BLD-Aging Inspection | 3/10/2003 | 3/10/2003 | 3/10/2003 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/10/2003 | 3/10/2003 | 3/10/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 3/10/2003 8:15:53 AM
|
FIRE-Final Inspection | 9/4/2002 | 9/4/2002 | 9/4/2002 | P | PASS |
Rick Jackson
|
|
|
|
Code Occupancy Approval | | | 8/27/2002 | | PASS |
|
|
|
|
BLD-Framing/Rough-in | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PART |
Jim Storey
|
|
|
roof drive thru wip conections ok at rafter and collor ties. 6/27/2002 10:29:38 AM
|
BLD-Framing/Rough-in | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PART |
Jim Storey
|
|
|
roof drive thru wip conections ok at rafter and collor ties. 6/27/2002 10:29:38 AM
|
BLD-Framing/Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | NH |
Jim Storey
|
|
|
wayne- ###-#### fr not on site plans unaccessable. 6/26/2002 4:53:03 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/20/2002 | 6/20/2002 | A | PART |
Tom Arcoraci
|
|
|
wip front entry steel studs not all welded yet 6/20/2002 10:09:21 AM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | CANC |
Jim Storey
|
|
|
###-#### wayne out of time. 6/19/2002 6:03:25 PM
|
BLD-Framing/Rough-in | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PART |
Jim Storey
|
|
|
###-#### wayne call 1st need dennis to supply joist manufacture bolt or not at col. to girder. 6/11/2002 5:05:42 PM
|
| | | 6/11/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: Plan Modification for Washington Mutual Bank (Shell) on BLD#01-02185, and TI BLD01-02182. BLD0102185 modification scope of work. No inspections for the relocation of the Drive-Thru, relocation of the 2nd Exit, revise Curb & Landscape, revise Signage per City approved layout, and adjustment of Structural Grid Numbering. Call John Menard.
BLD01-02182 TI Modification: No inspections for 1. Back of house area redesigned
2. Location of emergency exit adjusted
3. Design layout at conciergie revised
4. Shifted location of teller ring
5. Plumbing, mech. and elect. updates per plan change
6. Location of drive-thru canopy adjusted. If any questions or concerns contact Carl Westfall or Jim Storey.
(5-14-02) Plan modification approved for tenant improvement. Reason for OverRide:
|
Override - Parcel Holds | | | 5/23/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/23/2002 | | DONE |
|
|
|
called left v- message for tom ...5-23-02///dld
|
Override - Parcel Holds | | | 5/23/2002 | | |
|
|
|
|
Routing - PLANNING | 5/20/2002 | | 5/22/2002 | | PASS |
|
|
|
Plan Modification As per CUP01-00019 and CVA01-00003, and DRH01-55.
|
Routing - PLAN CHECK | 5/22/2002 | | 5/22/2002 | | PASS |
|
|
|
Plan Modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2002 | | PASS |
|
|
|
Plan Modification
|
Plan assigned to (JCM) | 4/26/2002 | | 5/22/2002 | | PASS |
John Menard
|
|
|
5/22/2002 13:30:47 JCM - activity updated through activity BLDA022 from case BLD01-02185.
|
Routing - PLAN CHECK | 5/13/2002 | | 5/20/2002 | | |
|
|
|
Plan Modification
|
Plan resubmittals received | | | 5/20/2002 | | DONE |
|
|
|
Received three copies of revised sheets A1.01, L-1, L-2. Routed to John M. kmm
|
Routing - FIRE | 5/10/2002 | | 5/13/2002 | | PASS |
|
|
|
Plan Modificationapproved as drawn
|
Plan Reviewer's activity | | | 5/10/2002 | | PASS |
|
|
|
Plan modification reviewed and approved, as submitted, with attached plan review comment list. JCM
|
Routing - PLAN CHECK | 5/9/2002 | | 5/10/2002 | | PASS |
|
|
|
Plan Modification
|
Routing - PLANNING | 5/2/2002 | | 5/8/2002 | | FAIL |
|
|
|
No escape lane for waiting line for drive-up window. Need conditional use modification.
