BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Steven Webb
|
|
|
lock box code 193 --terry- ###-#### c. of c. #22187 issued. 4/17/2002 10:27:51 AM
|
DOC - Permit Finaled | 4/17/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 4/17/2002 10:27:56 AM
|
BLD-Final | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | FAIL |
Steven Webb
|
|
|
###-####--lock box code is 193 c/n issued--tempered glass needed in both bathrooms with windows--within 5' of standing surface of tub/shower 3/29/2002 9:00:01 AM
|
BLD-Energy code compliance | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 10:23:41. Contact: ###-####. ok to cover 1/22/2002 10:59:53 AM
|
BLD-Framing/Rough-in | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PART |
Steven Webb
|
|
|
###-#### c/n posted on site--ok to insulate 1/11/2002 8:56:57 AM
|
BLD-Framing/Rough-in | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | PASS |
Steven Webb
|
|
|
shear nail terry ###-#### ok to side 12/21/2001 1:23:19 PM
|
BLD-Framing/Rough-in | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | FAIL |
Steven Webb
|
|
|
shear nail terry -###-#### SHEAR-Verbal correction--missing shear panels/blocks/nailing upstairs 12/20/2001 10:30:13 AM
|
BLD-Framing/Rough-in | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### Shear--Holdowns not installed and some blocks are missing. 12/19/2001 3:01:44 PM
|
BLD-Aging Inspection | 11/19/2001 | 11/19/2001 | 11/19/2001 | | PART |
Steven Webb
|
|
|
wip 11/19/2001 8:59:03 AM
|
BLD-Footing | 9/19/2001 | 9/19/2001 | 9/19/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 07:24:27. Contact: ###-####. wip--foundation not footing 9/19/2001 10:20:01 AM
|
BLD-Footing | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PART |
Dave Hannah
|
|
|
ft insp -###-####- steve work in progress 9/18/2001 2:18:30 PM
|
Issue PAID IN FULL permit | | | 9/11/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/28/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/23/2001 | | 8/28/2001 | | PASS |
Steve Munroe
|
|
|
8/28/2001 13:13:53 SAM - activity updated through activity BLDA022 from case BLD01-02318.
|
Plan Reviewer's activity | | | 8/24/2001 | | PEND |
|
|
|
8:45 I called and talked to Scott with Prestige Homes. I had question on the construction of the raised floor rim, pier pad for girder, wall bracing and wall bearing in foundation by stairs. Scott said he would resubmit sheet A-4.
|
Print Pending Permit.LaserJet4 | | | 8/24/2001 | | |
|
|
|
|
Plan Review Report | | | 8/24/2001 | | |
|
|
|
|
Routing - PLANNING | 8/23/2001 | 8/23/2001 | 8/23/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/23/2001 | 8/23/2001 | 8/23/2001 | | DONE |
|
|
|
|
Application received | | | 8/23/2001 | | |
|
|
|
|
Pending Assignment by DJO | 8/23/2001 | | 8/23/2001 | | DONE |
Dan Overy
|
|
|
8/23/2001 11:04:00 SAM - activity updated through activity BLDA183 from case BLD01-02318.
|
Routing - PLAN CHECK | 8/23/2001 | 8/23/2001 | | | PEND |
|
|
|
|