BLD-Final | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Tony Young
|
|
|
###-#### SHEILA
|
BLD-Grading Inspection | 3/7/2002 | 3/7/2002 | 3/7/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage has been approved by the engineer and Boise Public Works
|
DOC - Permit Finaled | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 3/7/2002 3:13:05 PM
|
BLD-Final | 3/5/2002 | 3/6/2002 | 3/6/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 13:17:20. Contact: ###-####. C/N on site. 3/6/2002 1:39:19 PM
|
BLD-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | PART |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/15/2001 | 11/19/2001 | 11/19/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### MIKE
|
BLD-Framing/Rough-in | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Tony Young
|
|
|
###-#### sheila 11/14/2001 3:32:56 PM
ok to insulate, some c/n items still posted 11/15/2001 10:11:43 AM
|
BLD-Framing/Rough-in | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | CANC |
Tony Young
|
|
|
###-#### SHELIA
|
BLD-Framing/Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | FAIL |
Tony Young
|
|
|
###-#### SHEILA
c/n posted, ok to insulate, need fp permit also 11/13/2001 11:15:45 AM
|
BLD-Framing/Rough-in | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | FAIL |
Steven Webb
|
|
|
shear -sheila ###-#### c/n posted on site. SHEAR 11/2/2001 3:11:23 PM
|
BLD-Foundation | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PART |
Tony Young
|
|
|
wall\\###-####
|
BLD-Footing | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Tony Young
|
|
|
DONNY ###-####
wip, ok pending soil report 9/6/2001 10:53:04 AM
|
BLD-Grading Inspection | 9/6/2001 | 9/6/2001 | 9/6/2001 | | DONE |
Rita DeYoung
|
|
|
Geotechnical Engineer has approved footing subgrade.
|
BLD-Concrete | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | PART |
Tony Young
|
|
|
clay ###-####
basement walls ok 8/24/2001 11:27:58 AM
|
BLD-Concrete | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | NR |
Tony Young
|
|
|
###-#### clay
|
BLD-Footing | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PART |
Tony Young
|
|
|
Clay ###-####
basment ftgs, verbal corrections 8/20/2001 11:38:27 AM
|
BLD-Footing | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | NR |
Tony Young
|
|
|
###-#### donny
|
BLD-Footing | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | NR |
Tony Young
|
|
|
will reschedule 8/17/2001 2:15:43 PM
|
Issue PAID IN FULL permit | | | 8/16/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/16/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/10/2001 | 8/10/2001 | 8/15/2001 | | PASS |
Dan Overy
|
|
|
8/15/2001 15:07:43 DJO - activity updated through activity BLDA022 from case BLD01-01990.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/15/2001 | | DONE |
|
|
|
permit ready
|
Plan Reviewer's activity | | | 8/10/2001 | | PEND |
|
|
|
wall line (1) to be re-engineered. cantilevered floor system to be revised. plans indicate (8) different foundation designs. (8) stamped foundation sections will be provided. when this information is received, permit will be issued. living room/entry/den walls need to be addressed for lateral.
|
Case Summary (BLD) | | | 8/10/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 8/10/2001 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/10/2001 | | |
|
|
|
|
Routing - PLANNING | 7/30/2001 | 7/30/2001 | 7/31/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/24/2001 | 7/24/2001 | 7/30/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/24/2001 | 7/24/2001 | 7/30/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to plans.
|
Application received | | | 7/24/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/31/2001 | 7/31/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 7/24/2001 | | | | PEND |
Dan Overy
|
|
|
|
Pending Assignment by DJO | 8/14/2001 | | | | PEND |
Dan Overy
|
|
|
|