BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Steven Webb
|
|
|
###-#### TERRY 193 LOCK BOX CODE c. of c. #20968 issued 12/28/2001 9:00:07 AM
|
DOC - Permit Finaled | 12/28/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 12/28/2001 9:00:22 AM
|
BLD-Final | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | CANC |
Steven Webb
|
|
|
re-insp fn terry-- ###-####--lock box # 193 Insp. 420 not at work on this day. 12/26/2001 8:04:00 PM
|
BLD-Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | FAIL |
Steven Webb
|
|
|
terry ###-#### fn occ--lock box code 193 c/n--tempered glass needed above master tub. 12/20/2001 10:11:50 AM
|
BLD-Energy code compliance | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Steven Webb
|
|
|
terry-- ###-#### energy code
|
BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | PASS |
Steven Webb
|
|
|
fr insp terry- ###-#### ok to insulate--prior c/n items completed. 10/29/2001 1:48:47 PM
|
BLD-Framing/Rough-in | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | FAIL |
Steven Webb
|
|
|
fr terry-- ###-#### c/n posted on site--do not insulate 10/26/2001 10:16:10 AM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | PASS |
Steven Webb
|
|
|
sheer panel ###-#### terry back patio ceiling--ok to install soffit. 10/17/2001 1:01:59 PM
|
BLD-Framing/Rough-in | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | PART |
Steven Webb
|
|
|
terry-- ###-#### shear ok to cover EXCEPT back patio ceiling-need to verify gable brace and hurricane clips. 10/16/2001 9:41:58 AM
|
BLD-Framing/Rough-in | 10/11/2001 | 10/15/2001 | 10/15/2001 | A | FAIL |
Steven Webb
|
|
|
terry shear nail -###-#### c/n issued--additional nails needed on panels marked with yellow crayon and upstairs panels need blocks at seams. 10/15/2001 10:09:22 AM
|
BLD-Footing | 9/14/2001 | 9/14/2001 | 9/14/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 09:36:52. Contact: ###-####. wip 9/14/2001 2:44:13 PM
|
Issue PAID IN FULL permit | | | 9/11/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/24/2001 | 8/24/2001 | 8/24/2001 | | PASS |
Dan Overy
|
|
|
8/24/2001 08:51:54 DJO - activity updated through activity BLDA022 from case BLD01-02319.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/24/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 8/24/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2001 | | DONE |
|
|
|
permit ready
|
Plans ACCEPTED BY PLAN CHECK | | | 8/24/2001 | | |
|
|
|
|
Routing - PLANNING | 8/23/2001 | 8/23/2001 | 8/23/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/23/2001 | 8/23/2001 | 8/23/2001 | | DONE |
|
|
|
|
Application received | | | 8/23/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 8/23/2001 | 8/23/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 8/23/2001 | | | | PEND |
Dan Overy
|
|
|
|