BLD-Final | 1/8/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Steven Webb
|
|
|
Jason, ###-#### c. of c. #20974 issued 1/9/2002 3:34:49 PM
|
DOC - Permit Finaled | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 1/9/2002 3:35:01 PM
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 | | PART |
Steven Webb
|
|
|
wip 12/11/2001 8:30:47 AM
|
BLD-Energy code compliance | 10/10/2001 | 10/10/2001 | 10/10/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 10/10/2001 8:40:21 AM
|
BLD-Energy code compliance | 10/8/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 09:44:36. Contact: ###-####. c/n--interior shear panel and master bedroom insulation not per wassun--change to comply with wassun or submitt new energy report--ok to cover except m. bed and over shear panel--interior. 10/9/2001 2:48:04 PM
|
BLD-Framing/Rough-in | 10/4/2001 | 10/8/2001 | 10/8/2001 | P | PART |
Steven Webb
|
|
|
jason ###-#### Shear panels still needs repairs--ok to insulate. 10/8/2001 2:02:37 PM
|
BLD-Energy code compliance | 10/4/2001 | 10/5/2001 | 10/5/2001 | P | PART |
Steven Webb
|
|
|
jason ###-#### c/n--ok to insulate--Not Energy this inspection was a framing. 10/5/2001 3:01:56 PM
|
BLD-Framing/Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | PASS |
Steven Webb
|
|
|
###-#### SHEAR-OK TO SIDE 9/26/2001 10:26:22 AM
|
BLD-Foundation | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PART |
Steven Webb
|
|
|
found wall-- mana- ###-#### wip 8/28/2001 10:53:02 AM
|
BLD-Footing | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PART |
Steven Webb
|
|
|
###-#### mana wip 8/27/2001 2:38:48 PM
|
Override - Parcel Holds | | | 8/27/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/27/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/23/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/1/2001 | 8/1/2001 | 8/22/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/10/2001 | | 8/22/2001 | | PASS |
Steve Munroe
|
|
|
8/22/2001 07:27:18 SAM - activity updated through activity BLDA022 from case BLD01-02076.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/22/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/22/2001 | | DONE |
|
|
|
talked to Mike gave dollar amount
|
Plan Reviewer's activity | | | 8/10/2001 | | PEND |
|
|
|
8/10/01 9:15 I called and talked to Bob with Pinnacle. I had a question on "North Wall Living Room" in regards to the holdowns.
|
Case Summary (BLD) | | | 8/10/2001 | | |
|
|
|
|
Plan Review Report | | | 8/10/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/10/2001 | | PEND |
|
|
|
8/10/01 Plan review is done. I'm waiting for Jim Wyllie to release the lot. (floodplain)
|
Pending Assignment by DJO | 7/31/2001 | | 8/10/2001 | | DONE |
Dan Overy
|
|
|
8/10/2001 07:39:33 SAM - activity updated through activity BLDA183 from case BLD01-02076.
|
Routing - PUBLIC WORKS | 7/31/2001 | 7/31/2001 | 8/1/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 7/31/2001 | 7/31/2001 | 7/31/2001 | | PASS |
|
|
|
|
Application received | | | 7/31/2001 | | |
|
|
|
|