|
Routing - PUBLIC WORKS | 4/29/2002 | | 5/2/2002 | | PASS |
|
|
|
Plan Modification
|
BLD-Foundation | 4/29/2002 | 4/30/2002 | 4/30/2002 | P | CANC |
Jim Storey
|
|
|
TERRY ###-#### TERRY ###-#### permit in for plan modifacation ft placed with special insp. MTI pending report. 4/30/2002 4:32:11 PM
|
Override - Parcel Holds | | | 4/29/2002 | | |
|
|
|
|
(F) Reprint permit | | | 4/24/2002 | | |
|
|
|
|
CHANGE ISSUED DATE | | | 4/23/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/23/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/25/2002 | | 2/26/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2002 | | DONE |
|
|
|
LEFT MESSAGE FOR MARK HOWER ON VOICE MAIL THAT PLANS READY AND WE NEED A RECEIPT FROM ACHD
|
Plan assigned to (JCM) | 12/21/2001 | | 2/26/2002 | | PASS |
John Menard
|
|
|
2/26/2002 08:34:24 JCM - activity updated through activity BLDA022 from case BLD01-02185.
|
Routing - PLUMBING | 2/22/2002 | | 2/25/2002 | | PASS |
|
|
|
detail 02 page SE-2 is incorrect, do not tie overflow drain system to the rain drain system. UPC1101.11.2.1.
|
Routing - PLAN CHECK | 1/22/2002 | | 2/22/2002 | | |
|
|
|
|
Plan resubmittals received | | | 2/22/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets SE-2 with cover letter. Routed to John Menard.
|
Routing - FIRE | 1/17/2002 | 1/22/2002 | 1/22/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 1/22/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/17/2002 | | PASS |
|
|
|
Plans reviewed and approved with attached comment list and redlined notes. JCM
|
Routing - PLAN CHECK | 1/16/2002 | | 1/17/2002 | | PASS |
|
|
|
|
Routing - PLUMBING | 1/14/2002 | | 1/16/2002 | | FAIL |
|
|
|
please provide a plan showing roof drainage piping, size and location.
|
Routing Off Site - STRUCTURAL | 12/21/2001 | | 1/14/2002 | | PASS |
|
|
|
Received letter from consulting structural engineer approving the structural plans and calculations and required no further response. JCM
|
Routing - PUBLIC WORKS | 12/26/2001 | | 12/27/2001 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/21/2001 | | 12/26/2001 | | PASS |
|
|
|
Land division ok. Routed to Public Works. (blc)
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2001 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/21/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/21/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 12/21/2001 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 12/21/2001 | | DONE |
|
|
|
This project was originally submitted on 8/7/01 and voided because the replatting of the property was not complete. That replat is now complete. We are re-enstating permit to pending at this time. kmm
|
Application received | | | 12/21/2001 | | DONE |
|
|
|
|
Fee Review-notes | 8/9/2001 | 8/9/2001 | 9/21/2001 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/13/2001 | | 8/24/2001 | | VOID |
John Menard
|
|
|
VOIDED. LAND UNDERGOING SUBDIVISION. SEE MEMO IN FILE.
|
VOIDED CHANGE STATUS | | | 8/24/2001 | | DONE |
|
|
|
per Marlene
|
Plans ACCEPTED BY PLAN TECH | | | 8/13/2001 | | DONE |
|
|
|
Requested Project Manual from Callison Architecture, Katrina Cooper. 8/13/01
|
Application received | | | 8/9/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 8/9/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2001 | | |
|
|
|
|
Routing - PLANNING | 12/27/2001 | | 1/14/2001 | | PASS |
|
|
|
Approved as per CUP01-00019, CVA01-00003 and DRH01-55.
|
Plan Modification Accepted | | | | | DONE |
|
|
|
Plan modification excepted for Washington Mutual Bank (Shell) for the relocation of the Drive-Thru, relocation of the 2nd Exit, Revisement of the curb and landscape, revisement of the signage per city approved layout, and adjustment of the structural grid numbering. Routed to John Menard.
|