BLD-Final | 3/1/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Alan Hauser
|
|
|
steve ###-#### c/c#21677 3/5/2002 10:11:47 AM
|
DOC - Permit Finaled | 3/5/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 3/5/2002 10:11:49 AM
|
BLD-Aging Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | | PASS |
Steven Webb
|
|
|
wip--permit active 1/28/2002 7:51:06 AM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | PASS |
Steven Webb
|
|
|
fr insp-- ???? larry =###-#### ok to cover 11/28/2001 10:53:21 AM
|
BLD-Energy code compliance | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PART |
Jim Storey
|
|
|
LARRY ###-#### c/n for gas line protection plates 11/27/2001 10:05:55 STYLE PER LISTING. REINSP REQUIRED OK TO COVER 2 ND FLOOR ONLY. 11/27/2001 10:06:52 AM
|
BLD-Framing/Rough-in | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PASS |
Steven Webb
|
|
|
###-#### ok to insulate 11/20/2001 10:50:37 AM
|
BLD-Framing/Rough-in | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### LARRY c/n--air seal package not done--do not insulate 11/16/2001 10:16:25 AM
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Steven Webb
|
|
|
###-#### LARRY SHEER WALL --OK TO SIDE 11/7/2001 9:41:11 AM
|
BLD-Foundation | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PART |
Dave Hannah
|
|
|
fd logan ###-#### work in progress foundation plans dont show hold downs on back wall but framing plan shows 3 sets crew will check into this 9/18/2001 9:51:38 AM
|
BLD-Footing | 9/14/2001 | 9/14/2001 | 9/14/2001 | P | PART |
Steven Webb
|
|
|
logan ###-#### ft wip 9/14/2001 1:42:34 PM
|
Override - Parcel Holds | | | 9/14/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/14/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/14/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/14/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 9/5/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/4/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/4/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/31/2001 | 7/31/2001 | 8/22/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/9/2001 | | 8/22/2001 | | PASS |
Steve Munroe
|
|
|
8/22/2001 10:22:34 SAM - activity updated through activity BLDA022 from case BLD01-01982.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/22/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/22/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/22/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/9/2001 | | PEND |
|
|
|
8/9/01 11:52 I called and left a message for Steve with Homco to call me. I need a footing in the garage engineered and I wanted to let them know I DO NOT have the information for the flood plain yet.
|
Case Summary (BLD) | | | 8/9/2001 | | |
|
|
|
|
Plan Review Report | | | 8/9/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/9/2001 | | PEND |
|
|
|
8/9/01 Plan review is done. I am waiting for Jim Wyllie to release, floodplain.
|
Pending Assignment by DJO | 7/24/2001 | | 8/9/2001 | | DONE |
Dan Overy
|
|
|
8/9/2001 08:20:39 SAM - activity updated through activity BLDA183 from case BLD01-01982.
|
Routing - PUBLIC WORKS GRADING | 7/31/2001 | 7/31/2001 | 7/31/2001 | | DONE |
Rita DeYoung
|
|
|
Routing to Jim Wyllie for flood plain review.
JIM WYLLIE DIDN'T NEED TO LOOK AT IT WITHOUT A GRADING PLAN
|
Routing - PUBLIC WORKS | 7/24/2001 | 7/24/2001 | 7/31/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 7/30/2001 | 7/30/2001 | 7/30/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 7/24/2001 | 7/24/2001 | 7/25/2001 | | FAIL |
|
|
|
Does not meet solar setbacks. Talked to Angie at Homco.
|
Telephone call | | | 7/25/2001 | | DONE |
|
|
|
Talked to designer, will submit new plans.
|
Application received | | | 7/24/2001 | | |
|
|
|
|