Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-02154
StatusFinaled
Name CARRIAGE CROSSING (BLDG #1)
Site Address 2447 S APPLE ST
Project NameCARRIAGE CROSSING-BLDG #1
Customer Number 
ePlanReviewNo
Description
CARRIAGE CROSSING SHOPPING CENTER BUILDING #1 (SHELL) - TO CONSTRUCT A NEW 2200 SQ. FT., ONE STORY WOOD FRAMED OFFICE AND RETAIL SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS IS A SHELL PERMIT ONLY AND NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH01-00057/CUP01-00019/PC#809-01/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - L/C Approved  9/9/2002 DONE
LC approved for Carriage Crossing Shopping Center building #1 #22576
BLD-Final9/4/20029/5/20029/5/2002APASS
DetailsJim Storey
8:30; Phone #: ###-#### Internet Inspection Request from: Amy Lawson
Code Occupancy Approval7/1/20027/1/20027/1/2002PPASS
DetailsWm. Michael Meloy
Passing as a shell construction with associated landscaping 7/1/2002 3:48:15 PM
FIRE-Final Inspection6/27/20026/28/20026/28/2002PPASS
DetailsRick Jackson
fn fire- terry- ###-#### building 1 is okay; GC wanted building two but paved access won't be in until late July - won't approve until paved access is complete 6/28/2002 2:19:29 PM
BLD-Final6/11/20026/11/20026/11/2002PNR
DetailsJim Storey
TERRY ###-####
BLD-Framing/Rough-in4/29/20024/30/20024/30/2002APASS
DetailsJim Storey
terry- ###-#### re-insp fr
BLD-Framing/Rough-in4/26/20024/29/20024/29/2002AFAIL
DetailsJim Storey
###-#### MIKE truss engineering not complet for bracing/hanger nailling / top chord bracing/scabs at dtag truss with naill patren. 4/29/2002 10:33:19 AM
BLD-Framing/Rough-in4/16/20024/17/20024/17/2002PPASS
DetailsJim Storey
shear wall--mike ###-#### exterior wall nailling ok for cover. 4/17/2002 3:03:14 PM
BLD-Framing/Rough-in4/11/20024/12/20024/12/2002PPASS
DetailsDave Hannah
roof nailing\\###-####
BLD-Footing2/27/20022/28/20022/28/2002APASS
DetailsTom Arcoraci
MIKE ###-####
BLD-Footing2/26/20022/27/20022/27/2002ANR
DetailsTom Arcoraci
MIKE ###-####
BLD-Footing2/27/20022/27/20022/27/2002PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 2/27/2002 10:37:32 AM mike ###-####
BLD-Footing2/25/20022/26/20022/26/2002PPASS
DetailsJim Storey
MIKE ###-#### wall rebar ok 2/26/2002 2:28:26 PM
Plan resubmittals received  12/27/2001 DONE
Received five copies of revised sheets A2.0 A2.3, A2.4, and three copies of revised calcs. and one copy of response letter. Routed to John M. kmm
(F) Reprint permit  12/26/2001  
Issue & PRINT permit  12/24/2001 DONE
Print Occupancy Form  12/21/2001 DONE
Override - Parcel Holds  12/21/2001  
Inspection Record Card- Bld  12/21/2001 DONE
Telephone call  12/21/2001 DONE
permit ready and need ACHD
PLANS/APPL TAKEN TO FRONT DESK  12/20/2001 PASS
Routing - PLAN CHECK12/17/2001 12/20/2001 PASS
Plan assigned to (JCM)10/17/2001 12/20/2001 PASS
DetailsJohn Menard
12/20/2001 15:22:02 JCM - activity updated through activity BLDA022 from case BLD01-02154.
