Case Summary (BLD) | | | 5/14/2012 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/20/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9173 issued 6-14-02 to Larry Miller Automotive Co. Sundance Dodge.
|
Permanent Occupancy | | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
|
BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/13/2002 4:03:55 PM Ok perm oc. 6/13/2002 4:39:51 PM
|
Fee Review-notes | 7/30/2001 | 7/30/2001 | 5/23/2002 | | DONE |
|
|
|
|
BLD-Final | 5/20/2002 | 5/21/2002 | 5/21/2002 | A | FAIL |
Russ Owen
|
|
|
###-####. need the glass in the door to managers office ,safety glass no etching on glass, only other item is need engineer to appr 5/21/2002 3:42:20 PM ove final special insp report. Called contractor.5/21/2002 3:42:38 PM 5/21/2002 3:46:36 PM
|
BLD-Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | FAIL |
Russ Owen
|
|
|
Robert ###-####. The fire glass has been put in ok. The door to office manager, does not have a safety glass stamp. Note this glass was not in the door at last inspection. That is why I was verifiying this day ,called contractor left message. 4/12/2002 12:16:58 PM
|
FIRE-Final Inspection | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | CANC |
Troy Cobbley
|
|
|
duplicate inspection 3/13/2002 10:10:41 AM
|
FIRE-Alarm Testing | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety OK. Fire alarm finaled 3/13/2002 10:09:36 AM
|
BLD-Final | 3/12/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Russ Owen
|
|
|
###-#### TOM. Would be ok for a temp oc with approval from zoning. c/n for glazing at office window to be replaced with fire rated. Wired glass now. 3/13/2002 4:21:03 PM
|
Temporary occupancy | | | 3/13/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4747 issued 3-13-02 to Sundance Dodge for the collision center remodel.
|
FIRE-Final Inspection | 3/6/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Troy Cobbley
|
|
|
need striping in front of FDC and curbs painted. Needs fire alarm final. Fire sprinklers are OK and finaled 3/8/2002 10:31:36 AM
|
BLD-Final | 3/6/2002 | 3/8/2002 | 3/8/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 16:59:15. Contact: ###-####.
|
BLD-Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/7/2002 4:23:47 PM n/r 3/8/2002 2:58:53 PM
|
FIRE-Final Inspection | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | CANC |
Troy Cobbley
|
|
|
cancelled by contractor 3/7/2002 11:26:00 AM
|
BLD-Final | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/7/2002 4:21:05 PM
|
BLD-Final | 2/28/2002 | 3/5/2002 | 3/5/2002 | A | NR |
Russ Owen
|
|
|
###-####
|
FIRE-Final Inspection | 2/28/2002 | 3/5/2002 | 3/5/2002 | A | NR |
Troy Cobbley
|
|
|
no fire alarm or fire sprinkler drawings on site 3/5/2002 12:10:32 PM
|
BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/5/2002 10:59:43 AM Needs all other required sign before calling for final. 3/5/2002 4:31:25 PM
|
FIRE-Conference | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | DONE |
Troy Cobbley
|
|
|
Met with contractor and discussed location on fire extinguishers in shop, autobody and parts areas. Also discussed location of exit signs and emergency lights. Contractor to change door hardware to approved type in existing areas. Fire sprinkler contractor to revise and resubmitt sprinkler drawings 2/22/2002 2:07:25 PM
|
BLD-Other | 2/21/2002 | 2/21/2002 | 2/21/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 07:12:15. Contact: ###-####. Needs 2nd wire support at light cans also rest room needs permimeter support wires. Verify at next inspection, contractor at site for inspection (Sahara). 2/21/2002 12:14:02 PM
|
BLD-Wall cover | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 11:28:20. Contact: ###-####.drywall above ceiling ok grid ceiling needs all pereimeters. 2/19/2002 11:44:56 AM
|
BLD-Conference | 2/4/2002 | 2/4/2002 | 2/4/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/4/2002 12:54:01 PM Went over existing stairs will be moved back for req head room clearance. 2/4/2002 1:03:28 PM
