Case Summary (BLD) | | | 6/16/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/20/2006 | | |
|
|
|
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 9/25/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/18/2006 | 9/25/2006 | | DONE |
|
|
|
|
BLD-Final | 8/18/2006 | 8/18/2006 | 8/18/2006 | P | PASS |
Dave Hannah
|
|
|
Thomas; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
BLD-Final | 8/17/2006 | 8/18/2006 | 8/18/2006 | A | PASS |
Dave Hannah
|
|
|
clay - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Final | 8/16/2006 | 8/17/2006 | 8/18/2006 | P | NR |
Dave Hannah
|
|
|
clay - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley waiting for fire
|
Permanent Occupancy | | 8/18/2006 | 8/18/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/18/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11175 issued 8-18-06 to the Main Street Bistro.
|
BLD-Other | 7/7/2006 | 7/11/2006 | 7/12/2006 | P | PART |
Dave Hannah
|
|
|
CLAY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles back exit incloser ok
|
BLD-Final | 5/26/2006 | 5/30/2006 | 5/30/2006 | P | FAIL |
Dave Hannah
|
|
|
clay; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles fire walls and infills not done also fire doors are wrong
|
FIRE-Final Inspection | 5/18/2006 | 5/24/2006 | 5/24/2006 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been completed, fire life safety is acceptable.
|
BLD-Final | 3/14/2006 | 3/15/2006 | 3/20/2006 | P | NR |
Dave Hannah
|
|
|
please call when on way//request early pm///clay roman; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs fire sign off
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | P | FAIL |
Forrest France
|
|
|
See correction notice on site for list of items discussed including current certification on fire extinguishers, exit signs, emergency lights, doors at rated exit, fire sprinkler permit issues.
|
Telephone call | | | 3/16/2006 | | DONE |
|
|
|
Clay, manager of the Bistro called. I told him that he needed the approved job site plans available for inspectors and needed to call for final inspections. When all inspections are approved/passed, he can then come in and obtain a new Certificate of Occupancy for the space.
|
BLD-Aging Inspection | 11/22/2005 | 11/22/2005 | 11/22/2005 | | PASS |
Dave Hannah
|
|
|
wip
|
Case Summary (BLD) | | | 10/3/2005 | | |
|
|
|
|
BLD-Aging Inspection | 9/22/2005 | 9/22/2005 | 9/22/2005 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PART |
Jim Storey
|
|
|
###-#### - fred reviewed proceger to achive co with insp. needed
|
Case Summary (BLD) | | | 6/20/2005 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/3/2005 | 6/3/2005 | 6/6/2005 | | DONE |
Forrest France
|
|
|
I spoke with Fred Bartlett ###-####, who is now the new GM for the facility, and discussed the actions required to final this permit. He will obtain the proper documents and call for inspection when ready.
|
BLD-Aging Inspection | 3/30/2005 | 3/30/2005 | 4/6/2005 | | DONE |
Forrest France
|
|
|
I called Jake, ###-####, and left message on voice mail requesting status of job
|
BLD-Final | 9/21/2004 | 9/27/2004 | 9/27/2004 | A | CANC |
Dave Hannah
|
|
|
###-#### jake
|
FIRE-Final Inspection | 9/24/2004 | 9/27/2004 | 9/27/2004 | A | FAIL |
Rick Jackson
|
|
|
jake; ###-#### Need resubmittals from 6/03; emergency lights per plans; repair exit signs; sprinklers in the pendant and upright positions in area of old kitchen with ceiling removed - need submittals; post occupand load signs; remove fan from south exit area; area on second floor being used and not authorzed per plans 9/27/2004 3:07:07 PM
|
BLD-Final | 9/27/2004 | 9/27/2004 | 9/27/2004 | P | FAIL |
Dave Hannah
|
|
|
###-#### jake needs new plans so we can deo an inspection 9/27/2004 2:07:12 PM
|
FIRE-Final Inspection | 9/21/2004 | 9/24/2004 | 9/24/2004 | A | CANC |
Troy Cobbley
|
|
|
###-#### jake Cancelled by troy cobbley, to be rescheduled for monday per rick jackson 9/24/2004 9:36:03 AM
|
BLD-Final | 9/14/2004 | 9/17/2004 | 9/17/2004 | A | CANC |
Dave Hannah
|
|
|
jake; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs fire l/s sign off 9/17/2004 9:12:42 AM
|
Print Occupancy Form | | | 9/14/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/9/2004 | 7/9/2004 | 7/9/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 5/6/2004 | 5/6/2004 | 5/6/2004 | | DONE |
Dave Hannah
|
|
|
action taken debest will schedule fire inspection 5/10/2004 8:48:37 AM
