BLD-Aging Inspection | 6/20/2005 | 6/20/2005 | 6/23/2005 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/2/2004 | 11/2/2004 | 11/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | NR |
Dave Hannah
|
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | PASS |
Dave Hannah
|
|
|
rock; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 8/13/2004 | 8/13/2004 | 8/13/2004 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/26/2004 | 7/26/2004 | 7/26/2004 | | PASS |
Dave Hannah
|
|
|
wip 7/26/2004 8:05:45 AM
|
BLD-Final | 5/20/2004 | 5/21/2004 | 5/21/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 7:29:42 AM. Contact: ###-####. ok to move every one into new area this is the last phase need to finish storage room 5/21/2004 11:28:19 AM
|
FIRE-Final Inspection | 5/19/2004 | 5/19/2004 | 5/19/2004 | A | PART |
Rick Jackson
|
|
|
The alarm permit is completed; the exsisting waiting room is yet to be converted to the storage room and the fire sprinklers will be overspaced for the new storage room when it is completed 5/19/2004 10:34:44 AM
|
BLD-Framing/Rough-in | 4/28/2004 | 4/28/2004 | 4/28/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/28/2004 at 7:19:08 AM. Contact: ###-####. ok to drop in ceiling panals second fase 4/28/2004 12:07:17 PM
|
BLD-Framing/Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 6:52:40 AM. Contact: ###-####. needs to fire caulk around all openning in fire walls 4/27/2004 10:52:41 AM
|
BLD-Aging Inspection | 4/5/2004 | 4/5/2004 | 4/5/2004 | | PASS |
Dave Hannah
|
|
|
wip 4/5/2004 2:07:46 PM
|
FIRE-Final Inspection | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | PART |
Rick Jackson
|
|
|
Phase II area okay; Jason will put signs on doors leading to construction area and remove exit sign at double doors to construction area of Phase III; added exit sign as redlined on plans at double doors to east annex; alarms for the portion tested okay 2/2/2004 2:51:20 PM
|
Inspection Record Card- Bld | | | 1/21/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/9/2004 | 1/12/2004 | 1/12/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/9/2004 at 7:44:56 AM. Contact: ###-####. ok to install ceiling pannels ph2 of5 1/12/2004 11:12:34 AM
|
BLD-Framing/Rough-in | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/8/2004 at 7:27:56 AM. Contact: ###-####. ceiling grid ok but still needs vfire caulking on opennings 1/9/2004 8:37:21 AM
|
BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 3:30:22 PM. crew has installed fire stop between old bld and new at thierd floor 12/9/2003 12:31:46 PM
|
BLD-Framing/Rough-in | 11/19/2003 | 11/21/2003 | 11/21/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/19/2003 at 10:52:32 AM. Contact: ###-####. ok to cover framing phase two note need arch to look at area between old and new construction fire stopping at floor lines not done 11/21/2003 10:18:11 AM
|
BLD-Aging Inspection | 11/5/2003 | 11/5/2003 | 11/5/2003 | | PART |
Dave Hannah
|
|
|
work in progress 11/5/2003 8:02:45 AM
|
BLD-Framing/Rough-in | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/9/2003 at 7:47:38 AM. Contact: ###-####....need complete seal at exit walls lid 7/10/2003 2:16:44 PM
|
BLD-Framing/Rough-in | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PART |
Carl Dependahl
|
|
|
|
BLD-Conference | 6/5/2003 | 6/6/2003 | 6/5/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 8:01:48 AM. Contact: ###-####...wip...w/ proj mgr 6/5/2003 10:37:28 AM
|
BLD-Conference | 4/7/2003 | 4/8/2003 | 4/9/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 12:39:26 PM. Contact: ###-####...unable to contact, left word at const office to recall (Who requested insp?) 4/9/2003 1:38:03 PM
|
Case Summary (BLD) | | | 2/7/2003 | | |
|
|
|
|
BLD-Conference | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/25/2002 at 15:38:04. Contact: ###-####....w/ Stan Brown, eng'g going on for exit enclosure fix...2nd fl. demo work in progress (slow) corridors sealed/maitained for exiting. 11/26/2002 2:39:59 PM
|
BLD-Conference | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PASS |
Carl Dependahl
|
|
|
wendell; need to complete work associated w/ NICU-ER....remove ducts & penetrations at stair tower extension serving this area (through new expansion to exterior) see also BLD02-00172 6/27/2002 10:45:04 AM
|
Plan resubmittals received | | | 5/10/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets M2.3, P2.3, M2.5, E2.1, E3.1, E4.1, E5.1, E6.1, with transmittal. Routed to Dan Stuart.
