Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD01-02133
StatusFinaled
Name ST ALPHONSUS REG MED CEN INC
Site Address 1055 N CURTIS RD
Project NameST ALS-4TH FLR
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS-4TH FLOOR-NORTH TOWER)(ENDOVASCULAR O.R. REMODEL) Renovation of an existing operating room. To remove interior sheetrock covering and the wall between the rear storage / sanitized hall area. To construct a new wall between the O.R. and a new Control Room. To relocate the storage room walls and separate with 1-hour occupancy separation requirements; install new O.R. interior finsih; new electrical & mechanical to install lead lining around the perimeter of the room; equipment in equipment room; structural modifications to support new O.R. diangnostic / treatment equipment; repair fire resistive construction damamged or altered by remodel; install suspended ceiling grid system; and modify alaram and sprinkler system coverage to maintain code complaince. Note: This building is fully sprinklered. A "Letter of Completion / Compliance is required for this project. PC#01-647/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/3/20018/3/20012/7/2002 DONE
called Kreizenbeck for final certs. they are working on them
DOC - L/C Approved  1/4/2002 DONE
LC #22100 issued to Dave Maloney ###-####
BLD-Final12/21/200112/24/200112/24/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/21/2001 at 13:35:49. Contact: ###-####. ok for perm occ 12/24/2001 9:55:01 AM
FIRE-Final Inspection12/21/200112/21/200112/21/2001PPASS
DetailsRick Jackson
###-####
BLD-Conference12/7/200112/10/200112/10/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/07/2001 at 11:59:59. Contact: ###-####.. misc.firestops at flutes & penetrations will be open for inspat final. 12/10/2001 12:20:41 PM
BLD-Other12/6/200112/7/200112/7/2001ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/06/2001 at 15:31:48. Contact: ###-####. no one at site no c/notice on site 12/7/2001 9:51:58 AM
BLD-Framing/Rough-in12/3/200112/3/200112/3/2001PFAIL
DetailsRuss Owen
mark ###-####. firewall needs to be complete at top of flutes. 12/3/2001 5:03:08 PM
BLD-Conference10/16/200110/16/200110/16/2001PPASS
DetailsTom Arcoraci
4TH FLOOR NORTH TOWER ###-#### MARK wip ok to cover check fire stopping and dampers at grid inspection 10/16/2001 4:00:11 PM
Inspection Record Card- Bld  9/10/2001 DONE
Print Occupancy Form  9/10/2001 DONE
Issue PAID IN FULL permit  9/10/2001 DONE
Plan resubmittals received  9/7/2001 DONE
Received two copies of revised sheets A0.2, A2.1, A3.1, A4.1, A9.1, S1.0, M2.2, E2P. Routed to Dan S. KMM
PLANS/APPL TAKEN TO FRONT DESK  9/7/2001 PASS
To permit desk to process for issue.
Routing - PLAN CHECK9/7/2001 9/7/2001 PASS
Inserted corrected copies and red-lined items still in question. Approved per notes on plans and attached plan review conditions of fire & plan check divisions.
Plan assigned to (DRS)8/10/2001 9/7/2001 PASS
DetailsDan Stuart
9/7/2001 18:47:12 DRS - activity updated through activity BLDA022 from case BLD01-02133.
Routing - PLAN CHECK8/30/2001 9/6/2001 FAIL
Suibmittals not complete. Called Vince Johnson to submit complete stamped & signed re-subittals.
Plan resubmittals received  9/6/2001 DONE
Received two copies of revised sheets A0.2, A2.1, A3.1, A4.1, A9.1 UNSIGNED, and two copies of stamped and signed revised sheets S1.0, M2.2, E2P. One copy of cover letter to plan review response and one hardware schedual. Routed to Dan S. KMM
Plan resubmittals received  8/31/2001  
Received new electrical sheet - E2P, two copies directly from office of DC Engineering to go with Vince Johnson's plans due on the 4th of September.
Telephone call  8/30/2001 DONE
Call to Vince Johnson to let him know the plans were back from fire today and approved. Need resubmittals to my review and if complete, the plans will be ready to issue. Vince thought the plan resubmittals were be here tomorrow as they are wrapping them up now.
Telephone call  8/30/2001 DONE
Call to Dennis Adams, SARMC in house architect to let him know the plans were back from fire and approved. Waiting for response to my review from NJRA. I talked with Vince and plans should be here tommorrow. If complete, will prepare plans for processing for permit ASAP.
Plan Review Completed(1st rev)  8/30/2001 DONE
Routing - FIRE8/25/2001 8/30/2001 PASS
DetailsBill Alexander
Routing - PLAN CHECK8/15/20018/24/20018/25/2001 FAIL
Resubmittals required. Have been request of architect by fax & hard copy. Routing to fire code analsyst for review.
Plan resubmittals requested  8/25/2001 FAIL
copy of conditions needing response faxed and mailed to architect
Routing - PLUMBING8/10/2001 8/15/2001 PASS
pern plans and 97 upc
Routing - PUBLIC WORKS8/10/2001 8/10/2001 PASS
Plans ACCEPTED BY PLAN TECH  8/3/2001 DONE
Application received  8/3/2001  
Recd Pcfee & Taken To Pln CK  8/3/2001 DONE