Permit Information
Permit NumberBLD01-02264
StatusFinaled
Name GREGG OSTROW (OWNER'S CONTACT)
Site Address 100 E IDAHO ST Unit: 303
Project NameST LUKES-SOUTH TOWER
Customer Number 
ePlanReviewNo
Description
(ST LUKES-SOUTH TOWER-3RD FLR)(DR GRIFFITHS, SUITE 303) To remove all interior non-bearing walls within the existing tenant space. To remodel the 2,448 sq. ft. area by constructing interior, non-bearing, non-combustible, fire-resistive walls to create exam, office, procedure, consulting, waiting, reception and support / work rooms for medical offices; two new fully accessible restrooms; new suspended grid ceiling system; mechanical, electrical, plumbing, sprinkler & alarms system upgrades to meet tenants needs and comply with applicable adopted codes; install new rated 20 minute door assembly and 3/4 hour rated sidelite in existing 1-hour corridor and new interior finishes. All per approved plans, to include red-line notes & attached plan review comments as part thereof. NOTE: This building is fully sprinklered. A"CERTIFICATE OF OCCUPANCY" IS REQUIRED FOR THIS NEW TENANT AS A CONDITION OF THIS PERMIT. PC#01-684/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/20/20018/20/20017/5/2002 DONE
Permanent occupancy  3/26/2002 DONE
Perm. Occ. Cert. #9084 issued 3-26-02 to St. Luke's Hospital - Dr. Griffiths, 3rd floor, south tower.
Permanent Occupancy 3/8/20023/8/2002 DONE
Details
BLD-Final3/7/20023/8/20023/8/2002APASS
DetailsCarl Dependahl
dan ###-#### fn , verify hvac. 3/8/2002 1:39:23 PM
FIRE-Final Inspection2/22/20022/25/20022/25/2002APASS
DetailsRick Jackson
###-####
BLD-Final2/25/20022/25/20022/25/2002PNR
DetailsCarl Dependahl
dan ###-####
BLD-Framing/Rough-in2/6/20022/6/20022/6/2002PPART
DetailsCarl Dependahl
ceiling ###-####, spray on ok, grid ok 2/6/2002 4:46:09 PM
BLD-Framing/Rough-in1/3/20021/4/20021/4/2002ANR
DetailsCarl Dependahl
CEILING\###-####...need elec prior to tiles. 1/4/2002 10:39:23 AM
BLD-Framing/Rough-in12/10/200112/10/200112/10/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/10/2001 at 11:14:28. Contact: ###-####. walls ok, chk spray on at exist beam, firestops at corridor at grid insp. 12/10/2001 5:02:36 PM
Issue & PRINT to be Invoiced  10/3/2001 DONE
Inspection Record Card- Bld  10/1/2001 DONE
Print Occupancy Form  10/1/2001 DONE
Telephone call  10/1/2001 DONE
e mailed.
Routing - PLAN CHECK9/28/20019/28/20019/28/2001 PASS
9/28/01 - Received architects response to plan review comments. Plans approved as noted and attached. Routing to permit desk.
Plan resubmittals received  9/28/2001 PASS
9/28/01 - Received response from architect, John Maulin. The Unistrut system was removed from scope of work and will be done latter under separate permit. The Exhaust hood was removed from scope of work. No Hazardous materials used or stored at tenant site and no medical gas used or stored.
PLANS/APPL TAKEN TO FRONT DESK  9/28/2001 PASS
To permit desk for issue.
Plan assigned to (DRS)8/27/2001 9/28/2001 PASS
DetailsDan Stuart
9/28/2001 18:01:11 DRS - activity updated through activity BLDA022 from case BLD01-02264.
Routing - FIRE9/19/2001 9/20/2001 PASS
Plan Review Completed(1st rev)  9/20/2001 FAIL
Plan resubmittals requested  9/19/2001 FAIL
COPY OF PLAN REVIEW COMMENTS FAXED AND MAILED TO ARCHITECT, JOHN MAULIN FOR RESPONSE.
Routing - PLAN CHECK8/29/2001 9/19/2001 FAIL
RESUBMITTALS & CLARIFICATIONS REQUIRED. ROUTING TO FIRE CODE ANALSYST WHILE WAITING FOR RESPONSE FROM ARCHITECT. FAXED AND MAILED COPY OF REVIEW TO ARCHITECT.
Routing - PUBLIC WORKS8/27/2001 8/28/2001 PASS
Routing - PLUMBING8/28/2001 8/28/2001 PASS
per plans and 97 upc
Plans ACCEPTED BY PLAN TECH  8/22/2001 DONE
Received Certificate of Value  8/20/2001 DONE
Application received  8/20/2001  
Routing - PLAN CHECK9/20/2001