Fee Review-notes | 7/10/2003 | 7/10/2003 | 7/10/2003 | | DONE |
|
|
|
Additional value from subcontractor.
|
Permanent occupancy | | | 4/15/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9104 issued 4-15-02 to Lee's Candies.
|
Permanent Occupancy | | 4/9/2002 | 4/9/2002 | | DONE |
|
|
|
|
BLD-Final | 4/9/2002 | 4/9/2002 | 4/9/2002 | | DONE |
|
|
|
Final approval by 301
|
Fee Review-notes | 7/27/2001 | 7/27/2001 | 2/7/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 2/6/2002 | | PART |
|
|
|
Temp. Occ. Cert. #4721 issued 2-6-02 to Lee's Candies.
|
Code Occupancy Approval Temp | | | 2/5/2002 | | PEND |
|
|
|
Temporary Occupancy approved pending posting of $1,551.00 bond.
|
Code Occupancy Approval | 1/31/2002 | 1/31/2002 | 1/31/2002 | A | FAIL |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 1/31/2002 12:24:52 PM Inspection noted that the landscaping is not completed, the doors to the trash enclosure are missing, 1/31/2002 12:27:08 PM
|
FIRE-Final Inspection | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Rick Jackson
|
|
|
mike ###-#### fire fn
|
BLD-Final | 1/29/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Jim Storey
|
|
|
fn occ bld--mike ###-#### temp ok pending others sign off. 1/30/2002 2:38:51 PM
|
Print Occupancy Form | | | 1/22/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/13/2001 | 12/14/2001 | 12/14/2001 | P | PASS |
Jim Storey
|
|
|
fr insp-- mike ###-####
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | P | PART |
Russ Owen
|
|
|
fr insp-- ken ###-#### . working on wall tie-downs ok to cover with plywood. 12/7/2001 4:33:49 PM
|
BLD-Foundation | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Jim Storey
|
|
|
###-#### DONNY walls ok 11/7/2001 5:06:39 PM
|
BLD-Footing | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PASS |
Jim Storey
|
|
|
###-#### DONNY ft ok 11/6/2001 3:06:36 PM
|
Issue PAID IN FULL permit | | | 10/24/2001 | | DONE |
|
|
|
|
Test Expiration Notice | | | 10/17/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/8/2001 | | 10/9/2001 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 10/9/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/9/2001 | | DONE |
|
|
|
permit ready
|
Plan assigned to (MLO) | 7/30/2001 | | 10/9/2001 | | PASS |
Mike Otto
|
|
|
10/9/2001 09:03:03 MLO - activity updated through activity BLDA022 from case BLD01-02053.
|
Routing - FIRE | 10/8/2001 | 10/8/2001 | 10/8/2001 | | PASS |
|
|
|
approved subject to agreement to sprinkler bldg in three years.
|
Routing - PLAN CHECK | 10/3/2001 | | 10/8/2001 | | |
|
|
|
|
Routing - FIRE | 10/1/2001 | | 10/3/2001 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 9/28/2001 | | DONE |
|
|
|
received 2 revised copies of A6.0 and routed to Mike Otto
|
Routing - FIRE | 9/19/2001 | | 9/19/2001 | | FAIL |
|
|
|
still need hydrant locations and total water supply available
|
Routing - PLAN CHECK | 9/14/2001 | | 9/17/2001 | | PEND |
|
|
|
10-01-01 - status changed to pending regarding Code review of new proposal for a four hour area wall. Previous approval was based on a two hour area wall. MLO
|
Plan resubmittals received | | | 9/14/2001 | | DONE |
|
|
|
Received two copies of A6.0 and one cover letter. Routed to Mike O. KMM
|
Plan resubmittals received | | | 8/29/2001 | | DONE |
|
|
|
received revised sheets T1.0 and A2.1. Two copies of each and routed to Mike Otto. aml
|
Telephone call | | | 8/29/2001 | | DONE |
|
|
|
receivedd call from architect's office that letter from engineer was not included with resubmittal and will be delivered. MLO
|
Routing - PLAN CHECK | 8/29/2001 | | 8/29/2001 | | FAIL |
|
|
|
area wall corrections.
|
Routing - FIRE | 8/29/2001 | | 8/29/2001 | | FAIL |
|
|
|
need hydrant flow information
|
Routing - FIRE | | | 8/16/2001 | | FAIL |
|
|
|
originally passed. apparently there is a problem with hydrant flow . need resubmittal.
|
Plan Review Completed(1st rev) | | | 8/16/2001 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/15/2001 | | FAIL |
|
|
|
UBC Corrections
|
Routing - PLAN CHECK | 8/3/2001 | | 8/15/2001 | | FAIL |
|
|
|
corrections faxed and mailed to architect.
|
Routing - PLANNING | 7/31/2001 | | 8/3/2001 | | PASS |
|
|
|
Approved per DRH01-02053 and as noted on sheet A1.0 site plan. It has been requested to replace the tire bumpers in the parking lot as they are corroded and unsightly. Painted stripes shall be added at entry to Lee's Candies back door to keep motocycles and bicycles from parking there. Applicant has agreed to these redlines.
|
Routing - PLUMBING | 8/3/2001 | | 8/3/2001 | | PASS |
|
|
|
1/2" cold water line to new fixtures is too small, increase to 3/4", vents required on floor sinks and drain in restroom, additional cross connection protection may be required, roof drainage must be piped to an approved location.
|
Plans ACCEPTED BY PLAN TECH | | | 7/30/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/30/2001 | | 7/30/2001 | | PASS |
|
|
|
|
Application received | | | 7/27/2001 | | |
|
|
|
|
Routing Off Site - C.D.H | 7/21/2001 | | 7/21/2001 | | PASS |
|
|
|
|