DOC - Permit Finaled | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 12/30/2002 2:01:53 PM
|
BLD-Aging Inspection | 12/25/2002 | 12/25/2002 | 12/25/2002 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 10:11:50. Contact: ###-####. Cancelled by contractor -re-schedule to pm. 5/23/2002 10:57:53 AM
|
BLD-Final | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 5/23/2002 10:57:19 AM Contractor needs all signatures on occupancy card. 5/23/2002 1:31:35 PM
|
Code Occupancy Approval | | | 5/22/2002 | | PASS |
|
|
|
|
Fee Review-notes | 8/9/2001 | 8/9/2001 | 5/21/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 4/11/2002 | | FAIL |
|
|
|
LANDSCAPE AND FENCE NOT IN AS REQUIRED, I TOLD CONTRACTOR I COULD SIGN TEMP BUT FINAL COULD NOT BE GIVEN TILL OLD TANK IS REMOVED AS REQUIRED UNDER THE CONDITIONAL USE PERMIT.
|
FIRE-Final Inspection | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | PASS |
Rick Jackson
|
|
|
fire fn rob- ###-####
|
BLD-Concrete | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:04:29. Contact: . top of tank 12/20/2001 3:58:52 PM
|
BLD-Other | 11/19/2001 | 11/21/2001 | 11/21/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 13:03:58. Contact: ###-####. no access--road mud--private engineer inspection--talked to contractor --ok to pour. 11/21/2001 2:06:35 PM
|
BLD-Other | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 14:56:16. Contact: ###-####. Concrete stemwall on section #2 for water tank. 11/16/2001 11:47:06 AM
|
BLD-Foundation | 11/2/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Steven Webb
|
|
|
###-#### Tank floor not foundation wall 11/5/2001 2:56:03 PM
|
BLD-Other | 10/30/2001 | 10/30/2001 | 10/30/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 08:32:47. Contact: ###-####. Concrete footing 10/30/2001 2:55:44 PM
|
Issue PAID IN FULL permit | | | 10/10/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/4/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/4/2001 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/14/2001 | | 10/4/2001 | | PASS |
John Menard
|
|
|
10/4/01 08:36:42 JCM - activity updated through activity BLDA022 from case BLD01-02190.
|
Routing - PLAN CHECK | 8/29/2001 | | 10/4/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/4/2001 | | |
|
|
|
Received faxed copy of requested structural calculations from the engineer of record. JCM
|
Routing Off Site - STRUCTURAL | 10/1/2001 | | 10/3/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 9/28/2001 | | |
|
|
|
Faxed the applicant a copy of the faxed letter from the consulting structural engineer requesting additional calculations. JCM
|
Plan resubmittals requested | | | 9/7/2001 | | |
|
|
|
Faxed the applicant a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/29/2001 | | 9/7/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. KMM Received a fax from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 8/29/2001 | 8/29/2001 | 8/29/2001 | | PASS |
|
|
|
Approved as per CUP01-00085
|
Plan Reviewer's activity | | | 8/29/2001 | | PASS |
|
|
|
Plans reviewed and approved as submitted. JCM
|
Routing - PUBLIC WORKS | 8/21/2001 | | 8/29/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/28/2001 | 8/28/2001 | 8/28/2001 | | DONE |
Rita DeYoung
|
|
|
Grading and drainage approved as hillside.
|
Plan routing begun/NEW & ADDTN | | | 8/21/2001 | | DONE |
|
|
|
|
Additional plans submitted | | | 8/20/2001 | | DONE |
|
|
|
received struct. calcs. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2001 | | DONE |
|
|
|
Called Warren Stewart of United Water advised him that structural caculations were required.. Talked to Brian Murphy about grading and drainage, apparently Terry Records is going to take care of it when it hits public works so no grading plan per se is required.
|
Application received | | | 8/9/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2001 | | DONE |
|
|
|
|