Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-02337
StatusExpired
Name THOMPSON SEAN C
Site Address 3740 W PINEHURST DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of a 370s.f. rec room to an existing single family dwelling. This slab is to conform to the boise city energy code for frost and thermal transfer. see attachement from model energy code manual. Smoke detectors in the existing dwelling are required per UBC 310.9 (battery ok) All per the approved plans as marked and attached. R-1C setbacks ok per rhj pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference5/16/20035/20/20035/20/2003AFAIL
DetailsTony Young
no word yet from roofer 5/20/2003 12:54:29 PM
BLD-Conference5/15/20035/16/20035/16/2003PNR
DetailsTony Young
call sean 1st to ck on roofer info
BLD-Final5/13/20035/15/20035/15/2003PFAIL
DetailsTony Young
###-#### sean ###-####,,, met with
robert rodriduze 863=4065,,,, talked about construction, venting,, appears all would be ok,,,, need to talk w/ roofer on type and method of application. 5/15/2003 2:05:24 PM
BLD-Framing/Rough-in5/2/20035/6/20035/6/2003PFAIL
DetailsTony Young
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
builder did not show up, all work has been covered, concerns about roof ststem, no plans on site, owner will recall 5/6/2003 4:07:30 PM
BLD-Final5/2/20035/2/20035/2/2003PFAIL
DetailsTony Young
SEAN ###-####
no frame inspection or energy,,, told sean to set up conf. w/ builder 5/2/2003 2:06:18 PM
BLD-Final4/23/20034/24/20034/24/2003ANR
DetailsDave Hannah
SEAN ###-#### needs elec final 4/24/2003 11:34:53 AM
CHANGE STATUS TO (ISS)  4/23/2003 DONE
OK TO PUT BACK TO ISSUE- PER GEORGE SLANE.///DLD
BLD-Final7/22/20027/24/20027/24/2002PNH
DetailsTony Young
###-#### ext 5420
7/24/2002 3:43:55 PM
PostCard Mailed  7/13/2002 SENT
PostCard has been mailed requesting inspection.
BLD-Aging Inspection1/7/20021/7/20021/7/2002 PART
DetailsTony Young
wip 1/7/2002 10:01:53 AM
BLD-Aging Inspection11/7/200111/7/200111/7/2001 PART
DetailsTony Young
wip 11/8/2001 9:25:53 AM
BLD-Wall cover9/7/20019/7/20019/7/2001PPART
DetailsTony Young
shear 9/7/2001 1:14:07 PM
ext. shear ok 9/7/2001 1:31:57 PM
BLD-Energy code compliance8/31/20018/31/20018/31/2001PPART
DetailsTony Young
slab insulation ok 8/31/2001 1:30:43 PM
BLD-Foundation8/28/20018/30/20018/30/2001PPART
DetailsTony Young
###-#### JOE wip, ok w/ verbal corrections 8/30/2001 3:14:52 PM
BLD-Footing8/28/20018/29/20018/29/2001PPASS
DetailsDave Hannah
###-#### JOE
Application received  8/24/2001  
Plan assigned to (PEP)8/24/2001 8/24/2001 PASS
DetailsPerry Paine
8/24/2001 11:27:45 PEP - activity updated through activity BLDA022 from case BLD01-02337.
Inspector's copy Bld permit  8/24/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/24/2001 DONE
Inspection Record Card- Bld  8/24/2001 DONE
Issue PAID IN FULL permit  8/24/2001 DONE