|
BLD-Conference | 5/6/2004 | 5/6/2004 | 5/6/2004 | A | PART |
Rick Jackson
|
|
|
The fire sprinkler permit has not been finaled so Debest was notified about the open permit and they will schedule a final inspection 5/6/2004 4:10:10 PM
|
BLD-Aging Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/4/2003 | 11/4/2003 | 11/4/2003 | | DONE |
Dave Hannah
|
|
|
WILL CHECK ON FIRE LIFE SAFTY SIGN OFF AND SCHEDULE A FINAL 11/4/2003 10:23:27 AM
|
Reopen Permit (ISS) | | | 10/7/2003 | | DONE |
|
|
|
|
Reopen Permit (ISS) | | | 10/7/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/7/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/25/2003 | | DONE |
|
|
|
left mess for john price that permit needs to be picked up
|
Telephone call | | | 6/16/2003 | | DONE |
|
|
|
permit ready
|
Plan assigned to (JCB) | 5/13/2003 | | 6/12/2003 | | PASS |
Jason Blais
|
|
|
6/12/2003 16:19:55 JCB - activity updated through activity BLDA022 from case BLD01-02245.
|
Routing - PLAN CHECK | 6/12/2003 | | 6/12/2003 | | PASS |
|
|
|
Plan modification approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/23/2003 | | 6/10/2003 | | PEND |
|
|
|
Plan modification review sent to architect. No response required. Architect is going to provide verification of adequacy for the ventilation system. Fire Dept. approval required. Plans routed to Fire Dept.
|
Telephone call | | | 6/10/2003 | | |
|
|
|
Called architect John Price concerning the adequacy of the existing ventilation system with the increased occupant load. He said Musgrove checked it out and that the system is adequate and a report will be provided verifying this.
|
BLD-Conference | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | NR |
Carl Dependahl
|
|
|
###-#### jack...need revised plan? 6/2/2003 12:17:09 PM
|
BLD-Conference | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | PASS |
Carl Dependahl
|
|
|
install rails generally as shown 6/2/2003 3:20:29 PM
|
Override - Parcel Holds | | | 5/30/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 5/13/2003 | | 5/23/2003 | | FAIL |
|
|
|
(plan modification) Plans to route to Public Works first then will do review on the Plan Modification.
|
Routing - PUBLIC WORKS | 5/23/2003 | | 5/23/2003 | | PASS |
Louise Waldorf
|
|
|
Plan modification no additional fees per Louise
|
Plan resubmittals received | | | 5/23/2003 | | |
|
|
|
Plan modification resubmittals received. Two copies of revised sheets A0.0, A2.1, A4.0, one copy of cover letter and one copy of response letter. Routed to Jason B. kmm
|
Telephone call | | | 5/23/2003 | | |
|
|
|
Talked to John Price, architect, concerning the occupant load of the main floor. The 1997 UBC shall be the governing code. Cannot not mix and match 1997 and 2000 code requirements as requested in a letter. Either to meet 1997 UBC or all requirements of the 2000 IBC. Verified with other plan reviewers, Fire Department, and Building Director.
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2003 | | DONE |
|
|
|
Plan modification
|
Plan routing begun/TENANTS | | | 5/13/2003 | | DONE |
|
|
|
Plan modification
|
CHANGE STATUS TO (PND) | | | 5/9/2003 | | DONE |
|
|
|
Plan modification submitted
|
PRINT ACTIONS | | | 5/2/2003 | | DONE |
|
|
|
|
BLD-Final | 2/25/2003 | 2/26/2003 | 2/26/2003 | P | FAIL |
Carl Dependahl
|
|
|
###-#### call first...c/n, need resubmittal, com 2/26/2003 4:42:23 PM plete life safety items; partial insp only. 2/26/2003 4:43:54 PM
|
BLD-Conference | 12/30/2002 | 12/31/2002 | 12/31/2002 | A | CANC |
Jim Sly
|
|
|
ted please call first to so ted can meet you there; Phone #: ###-#### Internet Inspection Request from: Darla Downs Put on my schedule when I was on vacation.....Told Ted to re-call. 1/6/2003 9:09:23 AM
|
BLD-Aging Inspection | 12/10/2002 | 12/10/2002 | 12/11/2002 | | FAIL |
Carl Dependahl
|
|
|
posted c/n...no call for insp, do not conceal work, exps 1-03. 12/11/2002 5:51:32 PM
|
Issue PAID IN FULL permit | | | 7/19/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/11/2002 | | DONE |
|
|
|
talked to john price to verify plans are ready
|
Telephone call | | | 6/19/2002 | | DONE |
|
|
|
left mess for john price that permit is ready
|
Routing - FIRE | 6/10/2003 | | 6/11/2002 | | PASS |
|
|
|
Plan modification approved. No revisions necessary to previously issued plan review comments; refer to review comments as revised 05/02/2002 and issued with original permit.
