Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-02099
StatusFinaled
Name SILVER CREEK HOMES
Site Address 402 W HIGHLAND ST
Project Name 
Customer Number 
ePlanReviewNo
Description
MASTER FILE #01-07-003 To construct a 2287 sq. ft. two story single family dwelling (1361 sq. ft. first floor/926 sq. ft. second floor) with a 118 sq. ft. basement, a attached 848 sq. ft. two car garage/shop and 178 sq. ft. of covered porch. Per approved plans, engineering and requirement list. CUP99-00022 per David Abo with Planning and Zoning. PC#559 (SAM) MASTER FILE #01-07-003
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled2/28/20032/28/20032/28/2003APASS
DetailsJim Storey
Finaled by inspector at 2/28/2003 9:31:30 AM
BLD-Final2/26/20032/27/20032/27/2003APASS
DetailsJim Storey
###-#### - Dave - garage door will be open
BLD-Final2/14/20032/14/20032/14/2003PFAIL
DetailsJim Storey
###-#### call first to meet there called no responce left message. 2/14/2003 3:44:54 PM
PostCard Mailed  7/13/2002 SENT
PostCard has been mailed requesting inspection.
Code Occupancy Approval  7/12/2002 PASS
BLD-Wall cover12/7/200112/7/200112/7/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/07/2001 at 09:40:16. Contact: .
BLD-Wall cover12/3/200112/3/200112/3/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/03/2001 at 01:22:46. Contact: . interior sheer ok 12/3/2001 9:43:32 AM
BLD-Energy code compliance12/3/200112/3/200112/3/2001ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/03/2001 at 01:23:29. Contact: . framing ok pending mech. sign off. 12/3/2001 9:44:13 AM
BLD-Framing/Rough-in10/31/200110/31/200110/31/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/31/2001 at 00:37:19. Contact: . shear nailing ok to cover ext 10/31/2001 9:05:29 AM
BLD-Framing/Rough-in10/29/200110/29/200110/29/2001PFAIL
DetailsRuss Owen
###-#### DAVID SHEER WALL . c/n staraps at 2nd floor and shear see plans. 10/29/2001 2:36:50 PM
BLD-Framing/Rough-in10/26/200110/26/200110/26/2001PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/26/2001 at 08:58:05. Contact: ###-####. shear nailing not per plans 10/26/2001 1:19:11 PM
BLD-Framing/Rough-in10/25/200110/25/200110/25/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/25/2001 at 10:00:34. Contact: ###-####.
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PASS
DetailsJim Storey
wip 10/22/2001 9:22:02 AM
BLD-Foundation8/17/20018/20/20018/20/2001APASS
DetailsJim Storey
david ###-####
BLD-Footing8/8/20018/8/20018/8/2001PPART
DetailsDave Hannah
###-#### tod work in progress 8/8/2001 3:03:56 PM
Plan assigned to (SAM)8/6/2001 8/7/2001 PASS
DetailsSteve Munroe
8/7/2001 07:47:56 SAM - activity updated through activity BLDA022 from case BLD01-02099.
Print Pending Permit.LaserJet4  8/7/2001  
Plan Review Report  8/7/2001  
PLANS/APPL TAKEN TO FRONT DESK  8/7/2001 DONE
Inspection Record Card- Bld  8/7/2001 DONE
Telephone call  8/7/2001 DONE
permit ready
Issue PAID IN FULL permit  8/7/2001 DONE
Plan Reviewer's activity  8/6/2001 PEND
8/6/01 I called and let the builder know I need a new site plan. Site plan submitted does not match master file. He said he would have the designer fax over a new site plan.
Routing - PLANNING8/1/20018/1/20018/2/2001 PASS
Approved as per CUP99-00022.
Application received  8/1/2001  
Routing - PLAN CHECK8/6/20018/6/2001  PEND
Routing - PUBLIC WORKS8/1/20018/1/2001  PEND