Override - Parcel Holds  12/18/2001  
Routing - PLANNING Land Div12/17/2001 12/18/2001 PASS
Land division ok. Routed back to Plan Review. (blc)
Routing - PUBLIC WORKS12/14/2001 12/17/2001 PASS
Override - Parcel Holds  12/17/2001  
Routing - PLANNING Land Div12/12/2001 12/14/2001 FAIL
(Waiting for new parcel #s from Assessor's office.) Routed to Public Works. (blc)
Override - Parcel Holds  12/12/2001  
Routing - PLAN CHECK11/23/2001 12/12/2001  
Plan resubmittals received  12/11/2001 DONE
Received two sets of resubmittal sheets A4.0, A4.1, A4.5, A10.0, WITH TRANSMITTAL LETTER. Routed to John Menard.
Plan resubmittals received  12/11/2001 DONE
Received five sets of resubmittal sheets A2.3, A2.4, A2.7, A2.8, A4.4, A4.5, A8.0, A9.1, A10.0, THREE COPIES OF CALCULATIONS, and cover letter. Routed to John Menard.
Plan resubmittals received  12/10/2001 DONE
Received one set of resubmittal sheets A2.0, A2.1, A4.2, A4.4, A8.0 WITH revision dated 11/26/01. Received four sets of plan resubmittal sheet A8.0 with cover letter. Routed to John Menard.
Plan resubmittals requested  12/4/2001  
Faxed a copy of the structural review comment list to John Price requesting additional structural revisions. JCM
Routing Off Site - STRUCTURAL11/13/2001 12/4/2001 FAIL
Contacted PDQ to take plans to outside eng. Received a comment list from the consulting structural engineer requesting revisions. JCM
Plan Reviewer's activity  12/3/2001 PASS
Plan resubmittals reviewed and approved as submitted with attached comment list. JCM
Plan resubmittals received  11/28/2001 DONE
Received three sets of resubmittal sheets A2.0, A2.1, A4.2, A4.4, A8.0, and response letter. Routed to John Menard.
Routing - FIRE11/20/2001 11/21/2001 PASS
approved without written comment
Routing - PLAN CHECK11/15/2001 11/20/2001 FAIL
Plan resubmittals requested  11/19/2001  
Sent the architect of record a copy of the comment list requesting revisions. JCM
Routing - PLUMBING11/9/2001 11/15/2001 PASS
Plan resubmittals received  11/13/2001 DONE
Received three sets of resubmittal sheets A4.0, A4.1, A4.5, A10.0, three sets of supplemental calculations, and response letter. Routed to John Menard.
Routing - PLANNING11/5/2001 11/9/2001 PASS
Approved as per CUP01-00019 and per DRH01-57.
Routing - PUBLIC WORKS10/18/2001 11/5/2001 FAIL
Subdivision not recorded but expects subdivision should be recorded in the next week or so per John Price.
Override - Parcel Holds  10/18/2001  
Routing - PLANNING Land Div10/17/2001 10/18/2001 FAIL
Surrey Crossing Subdivision not yet recorded. 10/18/01
Plan routing begun/NEW & ADDTN  10/17/2001 DONE
CHANGE STATUS TO (R)  10/17/2001 DONE
per Kathy M.
Plans ACCEPTED BY PLAN TECH  10/17/2001 DONE
Application received  10/12/2001  
Fee Review-notes8/7/20018/7/20019/26/2001 DONE
Plan resubmittals requested  8/27/2001  
Faxed a copy of the structural engineer's comment list the architect of record. JCM
Plan assigned to (JCM)8/7/2001 8/24/2001 VOID
DetailsJohn Menard
Permit application pulled because subdivision is not recorded. JCM
VOIDED CHANGE STATUS  8/24/2001 DONE
per Marlene void
Routing - PLANNING8/14/2001 8/15/2001 PEND
Approved as per CUP01-00019. Design Review approval required.
Routing - PUBLIC WORKS8/8/2001 8/9/2001 FAIL
Subdivision not recorded per April Miller. 8/9/01 DAR
Application received  8/7/2001  
Plans ACCEPTED BY PLAN TECH  8/7/2001 DONE
Override - Parcel Holds  8/7/2001  
Recd Pcfee & Taken To Pln CK  8/7/2001 DONE
Routing Off Site - STRUCTURAL10/17/2001    
Contacted PDQ to take plans to outside eng. KMM