Fee Review-notes | 7/24/2001 | 7/24/2001 | 3/22/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/1/2003 | 10/1/2003 | 10/1/2003 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/2/2003 | 7/2/2003 | 7/2/2003 | | DONE |
Carl Dependahl
|
|
|
ph 2 7/2/2003 5:58:49 PM
|
BLD-Conference | 7/2/2003 | 7/2/2003 | 7/2/2003 | P | PASS |
Rick Jackson
|
|
|
Rick, call Carl D. this is okay for fire final 7/2/2003 2:50:06 PM
|
FIRE-Final Inspection | 7/2/2003 | 7/2/2003 | 7/2/2003 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 7/2/2003 | 7/2/2003 | 7/2/2003 | P | PASS |
Carl Dependahl
|
|
|
struct. ok for l/c...parking/drainage, etc have been superceded by adjacent project permits 7/2/2003 6:02:30 PM
|
BLD-Conference | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Carl Dependahl
|
|
|
remainder of site work may complete w/ following expansion. bld02-02687? 2/14/2003 3:00:12 PM
|
BLD-Conference | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/26/2002 4:05:01 PM ...need revised landscape/parking plan submitted for review to P&Z, etc. 3/26/2002 4:44:12 PM
|
BLD-Conference | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PASS |
Carl Dependahl
|
|
|
###-#### phase 2 stair rail upgrade ok. 3/25/2002 11:11:09 AM
|
BLD-Conference | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Carl Dependahl
|
|
|
rick ###-####; re stairs: remove underlay at top of run, adjust other risers to best result...existing steel framed stair. Stairs at other side will require proper rails per 1003,ubc. 2/25/2002 5:17:03 PM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Jim Storey
|
|
|
###-#### rick ceilling ok /stair riser at top of run 8 inches. 2/22/2002 2:42:24 PM
|
BLD-Final | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/7/2002 11:29:29 AM ok to cover, verify efis specs when onsite; 75/450 max
|
BLD-Framing/Rough-in | 2/5/2002 | 2/6/2002 | 2/6/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### furring ok to cover at entry...need weld report. 2/6/2002 4:47:43 PM
|
BLD-Framing/Rough-in | 1/2/2002 | 1/3/2002 | 1/3/2002 | A | PART |
Carl Dependahl
|
|
|
###-####...front ca 1/3/2002 12:18:44 PM nopies ok, need welds certified 1/3/2002 12:18:56 PM 1/3/2002 12:19:41 PM
|
BLD-Framing/Rough-in | 1/2/2002 | 1/3/2002 | 1/3/2002 | P | PART |
Carl Dependahl
|
|
|
###-####...rear deck beams & joists ok 1/3/2002 12:20:49 PM
|
BLD-Framing/Rough-in | 12/21/2001 | 12/26/2001 | 12/26/2001 | A | PART |
Carl Dependahl
|
|
|
RICK ###-#### "west" entry roof framing ok to cover. 12/26/2001 10:43:25 AM
|
BLD-Conference | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/17/2001 12:05:11 PM re struct details; complete stairs, rails, etc...elev ok. w/ ph.1
|
BLD-Foundation | 11/21/2001 | 11/23/2001 | 11/23/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### RICK
|
BLD-Foundation | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 08:48:06. Contact: ###-####.
|
BLD-Foundation | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | CANC |
Jim Storey
|
|
|
###-#### RICK carl did insp. 11/15/2001 9:30:39 AM
|
BLD-Foundation | 11/15/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/15/2001 10:56:06 AM east ext ftg/frost wall at entry ok
|
BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/13/2001 12:25:47 PM w/ bldr & arch onsite re exit reqs
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/22/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2001 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 10/22/2001 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 7/27/2001 | | 10/22/2001 | | PASS |
Jason Blais
|
|
|
10/22/2001 08:36:12 JCB - activity updated through activity BLDA022 from case BLD01-01993.
|
Routing - PLAN CHECK | 10/9/2001 | | 10/22/2001 | | PASS |
|
|
|
Plans and permit approved and taken to front desk.
|
Plan resubmittals received | | | 10/19/2001 | | DONE |
|
|
|
Received plan resubmittal of sheet A2.2 with Detail sheet. Routed to Jason Blais.
|
Plan resubmittals received | | | 10/18/2001 | | DONE |
|
|
|
Received resubmittal of sheet A2.2. routed to Jason Blais.
|
Plan resubmittals received | | | 10/12/2001 | | DONE |
|
|
|
Received resubmittal sheets A2.0, A2.1, A3.0, A3.1, A3.2, A3.3, engineering calculations and letter from Ward Schwider (Cole & Associates) and forwarded to Jason.
|
Plan resubmittals requested | | | 10/9/2001 | | |
|
|
|
Plan resubmittals, engineering, and written response required for further review.
|
Routing - PLAN CHECK | 9/19/2001 | | 10/9/2001 | | FAIL |
|
|
|
Plan review report faxed to architect and structural engineer. Resubmittal sheets, engineering, and written response required for further review.
|
Plan resubmittals received | | | 10/2/2001 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A2.1, A2.2, A3.0, A3.1, A3.2, A3.3. Four copies of A5.0. One copy of ICBO evaluation report 5695 and one copy of ER 5567 Two copies of letters to Ward Schwider from Eric Wolfe. One copy of tewst data on seagray faze brick, wind velocity to static pressure conversion table, one copy of winload chart A and B. Two copies of additional calcs. Routed to Jason B. KMM
|
Plan Review Completed(1st rev) | | | 9/19/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 9/14/2001 | | 9/19/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 9/14/2001 | | |
|
|
|
Resubmittal plan package required for new full review.
|
Routing - PLAN CHECK | 7/31/2001 | | 9/14/2001 | | FAIL |
|
|
|
Letter sent to architect, engineer, and owner. Plans inadequate. Resubmittal package required for new full review. Plans routed to Fire Dept.
|
Routing - PLANNING | 7/30/2001 | | 7/31/2001 | | PASS |
|
|
|
Approved per DRH01-00093.
|
Routing - PUBLIC WORKS | 7/27/2001 | | 7/30/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/24/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 7/24/2001 | | DONE |
|
|
|
|
Application received | | | 7/24/2001 | | |
|
|
|
|