BLD-Aging Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 | | PASS |
Jim Storey
|
|
|
316 12/9/2003 8:21:22 AM
|
DOC - Permit Finaled | 12/9/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/9/2003 8:21:24 AM
|
Permanent occupancy UNPAID FEE | | | 9/12/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9340 issued 9-12-02 to Washington Mutual Bank.
|
Permanent Occupancy | | 9/11/2002 | 9/11/2002 | | DONE |
|
|
|
|
BLD-Final | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | PASS |
Jim Sly
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Perm Occ. 9/11/2002 3:25:43 PM
|
FIRE-Final Inspection | 9/3/2002 | 9/4/2002 | 9/4/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 14:59:21. Contact: ###-####.
|
Code Occupancy Approval | | | 8/27/2002 | | PASS |
|
|
|
|
FIRE-Final Inspection | 8/22/2002 | 8/26/2002 | 8/26/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 16:36:19. Contact: ###-####. need detectors for AHU shutdown; keyed lock on security door; mags on front door - need to clarify operation or comply with plan review notes; fire lane markings; address 8/26/2002 12:48:53 PM
|
BLD-Other | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 07:54:15. Contact: ###-####.ceilling ok for cover. 7/31/2002 1:45:35 PM
|
BLD-Framing/Rough-in | 7/25/2002 | 7/26/2002 | 7/26/2002 | P | PART |
Jim Storey
|
|
|
###-#### ###-####need suport of soffit and ele . 7/26/2002 3:47:11 PM
|
Reopen Permit (ISS) | | | 7/25/2002 | | DONE |
|
|
|
IVR was saying this permit was finaled, I am trying to fix it
|
BLD-Framing/Rough-in | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Conference | 6/25/2002 | 6/25/2002 | 6/25/2002 | A | CANC |
Russ Owen
|
|
|
2
|
BLD-Framing/Rough-in | 5/21/2002 | 5/22/2002 | 5/22/2002 | P | PART |
Jim Sly
|
|
|
for a rebar -terry- ###-#### Rebar/slab Pending MTI reports and approval. 5/22/2002 2:51:44 PM
|
Override - Parcel Holds | | | 5/21/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 5/15/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/15/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/15/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/15/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2002 | | PASS |
|
|
|
Plan modification approved for Tenant Improvement.
|
Plan assigned to (CJW) | 4/26/2002 | | 5/14/2002 | | PASS |
Carl Westfall
|
|
|
5/14/2002 09:42:54 CJW - activity updated through activity BLDA022 from case BLD01-02182.
|
First Notice | 5/13/2002 | 5/13/2002 | 5/13/2002 | | DONE |
|
|
|
|
Routing - FIRE | 5/3/2002 | | 5/9/2002 | | PASS |
|
|
|
Plan modification
|
Routing - PLAN CHECK | 4/30/2002 | | 5/3/2002 | | PASS |
|
|
|
Plan modification approved.
|
Routing - PLUMBING | 4/29/2002 | | 4/30/2002 | | PASS |
|
|
|
Plan Modification increase vent sizing to 3" from vtr to a 3"x2"x2" above last toilet.
|
Routing - PUBLIC WORKS | 4/26/2002 | | 4/29/2002 | | PASS |
|
|
|
Plan modification
|
Plan routing begun/TENANTS | | | 4/26/2002 | | DONE |
|
|
|
Plan Modification
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2002 | | PASS |
|
|
|
Plan modification.
|
Telephone call | | | 3/18/2002 | | DONE |
|
|
|
permit ready
|
Plan assigned to (CJW) | 12/26/2001 | | 2/26/2002 | | PASS |
Carl Westfall
|
|
|
2/26/2002 09:48:49 CJW - activity updated through activity BLDA022 from case BLD01-02182.
|
Routing - PLAN CHECK | 1/14/2002 | | 2/26/2002 | | PASS |
|
|
|
The Plan Review Report was sent to architect on January 29, 2002. A response was required. (2-26-02) THE DRAWINGS WERE APPROVED, WITH CONDITIONS, AFTER RESUBMITTAL REVIEW.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/26/2002 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/22/2002 | | DONE |
|
|
|
Received two copies of reviseds sheets A-1, A-2, A-3, M-1, one copy of plan review comments and two copies of comments and revisions. Routed to Carl W. kmm
|
Routing - FIRE | 1/11/2002 | | 1/14/2002 | | PASS |
|
|
|
approved as drawn
|
Plan Review Completed(1st rev) | | | 1/14/2002 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLUMBING | 1/10/2002 | | 1/11/2002 | | PASS |
|
|
|
provide a pan and drain to janitor sink under water heater, per plans and 2000 upc
|
Routing - PLAN CHECK | 12/27/2001 | | 1/10/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started January 8, 2002 and finished January 10, 2002. Resubmitted drawings from the architect are required. See the conditions list. A report was not sent to the architect until after the building shell review.
|
Routing - PUBLIC WORKS | 12/26/2001 | | 12/27/2001 | | PASS |
|
|
|
|
CHANGE STATUS TO (PND) | | | 12/21/2001 | | DONE |
|
|
|
This project was originally submitted on August 7, 2002 and voided because the replatting of the property was not complete. That replat is now complete. We are re-enstating this permit. kmm
|
Application received | | | 12/21/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/27/2001 | | DONE |
|
|
|
VOIDED. LAND UNDERGOING SUBDIVISION. SEE MEMO ON FILE.
|
VOIDED CHANGE STATUS | | | 8/24/2001 | | DONE |
|
|
|
per marlene
|
Plans ACCEPTED BY PLAN TECH | | | 8/15/2001 | | DONE |
|
|
|
Received plan resubmittals from Design Forum Architects, two sets , forwarded same to be attached to the original plans. 8/15/01 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2001 | | DONE |
|
|
|
|
Application received | | | 8/9/2001 | | |
|
|
|
|
CHANGE ISSUED DATE | | | 4/23/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/9/2002 | | | | |
|
|
|
Plan Modification
|