Case Summary (BLD) | | | 3/11/2009 | | DONE |
|
|
|
|
Fee Review-notes | 8/29/2001 | 8/29/2001 | 12/16/2002 | | DONE |
|
|
|
10/17--they totaled value on one permit, there are total of 5. applied to permits. bld01-00220,02384,02386 lh
|
BLD-Final | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/11/2002 1:52:08 PM ok for perm oc. cards delivered to store this day. 1/11/2002 2:01:49 PM
|
Permanent Occupancy | | 1/2/2002 | 1/2/2002 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 1/2/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #8979 issued 1-2-02 to Oak Express.
|
BLD-Final | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Tom Arcoraci
|
|
|
fn occ- eldon ###-#### ok for temp 11/14/2001 9:23:16 AM
|
Temporary occupancy | | | 11/14/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4642 issued 11-14-01 to Oak Express.
|
(F) Reprint permit | | | 10/31/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/9/2001 | | DONE |
|
|
|
permit ready
|
Routing - PLAN CHECK | 9/20/2001 | | 10/8/2001 | | PASS |
|
|
|
(9-20-01) Waiting for resolution of occupancy separation and racking issues. (9-28-01) Waiting for rack engineering and drawings. (10-8-01) Drawings approved after resubmittal review.
|
Plan assigned to (CJW) | 9/4/2001 | | 10/8/2001 | | PASS |
Carl Westfall
|
|
|
10/8/01 13:50:41 CJW - activity updated through activity BLDA022 from case BLD01-02386.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/5/2001 | | DONE |
|
|
|
Received rack engineering.
|
Telephone call | | | 9/28/2001 | | DONE |
|
|
|
Called Eldon Adams. Left message for him to provide what had been requested earlier.
|
Plan resubmittals received | | | 9/28/2001 | | DONE |
|
|
|
Received resubmitted sheet. Waiting for engineering.
|
Plan resubmittals received | | | 9/27/2001 | | DONE |
|
|
|
Received two copies of revised sheet A1.1R10 and one copy of cover letter. Routed to Carl W. kmm
|
Received Certificate of Value | | | 9/27/2001 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/20/2001 | | |
|
|
|
Failed first UBC review.
|
Routing - FIRE | 9/19/2001 | | 9/20/2001 | | PASS |
|
|
|
approved without written comment
|
Plan Reviewer's activity | | | 9/19/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started September 18, 2001 and finished the next day. A response from the architect was required. See the conditions list.
|
Routing - PLAN CHECK | 9/5/2001 | | 9/19/2001 | | |
|
|
|
Failed first UBC review.
|
Routing - PUBLIC WORKS | 9/4/2001 | | 9/4/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2001 | | PEND |
|
|
|
Requires one stamped and signed cover sheet. Eng. is done by California Eng. stating the use of seismic zone 2. KMM
|
Waiting for Cert. of Value | | | 8/30/2001 | | DONE |
|
|
|
Linda and Jim T are working on. KMM
|
Application received | | | 8/29/2001 | | |
|
|
|
|