Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01992
StatusFinaled
Name KEILTY CONSTRUCTION
Site Address 47 W HORIZON DR
Project NameRESIDENTIAL REMODEL
Customer Number 
ePlanReviewNo
Description
This project is for a 2100s.f. 3-story with basement addition to an esisting 2-story 3500s.f. single family dwelling. This project is fully engineered and will require special inspections for reinforced concrete as designed @ 3500psi and structural steel welding per 1997UBC Chapter 17. Smoke detectors per UBC 310.9 are required. R-1B setbacks ok per ajb and hwg not considered hillside per terry records less than 15% slope. All per the approved plans as marked and attached engineering. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/20/20032/20/20032/20/2003PPASS
DetailsTony Young
###-#### perry please call for access
l of c issued 2/20/2003 3:49:54 PM
DOC - Permit Finaled2/20/20032/20/20032/20/2003PPASS
DetailsTony Young
Finaled by inspector at 2/20/2003 3:49:28 PM
BLD-Final1/15/20031/16/20031/16/2003ACANC
DetailsRuss Owen
call first ###-####out of time rcalled for pm. 1/16/2003 12:55:29 PM
BLD-Final1/16/20031/16/20031/16/2003PFAIL
DetailsRuss Owen
This 1/16/2003 1:35:39 PMThis is not ready pre-inspection only, no plans and I have not much of an idea as to the work that was permited. I left a c/n for some items ,may need more pending plans and other mis from inspector with prior history. 1/16/2003 1:38:17 PM
BLD-Final1/15/20031/15/20031/15/2003PCANC
DetailsJim Storey
CALL FIRST ###-####
BLD-Conference10/30/200210/31/200210/31/2002APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
on attic issues, no firedoor reqd, guard rails, etc. 10/31/2002 10:43:09 AM
BLD-Conference10/4/200210/7/200210/7/2002APART
DetailsTony Young
###-#### KYLE
conf. on storage area, stairs, guardrail, handrail to meet code 10/7/2002 11:27:53 AM
BLD-Conference8/22/20028/23/20028/23/2002APASS
DetailsTony Young
###-#### TERRY PLEASE CALL 1ST
head room above winder stairs should finish out ok w/ 1/2" sheetrock. to get 6' 8" 8/23/2002 12:29:31 PM
BLD-Conference8/23/20028/23/20028/23/2002PPASS
DetailsTony Young
see other notes 8/23/2002 4:02:20 PM
BLD-Framing/Rough-in8/16/20028/19/20028/19/2002APASS
DetailsDave Hannah
###-#### perry everything on c/n list completed but for stairs they will need to be cheched at final 8/19/2002 10:46:55 AM
BLD-Framing/Rough-in8/12/20028/12/20028/12/2002PPART
DetailsDave Hannah
terry; Phone #: ###-#### 4 of 6 items complete ok to insulate 8/12/2002 2:37:13 PM
BLD-Energy code compliance8/12/20028/12/20028/12/2002PPART
DetailsDave Hannah
terry; Phone #: ###-#### seal package holes foamed but still needs to seal around bottom plate 8/12/2002 2:38:26 PM
BLD-Framing/Rough-in7/11/20027/11/20027/11/2002PFAIL
DetailsTony Young
###-#### perry
c/n posted 7/11/2002 2:52:50 PM
BLD-Conference7/2/20027/2/20027/2/2002PPART
DetailsTony Young
see other notes 7/2/2002 1:34:04 PM
BLD-Conference6/28/20027/2/20027/2/2002APART
DetailsTony Young
richard- ###-#### for conf
conf on stairs and loft w/ guardrail per code,,, storage only, just open to bed rooms 7/2/2002 1:33:43 PM
BLD-Conference6/28/20027/1/20027/1/2002ACANC
DetailsJim Sly
richard- ###-#### for conf Richard preferred to talk to insp over this area on stair issue. 7/1/2002 10:54:39 PM
BLD-Framing/Rough-in6/10/20026/11/20026/11/2002ANR
DetailsCarl Dependahl
shear wall brian ###-#### c/n...need eng'g...spec insp for moment frame??? recall 6/11/2002 1:04:01 PM
BLD-Framing/Rough-in6/11/20026/11/20026/11/2002PFAIL
DetailsCarl Dependahl
shear nailing, /c/n onsite...$42 fee due if eng'g not onsite for next insp...left msg w/ supt. 6/11/2002 1:09:10 PM
BLD-Wall cover4/1/20024/2/20024/2/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/01/2002 at 13:33:07. Contact: ###-####.Need attached egineering not on plan,also does not appear to be completed, contractor on site will recall. 4/2/2002 4:42:29 PM
BLD-Conference3/21/20023/21/20023/21/2002PPASS
DetailsAlan Hauser
went over hvac with heating contractor 3/21/2002 3:11:06 PM
BLD-Aging Inspection1/28/20021/28/20021/28/2002 PART
DetailsTony Young
BLD-Aging Inspection11/28/200111/28/200111/28/2001 PART
DetailsTony Young
wip 11/28/2001 9:37:52 AM
BLD-Foundation9/26/20019/27/20019/27/2001APART
DetailsTony Young
###-#### BOBwip, 9/27/2001 11:32:55 AM
BLD-Conference9/27/20019/27/20019/27/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/27/2001 9:34:39 AM w/ Bob Eason re concrete insp & found modification
BLD-Foundation9/24/20019/24/20019/24/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/24/2001 at 07:28:21. Contact: ###-####....ext portion fnd wall; hd's & imbeds not set; add'l eng'g req'd to change configuration of wall below existing dwelling to block. design is 2500psi. 9/24/2001 12:01:14 PM
BLD-Footing9/19/20019/20/20019/20/2001APART
DetailsTony Young
###-####
basement ftgs, wip, ok 9/20/2001 11:45:05 AM
Issue PAID IN FULL permit  8/22/2001 DONE
Inspector's copy Bld permit  8/13/2001 DONE
Plan Review Report  8/13/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/13/2001 DONE
Inspection Record Card- Bld  8/13/2001 DONE
Telephone call  8/13/2001 DONE
LEFT MESS THAT PERMIT IS READY
Plan Reviewer's activity  7/25/2001 PEND
plans/engineering reviewed by staff, determined that eng. of this magnitude shall be out sourced to 3rd party engineer. Red lined plans have been taken to records for copy, to be sent with plans and engineering calcs. plans will be sent out when copies return.pep 7/24/2001
Inspector's copy Bld permit  7/25/2001 DONE
Application received  7/24/2001  
Routing Off Site - STRUCTURAL7/25/20017/25/2001   
pdq to pick up 07/25/2K1