|
BLD-Framing/Rough-in | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | PART |
Russ Owen
|
|
|
###-#### wood framing at new addtion only. still needs ele and plm and mec but called for pre insp. will need to recall. 1/31/2002 4:53:59 PM
|
BLD-Framing/Rough-in | 1/24/2002 | 1/28/2002 | 1/28/2002 | A | PART |
Russ Owen
|
|
|
###-####. Exterior shear. 1/28/2002 11:02:36 AM
|
BLD-Foundation | 1/15/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 15:58:33. Contact: ###-####.subject to si. 1/17/2002 12:59:25 PM
|
BLD-Foundation | 1/11/2002 | 1/14/2002 | 1/14/2002 | A | PART |
Russ Owen
|
|
|
JARED ###-####. Requires special inspection pending report. 1/15/2002 9:17:42 AM
|
BLD-Foundation | 1/11/2002 | 1/14/2002 | 1/14/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 11:56:43. Contact: ###-####. Requires special inspection pending report. 1/15/2002 9:18:17 AM
|
BLD-Footing | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 17:13:31. Contact: ###-####.design requires special inspection. 1/10/2002 9:16:05 AM
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | PART |
Russ Owen
|
|
|
|
Issue PAID IN FULL permit | | | 10/15/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2001 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/1/2001 | | 10/3/2001 | | PASS |
John Menard
|
|
|
10/3/01 08:27:42 JCM - activity updated through activity BLDA022 from case BLD01-02064.
|
Routing - PLAN CHECK | 8/28/2001 | | 10/2/2001 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/19/2001 | | 10/2/2001 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 9/19/01 to outside eng. KMM Received fax from the consultng structural engineer approving resubmittals. JCM
|
Plan Reviewer's activity | | | 9/26/2001 | | PASS |
|
|
|
Resubmitted plan sheets reviewed and approved with attached comment list and redlined plan notes. JCM
|
Plan resubmittals received | | | 9/19/2001 | | DONE |
|
|
|
Received 2 revised copies of G-001, 2, 3, 4 & 6, G-100, 101 & 102, CD-101, 103, 104 & 105, A-101, 102, 104 & 106, A-201, 202 & 203, A-301, 302, 303 & 304, A-401 & 402, A-501 & 502, A-601 & 602, A-701, IF-501, L1, P-201 & 202, P-501. Received 3 revised copies of S1.1, S2.2, S3.1, S2.1, S5.1, S7.1. One copy of Structural sent to outside engineering. The rest was routed to John Menard.
|
BLD-Framing/Rough-in | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### JAY. called in the wrong permit number. 9/17/2001 11:27:18 AM
|
Plan resubmittals requested | | | 9/7/2001 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/22/2001 | | 9/6/2001 | | FAIL |
|
|
|
contacted pdq to take plans to outside eng. KMM Received a fax from the consulting structural engineer requesting revisions. JCM
|
Plan Review Completed(1st rev) | | | 8/27/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 8/22/2001 | | 8/27/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 8/22/2001 | | |
|
|
|
Mailed the architect of record a copy of the comment list requesting revisions. JCM
|
Additional plans submitted | | | 8/22/2001 | | DONE |
|
|
|
Received third set of plans for outside eng. Let John know that plans are here. KMM
|
Routing - PLAN CHECK | 8/8/2001 | | 8/22/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 8/6/2001 | | 8/8/2001 | | PASS |
|
|
|
per plans and 97 upc
|
Routing - PLANNING | 8/2/2001 | | 8/6/2001 | | PASS |
|
|
|
Approved by T. Curren and TKW per DRH01-112 and DRH00-150.
|
Routing - PUBLIC WORKS | 8/1/2001 | | 8/2/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2001 | | DONE |
|
|
|
Requested third set of plans from Erwin Ashenfelter, Larry Miller Automotive Co. Telephone ####-####. Third set is to send to consultanting engineer per John Menard's instructions. 8/1/01 DAR
|
Application received | | | 7/30/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2001 | | DONE |
|
|
|
|