Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01982
StatusFinaled
Name HOMCO DEVELOPMENT
Site Address 3300 S LONGLEAF AVE
Project NameFLOODPLAIN
Customer Number 
ePlanReviewNo
Description
To construct a 2278 sq. ft. two story single family dwelling (1147 sq. ft. first floor/1131 sq. ft. second floor) with a attached 826 sq. ft. three car garage and a 69 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar and shade restricted lot. CUP98-116 per Angie Brosious. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. JIM WYLLIE HAS RELEASED THE NON-BUILD IF CONSTRUCTED IN ACCORDANCE TO THE INFORMATION SUPPLIED BY QUADRANT. PC#544 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/1/20023/5/20023/5/2002APASS
DetailsAlan Hauser
steve ###-#### c/c#21677 3/5/2002 10:11:47 AM
DOC - Permit Finaled3/5/20023/5/20023/5/2002APASS
DetailsAlan Hauser
Finaled by inspector at 3/5/2002 10:11:49 AM
BLD-Aging Inspection1/28/20021/28/20021/28/2002 PASS
DetailsSteven Webb
wip--permit active 1/28/2002 7:51:06 AM
BLD-Framing/Rough-in11/27/200111/28/200111/28/2001APASS
DetailsSteven Webb
fr insp-- ???? larry =###-#### ok to cover 11/28/2001 10:53:21 AM
BLD-Energy code compliance11/26/200111/27/200111/27/2001APART
DetailsJim Storey
LARRY ###-#### c/n for gas line protection plates 11/27/2001 10:05:55 STYLE PER LISTING. REINSP REQUIRED OK TO COVER 2 ND FLOOR ONLY. 11/27/2001 10:06:52 AM
BLD-Framing/Rough-in11/19/200111/20/200111/20/2001APASS
DetailsSteven Webb
###-#### ok to insulate 11/20/2001 10:50:37 AM
BLD-Framing/Rough-in11/15/200111/16/200111/16/2001AFAIL
DetailsSteven Webb
###-#### LARRY c/n--air seal package not done--do not insulate 11/16/2001 10:16:25 AM
BLD-Framing/Rough-in11/6/200111/7/200111/7/2001APASS
DetailsSteven Webb
###-#### LARRY SHEER WALL --OK TO SIDE 11/7/2001 9:41:11 AM
BLD-Foundation9/17/20019/18/20019/18/2001APART
DetailsDave Hannah
fd logan ###-#### work in progress foundation plans dont show hold downs on back wall but framing plan shows 3 sets crew will check into this 9/18/2001 9:51:38 AM
BLD-Footing9/14/20019/14/20019/14/2001PPART
DetailsSteven Webb
logan ###-#### ft wip 9/14/2001 1:42:34 PM
Override - Parcel Holds  9/14/2001  
Override - Parcel Holds  9/14/2001  
Override - Parcel Holds  9/14/2001  
Override - Parcel Holds  9/14/2001  
Case Summary (BLD)  9/5/2001  
Override - Parcel Holds  9/4/2001  
Override - Parcel Holds  9/4/2001  
Issue PAID IN FULL permit  9/4/2001 DONE
Routing - PLAN CHECK7/31/20017/31/20018/22/2001 DONE
Plan assigned to (SAM)8/9/2001 8/22/2001 PASS
DetailsSteve Munroe
8/22/2001 10:22:34 SAM - activity updated through activity BLDA022 from case BLD01-01982.
PLANS/APPL TAKEN TO FRONT DESK  8/22/2001 DONE
Override - Parcel Holds  8/22/2001  
Override - Parcel Holds  8/22/2001  
Inspection Record Card- Bld  8/22/2001 DONE
Telephone call  8/22/2001 DONE
Plan Reviewer's activity  8/9/2001 PEND
8/9/01 11:52 I called and left a message for Steve with Homco to call me. I need a footing in the garage engineered and I wanted to let them know I DO NOT have the information for the flood plain yet.
Case Summary (BLD)  8/9/2001  
Plan Review Report  8/9/2001  
Plan Reviewer's activity  8/9/2001 PEND
8/9/01 Plan review is done. I am waiting for Jim Wyllie to release, floodplain.
Pending Assignment by DJO7/24/2001 8/9/2001 DONE
DetailsDan Overy
8/9/2001 08:20:39 SAM - activity updated through activity BLDA183 from case BLD01-01982.
Routing - PUBLIC WORKS GRADING7/31/20017/31/20017/31/2001 DONE
DetailsRita DeYoung
Routing to Jim Wyllie for flood plain review.

JIM WYLLIE DIDN'T NEED TO LOOK AT IT WITHOUT A GRADING PLAN
Routing - PUBLIC WORKS7/24/20017/24/20017/31/2001 DONE
Routing - PLANNING7/30/20017/30/20017/30/2001 PASS
Routing - PLANNING7/24/20017/24/20017/25/2001 FAIL
Does not meet solar setbacks. Talked to Angie at Homco.
Telephone call  7/25/2001 DONE
Talked to designer, will submit new plans.
Application received  7/24/2001