PostCard Mailed | | | 9/29/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Final | 2/26/2002 | 2/27/2002 | 2/27/2002 | A | PASS |
Alan Hauser
|
|
|
Cathy has $1,000 cash. ck. for driveway c/c #21678 2/27/2002 11:49:49 AM
|
BLD-Final | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | FAIL |
Carl Dependahl
|
|
|
fn insp -###-####- steve complete finegrade, driveway, elec insp...no further insp. 2/21/2002 9:25:28 AM
|
BLD-Framing/Rough-in | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Steven Webb
|
|
|
###-#### Everything ok to cover 12/12/2001 11:19:38 AM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | PART |
Steven Webb
|
|
|
###-#### c/n posted--ok to cover except b-vent area--needs draftstop and protection above roof line to prevent insulation from filling b-vent enclosure. 12/10/2001 1:27:19 PM
|
BLD-Framing/Rough-in | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### prior c/n grider nailing not completed plus insulation not completed. Call for energy reinspection. 12/7/2001 3:22:21 PM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Steven Webb
|
|
|
###-#### BRYAN c/n posted-ok to insulate 12/6/2001 2:13:36 PM
|
BLD-Framing/Rough-in | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | NR |
Steven Webb
|
|
|
###-#### BRYAN c/n posted-no trade have been signed off. 12/5/2001 12:56:07 PM
|
BLD-Other | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 11/13/2001 2:54:48 PM Shear--ok to side 11/14/2001 10:27:53 AM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | CANC |
Steven Webb
|
|
|
###-#### brian sheer panel contractor had requested for 11/14/01 not 11/13/01. 11/13/2001 2:55:32 PM
|
BLD-Foundation | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Steven Webb
|
|
|
paul ###-#### found wall wip 10/11/2001 3:28:53 PM
|
BLD-Footing | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PART |
Steven Webb
|
|
|
###-#### jerry wip 10/9/2001 10:43:32 AM
|
BLD-Conference | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | DONE |
Steven Webb
|
|
|
No one at site--no contact telephone number--I left a note along with a business card. 10/4/2001 2:15:52 PM
|
BLD-Foundation | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Steven Webb
|
|
|
wip 9/20/2001 9:12:40 AM
|
BLD-Footing | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Russ Owen
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 8/31/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/27/2001 | | 8/30/2001 | | PASS |
Steve Munroe
|
|
|
8/30/2001 09:40:44 SAM - activity updated through activity BLDA022 from case BLD01-02327.
|
Plan Reviewer's activity | | | 8/30/2001 | | PEND |
|
|
|
8:15 I called and Brian, with Statewide, some questions. I needed to know about the retaining wall in the rear of the house. He said it is only going to be three feet tall. I will note the plans that engineering is required if four feet or taller.
|
Print Pending Permit.LaserJet4 | | | 8/30/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 8/30/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/30/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2001 | | DONE |
|
|
|
permit ready
|
Plan Reviewer's activity | | | 8/29/2001 | | PEND |
|
|
|
16:20 Called the designer. Asked if they wanted the holdown where the den and garage meet to be left in, if the trusses over the entry cantilevered or three point bearing and what the header size is for the single bay. I still need to call the builder and ask about engineering for the retaining wall.
|
Pending Assignment by DJO | 8/23/2001 | | 8/27/2001 | | DONE |
Dan Overy
|
|
|
8/27/2001 14:59:16 SAM - activity updated through activity BLDA183 from case BLD01-02327.
|
Routing - PLANNING | 8/23/2001 | 8/23/2001 | 8/24/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/23/2001 | 8/23/2001 | 8/24/2001 | | DONE |
|
|
|
|
Application received | | | 8/23/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 8/24/2001 | 8/24/2001 | | | PEND |
|
|
|
|