Permit Information
Permit NumberBLD01-02267
StatusExpired
Name CAPITOL TERRACE (ESCALATOR REPLACEMENT)
Site Address 150 N 8TH ST
Project NameCAPITOL TERRACE
Customer Number 
ePlanReviewNo
Description
(CAPITOL TERRACE - ESCALATOR REPLACEMENT) Fire sprinklers used to meet high-rise provisions. To install a new escalator between the first floor and second floor of an existing building. The escalator support beam on the second floor is being relocated. Below the new escalator, a 60 square foot ticket booth is being constructed. Also, a portion of the existing escalator opening in the second floor is being filled in. New support beams and a 125 square foot concrete floor slab will be constructed. Work is to include floor beams, a floor slab, fire-resistive protection, interior nonbearing walls, guardrail, windows, door, service counter, and escalator all per approved drawings, engineering, and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. The new escalator shall comply with ASME/ANSI A17.1-1987. The old escalator was removed under demolition permit BLD01-02554. PC-0685-01 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/5/200311/5/200311/5/2003 DONE
DetailsDave Hannah
DOC - Permit Expired11/5/200311/5/200311/5/2003APASS
DetailsDave Hannah
Expired by inspector at 11/5/2003 8:04:03 AM
BLD-Footing7/9/20037/10/20037/10/2003ACANC
DetailsCarl Dependahl
garage/carport ftgs...added in error 7/9/2003 2:07:21 PM
Fee Review-notes8/20/20018/20/20014/29/2002 DONE
BLD-Conference3/1/20023/1/20023/1/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:11. Contact: ###-####. w/ Larry Hansen...may need permit for art work supports near escalator. Consult plans review. 3/1/2002 5:08:25 PM
BLD-Aging Inspection1/8/20021/8/20021/8/2002 NR
DetailsCarl Dependahl
Cap.Terrace escalator, called Larry H, left msg to get final, need spec insp reports. 1/11/2002 11:39:31 AM
BLD-Conference11/8/200111/8/200111/8/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/8/2001 9:43:35 AM rec'd revised ftg eng'g; awaiting spec insp reports for welds, fireproofing.
BLD-Framing/Rough-in10/26/200110/26/200110/26/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/26/2001 at 10:07:38. Contact: ###-####....frame c/n ok pending spec insp reports for welds/fireproofing. 10/26/2001 1:58:46 PM
BLD-Conference10/23/200110/23/200110/23/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/23/2001 5:40:56 PM w/ Larry H & contractor re spec insp...keep c/n re guardrails.
BLD-Framing/Rough-in10/22/200110/22/200110/22/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/22/2001 at 09:19:12. Contact: ###-####....need plans; insp reports 10/22/2001 3:31:14 PM
BLD-Framing/Rough-in10/19/200110/19/200110/19/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/19/2001 at 08:53:38. Contact: ###-####...awaiting spec insp reports from Strata 10/19/2001 2:21:23 PM
BLD-Conference10/19/200110/19/200110/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/19/2001 2:00:33 PM w/ Larry Hanson...has spec insp reports for fireproofing & welds
BLD-Other10/9/200110/10/200110/10/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/09/2001 at 15:17:53. Contact: ###-####...met onsite, header beam is secondary & doesn't req complete 3hr protection. 10/10/2001 2:08:43 PM
BLD-Conference10/9/200110/9/200110/9/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/9/2001 2:37:00 PM keep c/n, rec'd resubmittal, need clarify prop. lines or right -of-way.
Plan resubmittals received  10/9/2001 DONE
Received two copies of revised sheets Three and calculations from Pinnacle. Routed to Carl D. KMM
BLD-Footing9/26/20019/27/20019/27/2001AFAIL
DetailsCarl Dependahl
larry ###-#### c/n issued, pour at own risk; verify ACHD ok for work at sidewalk/public way. ftg steel appears ok per plans. spec insp reqd for struct frame & fireproofing. 9/27/2001 11:28:28 AM
BLD-Foundation9/27/20019/27/20019/27/2001PPART
DetailsCarl Dependahl
###-#### proceed at own risk pending letter fromm CCDC or ACHD re sidewalks; keep c/n 9/27/2001 2:49:54 PM
Issue PAID IN FULL permit  9/26/2001 DONE
Plan assigned to (CJW)8/27/2001 9/21/2001 PASS
DetailsCarl Westfall
9/21/01 11:02:40 CJW - activity updated through activity BLDA022 from case BLD01-02267.
Routing - PLAN CHECK9/13/2001 9/21/2001 PASS
Drawings approved, with conditions, after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  9/21/2001 PASS
Inspection Record Card- Bld  9/21/2001 DONE
Print Occupancy Form  9/21/2001 DONE
Telephone call  9/21/2001 DONE
Plan resubmittals received  9/19/2001  
Resubmittal sheet #3 and engineering calculations received and routed to Carl Westfall.
Plan Review Completed(1st rev)  9/13/2001  
Failed first UBC review.
Routing - FIRE9/10/2001 9/13/2001 PASS
Routing - PLAN CHECK8/30/2001 9/10/2001  
Failed first UBC review.
Plan Reviewer's activity  9/7/2001  
Failed first UBC review. UBC plan review started September 7, 2001 and finished September 10, 2001. A response from the architect was required. See the conditions list.
Routing - PLANNING8/27/2001 8/30/2001 PASS
Plans ACCEPTED BY PLAN TECH  8/22/2001 DONE
Received Certificate of Value  8/20/2001 DONE
Application received  8/20/2001  
Recd Pcfee & Taken To Pln CK  8/20/2001 DONE