|
Telephone call | | | 4/30/2002 | | DONE |
|
|
|
Called Carl Dependahl to see if this is a resubmittal or a plan modification. Carl told me to hold at plan review so he can review it.
|
Plan resubmittals received | | | 4/30/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets G0.2, A2.4, A7.4, A8.1, A8.4.2, A8.4.3, A9.4, A9.5, for the Neonatology Office change. Placed in Carl Dependahl's box to review since he has not stopped by plan review to okay if whether resubmittal or plan modification. Asked Carl to return to plan review after complete. Carl delivered to Dan Stuart. Dan Stuart approved resubmittals 5/1/02.
|
BLD-Conference | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/8/2002 3:49:03 PM w/ Stan & wendell, left approved modification for transition areas/ corridor...wip.
|
Plan resubmittals received | | | 3/21/2002 | | DONE |
|
|
|
Received two copies of revised sheet A2.4 and A8.1 and two copies of letter to Roger Gehrke. Routed to Dan S. kmm
|
Meeting | | | 1/29/2002 | | |
|
|
|
Meeting with Curtis Weedop of SLRMC. Economy slow down has affected the scope of work to be completed and the arrangement of the work. One floor will be completed and approved for occupancy and the other floor will be reviewed at that time to determine the continuation of the remodel project for the remaining floor to be remodeled. SLRMC has ask that the project be divided into two separate permits so each can be done separately depending on economy and budgeting. A new application and certificate of value was provided for each floor. There has been an overall reduction in project costs except for the alarm system upgrades. The original permit will be for the second floor and a new permit created for the first floor remodel. The plan check comments will apply to both floors as part of each permit. The original plans & documents were obtained from Records for replacement. The small documents have not been scanned to date so this will not create additional work. I checked with Linda Hartwell to see if a new permit would been acceptable as requested. The plan check fee had been paid but the remaining permit value had not been billed. I will provide her a copy of the new certificate of values.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2002 | | PASS |
|
|
|
New permit for second floor only taken to permit desk for re-issue using same BLD number.
|
Inspection Record Card- Bld | | | 1/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2002 | | DONE |
|
|
|
emailed permit ready
|
Issue & PRINT to be Invoiced | | | 1/3/2002 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/3/2002 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 1/3/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/2/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/2/2002 | | |
|
|
|
|
Telephone call | | | 1/2/2002 | | DONE |
|
|
|
e-mail curtis that permit is ready
|
Routing - PLAN CHECK | 10/29/2001 | | 12/28/2001 | | PASS |
|
|
|
Inserted resubmittals into plans. Approved as noted and attached plan review comments.
|
Plan assigned to (DRS) | 8/30/2001 | | 12/28/2001 | | PASS |
Dan Stuart
|
|
|
12/28/2001 15:08:36 DRS - activity updated through activity BLDA022 from case BLD01-02341.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2001 | | PASS |
|
|
|
To permit desk for issue.
|
Plan resubmittals received | | | 12/21/2001 | | DONE |
|
|
|
Received two copies of revised sheets A2.3 A2.4, A5.1, A7.5, A8.1, A8.4.3, A8.6, AND TWO COPIES OF PLAN RESPPONSE, TWO COPIES OF STRUCTURAL CALCULATIONS, TWO COPIES OF UL DATA SHEETS AND TWO COPIES OF STRUCTUREAL DETAILS AND RESPONSE. ROUTED TO DAN STUART. KMM
|
Plan resubmittals received | | | 11/29/2001 | | DONE |
|
|
|
Received two copies of revised full sets of plans. Two coies of response to plan review. Routed to Dan S. kmm
|
Routing - FIRE | 10/25/2001 | | 11/21/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 10/25/2001 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 10/24/2001 | | FAIL |
|
|
|
correction comments to architect for resposne.
|
Routing - PLAN CHECK | 9/6/2001 | | 10/24/2001 | | FAIL |
|
|
|
Correction comments mailed and faxed to architect for clarification and response. Routing plans to fire code analyst for review while waiting for architects response.
|
Routing - PLUMBING | 9/4/2001 | | 9/6/2001 | | PASS |
|
|
|
additional cross connection protection may be required
|
Routing - PUBLIC WORKS | 8/30/2001 | | 9/4/2001 | | PASS |
|
|
|
|
Application received | | | 8/24/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/24/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/24/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 8/24/2001 | | DONE |
|
|
|
|
Fee Review-notes | 8/24/2001 | 8/24/2001 | | | |
|
|
|
bld01-02341 was split into two permits (bld02-00172) I took part of the fees paid from bld01-02341 and aplied to new permit. lh
|