Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02028
StatusFinaled
Name HA' PENNY BRIDGE & HAPPY FISH SUSHI
Site Address 855 W BROAD ST STE 250
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(HA' PENNY BRIDGE & HAPPY FISH SUSHI) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To create a 4,400 square foot restaurant/bar and construct tenant improvements. This tenant will also have additional seating on a common exterior porch. Work is to include interior nonbearing walls, infilled openings in a 1-hr corridor wall, a raised platform, a gypsum board ceiling, a suspended ceiling, a 1-hr shaft for a grease duct, mill work, and equipment all per approved drawings and plan review conditions on file. The Ha'Penny Bridge portion of this tenant space shall have the maximum allowed occupant load (143) posted on a permanent sign near the main exit. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH00-00252 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/10/20037/10/20037/10/2003 DONE
Permanent occupancy  4/1/2002 DONE
Perm. Occ. Cert. #9093 issued 4-1-02 to the Ha' Penny Bridge & Happy Fish Sushi.
BLD-Final3/28/20023/29/20023/29/2002APASS
DetailsCarl Dependahl
###-#### barry ok for c/o. 3/29/2002 4:15:29 PM
Permanent Occupancy 3/29/20023/29/2002 DONE
Details
BLD-Conference3/28/20023/28/20023/28/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/28/2002 10:25:35 AM keep t/o open...wip
BLD-Conference3/15/20023/15/20023/15/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/15/2002 9:43:42 AM w/ Cathy W...need reinsp...call contractor to inform. 3/15/2002 11:20:53 AM
Fee Review-notes7/26/20017/26/20011/14/2002 DONE
Temporary occupancy  12/28/2001 PART
Temp. Occ. Cert. #4693 issued 12-28-01 to Ha'Penny Bridge & Happy Fish Sushi.
FIRE-Final Inspection12/26/200112/27/200112/27/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/26/2001 at 17:23:39. Contact: ###-####.
BLD-Final12/26/200112/27/200112/27/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/26/2001 at 17:25:24. Contact: ###-####. c/n, int/ext finish...ext rails, eng's stamp on letter of approval 12/27/2001 5:16:28 PM
FIRE-Final Inspection12/27/200112/27/200112/27/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/27/2001 at 11:05:30. Contact: ###-####.
FIRE-Final Inspection12/26/200112/26/200112/26/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/26/2001 at 07:36:28. Contact: ###-####. need door to corridor with closure and hardware; occupant load sign 12/26/2001 4:56:43 PM
FIRE-Final Inspection12/21/200112/24/200112/21/2001PCANC
DetailsRick Jackson
fire fn ###-#### Disp set to [CANC] by a contractor via Hello! on 12/21/2001 at 18:35:05.
BLD-Final12/21/200112/24/200112/21/2001PCANC
DetailsCarl Dependahl
pending fire & elec insp john ###-#### Disp set to [CANC] by a contractor via Hello! on 12/21/2001 at 18:35:45.
FIRE-Final Inspection12/19/200112/21/200112/21/2001PNR
DetailsRick Jackson
JIM ###-#### will reschedule 12/21/2001 2:02:00 PM
FIRE-Final Inspection12/19/200112/21/200112/21/2001ACANC
DetailsRick Jackson
JIM ###-####
BLD-Final12/20/200112/21/200112/21/2001PNR
DetailsCarl Dependahl
late late pm ###-####
BLD-Conference12/20/200112/21/200112/21/2001APASS
DetailsCarl Dependahl
###-####...w/ arch & bldr...grid ok to chk at final...need eng's statement re shell. 12/21/2001 11:28:01 AM
BLD-Final12/18/200112/19/200112/19/2001ANR
DetailsCarl Dependahl
###-####; nr 12/19/2001 10:32:48 AM
BLD-Framing/Rough-in12/19/200112/19/200112/19/2001APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/19/2001 10:32:01 AM grid clg, add seismics, met w/ arch. onsite...need eng's letter/ approval for shell bld 01-00917? 12/19/2001 12:12:41 PM
BLD-Framing/Rough-in11/5/200111/6/200111/6/2001APART
DetailsCarl Dependahl
###-####...type 2 exhaust duct chase to be filled w/ insulation, consult w/ Rick J.11/6/2001 12:05:41 PM 11/6/2001 12:06:26 PM
BLD-Framing/Rough-in10/22/200110/23/200110/23/2001APART
DetailsCarl Dependahl
###-#### ok to 1-side at sushi bar & where ok'd by elec; awaiting resubs for potential elec/hvac changes...consult Marv & Dave L. 10/23/2001 5:07:18 PM
Plan resubmittals received  10/23/2001 DONE
Received two copies of M1.0 sheet. Routed to Carl D. KMM
BLD-Conference10/18/200110/18/200110/18/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/18/2001 6:06:40 PM ok to shift/extend shaft if equal const used.
BLD-Framing/Rough-in10/15/200110/15/200110/15/2001PPART
DetailsCarl Dependahl
###-####, shaft thru 2nd fl ok; complete firestops at bsmt lid penetrations; need other r/i's for cover. 10/15/2001 3:08:46 PM
BLD-Framing/Rough-in10/1/200110/2/200110/2/2001APART
DetailsCarl Dependahl
###-#### JIM met w/ bldr at site; obtain other r/is...has prior shell permit bld01-00917 w/ no insps??? 10/2/2001 12:20:05 PM
BLD-Framing/Rough-in9/28/200110/1/200110/1/2001APART
DetailsCarl Dependahl
fr jim ###-#### int wall oend elec 10/1/2001 5:03:19 PM
Issue PAID IN FULL permit  8/31/2001 DONE
Plan assigned to (CJW)7/30/2001 8/30/2001 PASS
DetailsCarl Westfall
8/30/01 08:56:00 CJW - activity updated through activity BLDA022 from case BLD01-02028.
Routing - PLAN CHECK8/28/2001 8/30/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/30/2001 PASS
Inspection Record Card- Bld  8/30/2001 DONE
Print Occupancy Form  8/30/2001 DONE
Telephone call  8/30/2001 DONE
Routing - FIRE8/23/2001 8/28/2001 PASS
Routing - PLUMBING8/28/2001 8/28/2001 PASS
Sent back for resubmittal review. per plans and 97 upc
Plan Review Completed(1st rev)  8/28/2001  
Failed first UPC review.
Routing - PLAN CHECK8/7/2001 8/23/2001 PASS
Plan Reviewer's activity  8/22/2001 PASS
UBC plan review started August 9, 2001 and finished August 23, 2001. The drawings were approved with conditions. See the conditions list. The Plan Reviewer was on vacation for 10 days during this time period.
Routing - PLUMBING8/3/2001 8/7/2001  
Failed first UPC review. connect all kitchen floor sinks to grease waste per cdhd notes, vent all traps, resubmit P1.0, floor sinks and indirect waste receptors will not be allowed under equipment or with in a cabinet, must be exposed, verify with field inspector, additional cross connection protection may be required.
Routing - PLANNING8/1/2001 8/3/2001 PASS
Jeff Neberman. Passed as per DHH01-00252
Routing - PUBLIC WORKS7/30/2001 8/1/2001 PASS
Plans ACCEPTED BY PLAN TECH  7/27/2001 DONE
Had Carl look over plans due to some sheets not being stamped or signed. He stated he is ok with it. KMM
Received Certificate of Value  7/26/2001 DONE
Application received  7/26/2001