Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-01994
StatusFinaled
Name W.H. MOORE CO.
Site Address 700 N ANCESTOR PL
Project NameALBERTSON'S DATA CENTER
Customer Number 
ePlanReviewNo
Description
ALBERTSON DATA CENTER (SHELL PERMIT)-TO CONSTRUCT A NEW 32,880 SQUARE FOOT, ONE STORY, OFFICE AND DATA STORAGE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS WITH STEEL STRUCTURAL INTERIOR COLUMNS AND GIRDERS AND A STEEL ROOF JOIST SYSTEM WITH METAL ROOF DECK AND BUILT-UP ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ALLOWABLE AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. PC#0618-01/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  8/23/2002 DONE
Letter of Compliance #22565 issued 8-23-02.
FIRE-Final Inspection8/22/20028/22/20028/22/2002APASS
DetailsTroy Cobbley
Fire life/safety, fire alarm and fire sprinkler finaled
BLD-Final8/22/20028/22/20028/22/2002PPASS
DetailsJim Sly
Letter of approval from Pinnacle Engineers and letter from MTI.
Code Occupancy Approval8/12/20028/12/20028/12/2002PPASS
DetailsScott M.Brown
EVERYTHING IN PLACE, FINAL SIGNED. 8/12/2002 3:50:10 PM
BLD-Concrete2/21/20022/25/20022/25/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/21/2002 at 08:25:47. Contact: ###-####. Subject to S-I. 2/25/2002 4:40:26 PM
BLD-Framing/Rough-in2/22/20022/25/20022/25/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/22/2002 at 14:56:54. Contact: ###-####. wip ok to cover elec room and ext furred out walls 2/25/2002 9:24:50 AM
BLD-Aging Inspection1/8/20021/8/20021/8/2002 PART
DetailsRuss Owen
wip 1/15/2002 9:06:20 AM
BLD-Foundation11/7/200111/8/200111/8/2001APART
DetailsRuss Owen
pending s-i. 11/8/2001 3:22:00 PM
BLD-Footing10/22/200110/23/200110/23/2001APASS
DetailsDave Hannah
###-#### mti inspecting rebar and concrete 10/23/2001 9:52:00 AM
BLD-Foundation10/19/200110/22/200110/22/2001APART
DetailsRuss Owen
###-#### MIKE . ok pending s-i. 10/22/2001 4:09:19 PM
Override - Parcel Holds  10/19/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Parcel hold for building bld01-01994 only until record of survey is recorded. Grading - bld01-01995, may be issued at this time. Per Marlene and April. KMM
(F) Reprint permit  10/8/2001 DONE
Override - Parcel Holds  10/5/2001  
Issue PAID IN FULL permit  10/5/2001 DONE
CHANGE STATUS TO (R)  10/4/2001 DONE
Routing - PUBLIC WORKS10/1/2001 10/4/2001 PASS
Being released per Tim Hogland 10/4/01 will completed record of survey requirement at a later date. AEM
Sent plans back to permit counter 10/04/01
CHANGE STATUS TO (PND)  10/1/2001 DONE
holding for record of servey April has them
Print Occupancy Form  9/14/2001 DONE
Override - Parcel Holds  9/14/2001  
Inspection Record Card- Bld  9/14/2001 DONE
Telephone call  9/14/2001 DONE
left message w/cornell gave dollar amount and achd impact fee's due
Routing - PLAN CHECK8/27/2001 9/13/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/13/2001 PASS
Plan assigned to (JCM)7/24/2001 9/13/2001 PASS
DetailsJohn Menard
9/13/01 14:34:12 JCM - activity updated through activity BLDA022 from case BLD01-01994.
Plan resubmittals received  9/6/2001 DONE
Received two copies of revised sheet S3.02 and one copy of response letter to the second set of structural plan review comments dated 9-4-01. Routed to John M. KMM
Plan resubmittals requested  9/4/2001  
Faxed the architect of record a copy of the comment list from the consulting engineer requesting additional calculations. JCM
Routing Off Site - STRUCTURAL8/20/2001 8/31/2001 FAIL
Resubmittals of 8-20-01 sent to outside eng. via pdq. KMM
Routing - PUBLIC WORKS8/27/2001 8/27/2001 PASS
Routing - PLAN CHECK8/16/2001 8/27/2001  
HOLD. Waiting for resubmittals to address conditions.
Plan resubmittals received  8/20/2001 DONE
Received three copies of revised sheets S0/01. S1/02. S2/01. S3/01. S3/02. S3/03. S4.01, S4.02, S5.01, S5.02, S5.03, S5.05. Three copies of structural review comments and response letter and calculations. Routed to John M. kmm
Routing - PLUMBING8/14/2001 8/15/2001 PASS
C-1 still shows interceptor connection to sewer, plans approved with out interceptor/sewer connection per page P1.0 resubmitted 8/8/01
Routing - PLAN CHECK8/10/2001 8/14/2001  
Plan resubmittals requested  8/14/2001  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL7/25/2001 8/13/2001 FAIL
Sent plans to consulting engineer via PDQ. 7/24/01 DAR Received a comment list from the consulting engineer requesting revisions. JCM
Routing - FIRE8/7/2001 8/10/2001 PASS
VERIFY HYDRANT FLOW WHEN INSTALLED
Routing - PLAN CHECK8/3/2001 8/7/2001 PASS
Plan Reviewer's activity  8/6/2001 PASS
Plans reviewed and approved as submitted with attached comment list. JCM
Routing - PUBLIC WORKS7/26/2001 8/2/2001 FAIL
Site plan doesn't comply with recorded plat and /or legal description per April Miller
Routing - PLUMBING8/2/2001 8/2/2001 FAIL
no connection from glycol system to sewer will be permitted. resubmit page p1.0
First Notice7/24/20017/24/20017/24/2001 DONE
Plans ACCEPTED BY PLAN TECH  7/24/2001 DONE
Routing - PLANNING7/24/2001 7/24/2001 PASS
Approved per DRH01-00123.
Application received  7/24/2001  
Override - Parcel Holds  7/24/2001  
Recd Pcfee & Taken To Pln CK  7/24/2001 DONE
Routing Off Site - STRUCTURAL9/6/2001    
contacted pdq to take revised plans of 9/6/01 to outside eng. KMM