|
Routing - FIRE | 4/29/2002 | 5/2/2002 | 5/2/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 5/2/2002 | | 5/2/2002 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2002 | | DONE |
|
|
|
permit ready
|
Plan assigned to (JCB) | 8/23/2001 | | 5/2/2002 | | PASS |
Jason Blais
|
|
|
5/2/2002 10:25:41 JCB - activity updated through activity BLDA022 from case BLD01-02245.
|
Routing - PLAN CHECK | 4/25/2002 | | 4/29/2002 | | PEND |
|
|
|
When approved by Fire Dept. permit can be issued. Plans routed to Fire Dept.
|
Plan Review Completed(1st rev) | | | 4/25/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 4/23/2002 | | 4/25/2002 | | FAIL |
|
|
|
sprinklers
|
Routing - PLUMBING | 4/18/2002 | | 4/23/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/22/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A0.0, A2.0, A2.1, A2.2, with cover letter. Routed to Jason Blais.
|
Routing - PUBLIC WORKS | 4/16/2002 | | 4/18/2002 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 4/16/2002 | | |
|
|
|
Plan resubmittals and response required again.
|
Routing - PLAN CHECK | 3/22/2002 | | 4/16/2002 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review again.
|
Plan resubmittals received | | | 4/2/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheet A2.1 with cover letter. Routed to Jason Blais.
|
Telephone call | | | 3/22/2002 | | DONE |
|
|
|
Called John Price and went over items still needing to be addressed and shown on plans. He acknowledged and said new plans would be coming.
|
Plan resubmittals requested | | | 3/22/2002 | | |
|
|
|
Plan resubmittals required again.
|
Routing - PLAN CHECK | 9/28/2001 | | 3/22/2002 | | FAIL |
|
|
|
Resubmittal sheets provided still have some issues to resolve. Called architect and let him know. He acknowledged and said more plans would be provided.
|
Plan resubmittals received | | | 3/19/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A0.0, A2.1, P2.1, with approval from CDHD and cover letter. Routed to Jason Blais.
|
Plan resubmittals received | | | 3/1/2002 | | DONE |
|
|
|
Received two copies of revised sheets A0.0, A2.0, A2.1, A2.2, A3.0, A4.0, A5.0, three copies of struct. calcs for Bistro remodel and ceiling joist design, one copy of basement floor remodel, first floor plan, second floor plan. One copy of response letter and transmittal sheet. Routed to Jason B. kmm
|
Routing - PLUMBING | 2/19/2002 | | 2/23/2002 | | PASS |
|
|
|
per plans and 2000 upc
|
Plan Review Completed(1st rev) | | | 9/28/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 9/27/2001 | | 9/28/2001 | | FAIL |
|
|
|
sprinkler issues, alarms
|
Routing - PLAN CHECK | 8/23/2001 | | 9/27/2001 | | FAIL |
|
|
|
Numerous issues with this project. It appears work has occurred without permits and the occupant load has now been increased. It appears as if the occupancy has now changed because of the increased occupant load. New plans need to be submitted reflecting changes. I contacted architect by phone and fax to set up a meeting to discuss issues with this project. Building also is not currently fully fire sprinklered. Only the main floor and basement have been sprinklered. Plans routed to Fire Dept. for review even though plans are very inadequate.
|
Telephone call | | | 9/26/2001 | | DONE |
|
|
|
Called architect to set up a meeting to discuss the numerous issues with this project. New plans will need to be submitted.
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2001 | | DONE |
|
|
|
<$25,000
|
Received Certificate of Value | | | 8/17/2001 | | DONE |
|
|
|
|
Application received | | | 8/17/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/17/2001 | | |
|
|
|
|
BLD-Conference | 7/9/2004 | 7/9/2004 | | P | |
Rick Jackson
|
|
|
|
Fee Review-notes | 8/17/2001 | 8/17/2001 | | | |
|
|
|
|