(ALBERTONS EXPRESS #160) To construct a new single story, metal framed, convenience store with attached car wash. The convenience store is 2,000 sq.ft and the car wash is 1,164 sq.ft. All construction per the approved plans and attached comment list. DRH01-00095 PC#681-01 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/7/20018/7/200112/16/2002 DONE
additional value from sub information
BLD-Final3/26/20023/26/20023/26/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/26/2002 at 10:00:01. Contact: ###-####. ok perm oc. 3/26/2002 4:19:12 PM
Permanent Occupancy 3/26/20023/26/2002 DONE
Details
Permanent occupancy  3/26/2002 DONE
Perm. Occ. Cert. #9085 issued 3-26-02 to Albertson's Express #160.
FIRE-Final Inspection3/25/20023/25/20023/25/2002PPASS
DetailsTroy Cobbley
fire life safety finaled 3/25/2002 11:29:52 AM
FIRE-Final Inspection3/21/20023/22/20023/22/2002AFAIL
DetailsTroy Cobbley
provide inspection tag for fire extinguishers, repair emergency light in mech. room, remove lock or provide exit hardware for cooler door, provide address on street side of building, duct detector does not shut down hvac unit 3/22/2002 10:33:53 AM
BLD-Final3/21/20023/21/20023/21/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/21/2002 at 10:03:46. Contact: ###-####. Pre- inspection only . need plans and special inspection reports. no corrections noticed. 3/21/2002 4:24:22 PM ly. 3/21/2002 4:24:25 PM 3/21/2002 4:25:20 PM
BLD-Framing/Rough-in3/12/20023/12/20023/12/2002PPART
DetailsDave Hannah
larry ###-#### ceiling grid ok 3/12/2002 4:29:55 PM
Override - Parcel Holds  3/12/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: Do not issue Certificate of Occupancy for Albertson's Express until issue with adjoining parcel(s) from ROS# 5614 is resolved. We will allow issuance of BLD01-02165 and BLD01-02293 but adjacent owner needs to either re-do ROS or record deeds for their parcels. Contact Brandi (3751) or Karen (3910) for more info. Reason for OverRide: grid inspection
BLD-Framing/Rough-in2/13/20022/13/20022/13/2002PPART
DetailsRuss Owen
LARRY ###-####. Ok inside. 2/13/2002 6:31:44 PM
Override - Parcel Holds  2/13/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: Do not issue Certificate of Occupancy for Albertson's Express until issue with adjoining parcel(s) from ROS# 5614 is resolved. We will allow issuance of BLD01-02165 and BLD01-02293 but adjacent owner needs to either re-do ROS or record deeds for their parcels. Contact Brandi (3751) or Karen (3910) for more info. Reason for OverRide: just need an inspection
Case Summary (BLD)  2/11/2002  
BLD-Framing/Rough-in2/5/20022/6/20022/6/2002APART
DetailsRuss Owen
###-#### carwash soffit ok. 2/6/2002 12:06:15 PM
Override - Parcel Holds  2/5/2002  
BLD-Framing/Rough-in1/25/20021/25/20021/25/2002PPART
DetailsRuss Owen
fr larry- ###-#### . ext shear ok. 1/25/2002 4:38:01 PM
Override - Parcel Holds  1/25/2002  
BLD-Framing/Rough-in1/17/20021/18/20021/18/2002ANR
DetailsRuss Owen
###-####
Override - Parcel Holds  1/17/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Do not issue Certificate of Occupancy for Albertson's Express until issue with adjoining parcel(s) from ROS# 5614 is resolved. We will allow issuance of BLD01-02165 and BLD01-02293 but adjacent owner needs to either re-do ROS or record deeds for their parcels. Contact Brandi (3751) or Karen (3910) for more info. Reason for OverRide:
BLD-Foundation12/27/200112/28/200112/28/2001APART
DetailsDave Hannah
###-#### larry talked with larry he will move rebar to get clearances around block outs spec inspector to ok be for placement 12/28/2001 10:54:23 AM
Override - Parcel Holds  12/27/2001  
BLD-Footing12/19/200112/19/200112/19/2001PPART
DetailsRuss Owen
###-#### larry. ok pending s-i. 12/19/2001 4:29:10 PM
Override - Parcel Holds  12/19/2001 DONE
DetailsRita DeYoung
Parcel Tag Notes: Do not issue Certificate of Occupancy for Albertson's Express until issue with adjoining parcel(s) from ROS# 5614 is resolved. We will allow issuance of BLD01-02165 and BLD01-02293 but adjacent owner needs to either re-do ROS or record deeds for their parcels. Contact Brandi (3751) or Karen (3910) for more info. Reason for OverRide:
Override - Parcel Holds  12/19/2001  
(F) Reprint permit  12/14/2001  
Override - Parcel Holds  12/13/2001  
Issue PAID IN FULL permit  12/13/2001 DONE
(F) Reprint permit  12/13/2001 DONE
Override - Parcel Holds  12/7/2001  
Inspection Record Card- Bld  12/7/2001 DONE
Print Occupancy Form  12/7/2001 DONE
Telephone call  12/7/2001 DONE
left mess that permit is ready
Routing - PLANNING Land Div12/5/2001 12/6/2001 PASS
Routing - PUBLIC WORKS12/6/2001 12/6/2001 PASS
Routing - PLAN CHECK12/6/2001 12/6/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/6/2001 DONE
Override - Parcel Holds  12/6/2001  
Print Pending Permit.LaserJet4  12/6/2001 DONE
Case Summary (BLD)  12/6/2001 DONE
Plan assigned to (M_P)8/21/2001 12/6/2001 PASS
DetailsMike Phillips
12/6/2001 16:27:37 M_P - activity updated through activity BLDA022 from case BLD01-02165.
Routing - PLAN CHECK9/12/2001 12/5/2001  
Override - Parcel Holds  12/5/2001  
Routing - FIRE9/7/2001 9/12/2001 PASS
Plan Review Completed(1st rev)  9/12/2001 PASS
Routing - PUBLIC WORKS9/12/2001 9/12/2001 FAIL
Need to complete record of survey per April Miller
Routing - PLAN CHECK9/4/2001 9/7/2001 PEND
Routing to fire.
Plan Reviewer's activity  9/7/2001 PEND
Waiting for others to approve prior to issuing permit.
Override - Parcel Holds  9/7/2001  
Print Pending Permit.LaserJet4  9/7/2001  
Routing - PLUMBING8/29/2001 9/4/2001 PASS
floor sinks must be half exposed in yoe kick of cabinets, case drain at C20 page3.9a must be move to an accessable location, provide CDHD required hand sink at front counter, indirect waste to floor sink, pipe water heater T&P drain to mop sink, additional interceptor venting required.
Routing - PLANNING8/27/2001 8/29/2001 PASS
Approve per DRH01-95 and as noted on the plans.
Routing - PUBLIC WORKS8/21/2001 8/27/2001 FAIL
Requires completion of sub recording and drainage plan revisions per Brian M. and April Miller.
Plan routing begun/NEW & ADDTN  8/21/2001 DONE
Plans ACCEPTED BY PLAN TECH  8/21/2001 DONE
Received Certificate of Value  8/7/2001 DONE
Application received  8/7/2001  
Recd Pcfee & Taken To Pln CK  8/7/2001 DONE