BLD-Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Jim Storey
|
|
|
###-####- fred fn
|
DOC - Permit Finaled | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 1/31/2002 1:56:28 PM
|
BLD-Energy code compliance | 12/20/2001 | 12/21/2001 | 12/21/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/17/2001 | 12/18/2001 | 12/18/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Conference | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/18/2001 3:19:45 PM w/ bldr, remove or protect openings for exh. fans at garage lids...recall for frame insp
|
BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Russ Owen
|
|
|
SHEER NAIL AND HOLD DOWN FRED ###-####. ok 2nd side of osb can be placed hold downs ok. 12/14/2001 3:20:37 PM
|
BLD-Foundation | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Jim Storey
|
|
|
###-#### pwoi set backs ok hold downs located per plan. 9/17/2001 5:09:24 PM
|
BLD-Footing | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 12:15:13. Contact: .
|
Issue PAID IN FULL permit | | | 9/6/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/31/2001 | | DONE |
|
|
|
TALKED TO FRED TO VERIFY PLANS ARE READY
|
Plan assigned to (SAM) | 8/17/2001 | | 8/30/2001 | | PASS |
Steve Munroe
|
|
|
8/30/2001 13:02:50 SAM - activity updated through activity BLDA022 from case BLD01-02153.
|
Print Pending Permit.LaserJet4 | | | 8/30/2001 | | |
|
|
|
|
Plan Review Report | | | 8/30/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/23/2001 | | PEND |
|
|
|
10:30 I called and left a message on Fred Houtman phone. I let him know he needs to come pick-up the plans because of the problems with them. IE: footing sizes, everything drawn to scale, all dimensions, foundation strap sizes, window operation, joist calculations, header sizes, square footages, stair section and to provide clearer notes.
|
Pending Assignment by DJO | 8/7/2001 | | 8/17/2001 | | DONE |
Dan Overy
|
|
|
8/17/2001 10:02:08 DJO - activity updated through activity BLDA183 from case BLD01-02153.
|
Routing - PLANNING | 8/7/2001 | 8/7/2001 | 8/7/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/7/2001 | 8/7/2001 | 8/7/2001 | | DONE |
|
|
|
|
Application received | | | 8/7/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 8/7/2001 | 8/7/2001 | | | PEND |
|
|
|
|