/07/2002 at 19:04:54. Contact: . Need to complete all prior c/n items do not sheetrock,posted c/n, also no one at site. contact number not given. 1/8/2002 12:00:05 PM
BLD-Framing/Rough-in1/2/20021/2/20021/2/2002PFAIL
DetailsRuss Owen
###-#### SHEER WALL and interior. 1/2/2002 5:30:55 PM
BLD-Framing/Rough-in12/10/200112/11/200112/11/2001PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/10/2001 at 14:29:10. Contact: ###-####.c/n posted. 12/11/2001 4:37:12 PM
BLD-Foundation10/11/200110/12/200110/12/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/11/2001 at 18:34:06. Contact: ###-####.
BLD-Foundation10/10/200110/11/200110/11/2001PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/10/2001 at 17:57:27. Contact: ###-####.
BLD-Footing10/4/200110/5/200110/5/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/04/2001 at 17:02:49. Contact: .footing. 10/5/2001 11:26:12 AM
BLD-Footing10/3/200110/4/200110/4/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/03/2001 at 22:47:07. Contact: .Needs revised site 10/4/2001 10:45:25 AM
Inspection Record Card- Bld  10/4/2001 DONE
Print Occupancy Form  10/4/2001 DONE
Print Occupancy Form  10/4/2001 DONE
(F) Reprint permit  10/4/2001 DONE
Routing - PLANNING10/3/2001 10/4/2001 PASS
Tempra Wilson.
Routing - PLAN CHECK10/4/2001 10/4/2001 PASS
Marlene Southard. Total due for plan modification review process is $147.00.
Plan resubmittals received  10/3/2001 DONE
PLAN MODIFICATION RECEIVED. Sheet A-1. $500 FEE WAIVED BY JENIFER GILLILAND. Routing began to Public Works (Brian Murphy), Fire (Richard Dailey) and Planning (Tempra).
Routing - PUBLIC WORKS10/3/2001 10/3/2001 PASS
Brian Murphy.
Routing - FIRE10/3/2001 10/3/2001 PASS
Richard Dailey.
(F) Reprint permit  9/27/2001 DONE
Issue PAID IN FULL permit  9/26/2001  
Routing - PUBLIC WORKS9/13/2001 9/18/2001 PASS
Subdivision recorded.
Routing - PLAN CHECK9/18/2001 9/18/2001 PASS
REMOVED PARCEL TAG as subdivision is recorded. Permit and plans taken to front desk on behalf of Mike Phillips. The parcel number will need to be changed once assigned by county recorder.
PLANS/APPL TAKEN TO FRONT DESK  9/18/2001 DONE
Took to front desk on behalf of Mike Phillips.
Inspection Record Card- Bld  9/18/2001 DONE
Print Occupancy Form  9/18/2001 DONE
Telephone call  9/18/2001 DONE
Plan assigned to (M_P)7/20/2001 9/18/2001 PASS
DetailsMike Phillips
9/18/2001 09:56:54 MYS - activity updated through activity BLDA022 from case BLD01-01956.
Routing - PLAN CHECK9/12/2001 9/13/2001 HOLD
Subdivision not recorded per AEM
Routing - PLANNING9/12/2001 9/12/2001 PASS
Approve per DRH00-242.
Routing - FIRE9/5/2001 9/11/2001 PASS
Plan resubmittals received  9/7/2001 DONE
Received letter from Dr. Smith occupants and forwarded to Mike Phillips.
Routing - PLAN CHECK8/20/2001 9/5/2001 FAIL
Plan Reviewer's activity  9/5/2001 FAIL
Waiting for letter from doctor explaining not having two bathrooms for a 850 sq.ft. tenant space.
Plan resubmittals received  9/4/2001 DONE
Received two copies of revised sheets A0, A2, A3, A4, A5, A6, A9. One copy of cover letter to Richard D. One copy of United Water Letter. One copy of response letter to Mike P. One copy of letter from Dr. Sims. One copy of structural response letter to city comments. Routed all of the above to Mike P. KMM
Plan Review Completed(1st rev)  8/20/2001 FAIL
Routing - FIRE8/17/2001 8/20/2001 FAIL
water supply & medical gases
Plan Reviewer's activity  8/17/2001 FAIL
Additional information required for further review and prior to issuing permit.
Override - Parcel Holds  8/17/2001  
Routing - PLAN CHECK8/1/2001 8/17/2001 FAIL
routing to fire.
Routing - PLUMBING7/27/2001 8/1/2001 PASS
DENTAL AIR SYSTEM MUST BE PIPED WITH MATERIALS APPROVED FOR OXYGEN SERVICE, COORDINATE COMPRESSED AIR INTAKE AND VACUUM EXHAUST WITH FIELD INSPECTOR.
Routing - PLANNING7/25/2001 7/27/2001 FAIL
Need final plans to satisfy DR requirements. Applicant and architect have been notified.
Routing - PUBLIC WORKS7/20/2001 7/25/2001 FAIL
Subdivision not recorded per April Miller. 7/25/01 DAR
Plan routing begun/NEW & ADDTN  7/20/2001 DONE
Plans ACCEPTED BY PLAN TECH  7/20/2001 DONE
Received Certificate of Value  7/19/2001 DONE
Application received  7/19/2001  
Override - Parcel Holds  7/19/2001  
Recd Pcfee & Taken To Pln CK  7/19/2001 DONE
Plan Reviewer's activity  2/6/2001 HOLD
NO PERMITS CAN BE ISSUED UNTIL THE SUBDIVISION IS RECORDED. "SEE TIMES SQUARE SUBDIVISION".