Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02134
StatusFinaled
Name MCDONALDS
Site Address 350 N MILWAUKEE ST Unit: 2012
Project NameBTS - #2012
Customer Number 
ePlanReviewNo
Description
(MCDONALDS)(BOISE TOWNE SQUARE-SPACE 2012) To remodel an existing 594 sq ft tenant space within the food court per approved plans and engineering on file. Work to include, demolition of existing interior finishes, construction of new noncombustible partitions and construction of new front service counter, installation of three new type one hood systems, Ducts to be wraped with an approved duct wrap system per ER#5549, installation of new suspended ceiling system, installation of new kitchen equipment, new Interior HVAC System, two new roof top condensing units. Installation of new walk in cooler in an existing remote storage area located in the service passageway. This building is fully fire sprinklered and contains a smoke evacuation system, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall remain operational as installed under the 1985 UBC. (pc#0648-01)RmH A Certificate of Occupancy is required after all work has been inspected and approved, and prior to tenant occpying this space.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/3/20018/3/20012/7/2002 DONE
Permanent occupancy UNPAID FEE  11/15/2001 DONE
Perm. Occ. Cert. #8901 issued 11-15-01 to McDonald's on upper level of Boise Towne Square.
Permanent Occupancy 11/14/200111/14/2001 DONE
Details
FIRE-Final Inspection11/13/200111/14/200111/14/2001APASS
DetailsTroy Cobbley
OK for perm occ 11/14/2001 3:34:18 PM
BLD-Final11/14/200111/14/200111/14/2001PPASS
DetailsTom Arcoraci
Carl ###-#### ok for perm 11/14/2001 3:50:05 PM
FIRE-Final Inspection11/9/200111/13/200111/13/2001PCANC
DetailsAlan Hauser
talked to contractor about this 11/13/2001 12:03:43 PM
BLD-Framing/Rough-in11/13/200111/13/200111/13/2001PPASS
DetailsJim Sly
grid inspection ###-#### Grid OK. 11/13/2001 5:13:03 PM
BLD-Framing/Rough-in10/30/200110/30/200110/30/2001PPART
DetailsRuss Owen
###-####
BLD-Framing/Rough-in10/26/200110/26/200110/26/2001PPART
DetailsRuss Owen
###-#### CARL. Ok to sheetrock repairs made. 10/26/2001 2:54:57 PM
FIRE-Sprinkler Rough-in10/25/200110/25/200110/25/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 10/25/2001 2:28:55 PM Sprinkler rough-in OK
BLD-Framing/Rough-in10/24/200110/24/200110/24/2001PFAIL
DetailsRuss Owen
###-#### carl. Framing not per plan. c/n. 10/24/2001 4:47:35 PM
Issue PAID IN FULL permit  10/11/2001 DONE
Routing - PLAN CHECK10/4/2001 10/10/2001 PASS
Case Summary (BLD)  10/10/2001 DONE
Plan Review Report  10/10/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/10/2001 PASS
DetailsRon Hill
Inspection Record Card- Bld  10/10/2001 DONE
Print Occupancy Form  10/10/2001 DONE
Telephone call  10/10/2001 DONE
talked to dave bliss to verify plans are ready
Plan assigned to (R_H)8/10/2001 10/10/2001 PASS
Details
10/10/2001 13:46:04 RMH - activity updated through activity BLDA022 from case BLD01-02134.
Plan resubmittals received  10/9/2001 DONE
Received three copies of revised structural calculations. Routed to Ron Hill. KMM
Plan resubmittals received  10/5/2001  
Received three copies of revised sheetsM1.0, three copies of nelson flameshiel blanket, one copy of condensing unit specifications and one copy of cover letter. Routed to Ron Hill. kmm
Plan resubmittals received  10/4/2001 DONE
Received one additional set of revision drawings sheets Cover sheet, A2.1, A3.0, A8.1, K1, M0.0, M0.1, M1.0, P0.0, P0.1, P0.2, P1.0, E1.0 and one copy of cover letter. Routed to Ron Hill kmm
Routing - FIRE10/3/2001 10/4/2001 PASS
Resubmittals approved with additional conditions
Plan Review Report (Fail)  10/3/2001 DONE
Plan Review Report (Fail)  10/3/2001 DONE
Plan Review Report (Fail)  10/3/2001 DONE
Routing - PLAN CHECK9/5/2001 10/3/2001 FAIL
DetailsRon Hill
Second plan review failed, Faxed requirements to the architect on 10-03-01
Plan Review Report  10/1/2001 DONE
Plan resubmittals received  9/28/2001 DONE
received 2 copies of structural calculations and routed to Ron Hill
Plan resubmittals received  9/26/2001 DONE
Received 2 revised copies of A2.1, A3.0, A8.1, M0.0, M0.1, M1.0, P0.0, P0.1, P0.2, P1.0, E1.0, & K1. AND ROUTED TO RON HILL
Plan Review Completed(1st rev)  9/5/2001 FAIL
Routing - FIRE8/30/2001 9/5/2001 PASS
Plan Reviewer's activity  8/30/2001 FAIL
DetailsRon Hill
Faxed requirements to architects, routed to fire department.
Routing - PLAN CHECK8/14/2001 8/29/2001 FAIL
DetailsRon Hill
Routed plans to fire department for review.
Routing - PLUMBING8/13/2001 8/14/2001 PASS
Routing - PUBLIC WORKS8/10/2001 8/13/2001 PASS
Application received  8/3/2001  
Recd Pcfee & Taken To Pln CK  8/3/2001 DONE