BLD-Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 7/11/2002 3:15:58 PM
|
BLD-Final | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 13:35:46. Contact: ###-####.
c/n posted 7/10/2002 1:00:33 PM
|
BLD-Grading Inspection | 7/8/2002 | 7/8/2002 | 7/8/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Energy code compliance | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Tony Young
|
|
|
###-#### john
|
BLD-Framing/Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Tony Young
|
|
|
###-#### JOHN
ok to insulate// strap beams, top plates 3/12/2002 2:20:12 PM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### shear nailing...ext nailing ok 2/26/2002 5:43:17 PM
|
BLD-Aging Inspection | 1/15/2002 | 1/15/2002 | 1/15/2002 | | PART |
Tony Young
|
|
|
wip 1/16/2002 9:52:33 AM
|
BLD-Foundation | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PART |
Tony Young
|
|
|
###-#### STEVE
|
BLD-Foundation | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | PART |
Tony Young
|
|
|
###-#### STEVE
|
BLD-Footing | 11/7/2001 | 11/8/2001 | 11/8/2001 | A | PART |
Tony Young
|
|
|
###-#### STEVE
not pouring yet, need soils report, finish setting up 11/8/2001 12:07:16 PM
|
BLD-Conference | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Russ Owen
|
|
|
###-#### STEVE
|
BLD-Conference | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 11/7/2001 12:55:58 PM I had called this number at 11:00am left message to call me back , at 3:00pm icalled back left another message to call me I do not know the location of this job, It does not show on my 3 maps I have. 11/7/2001 3:15:51 PM
|
Issue PAID IN FULL permit | | | 10/19/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 10/15/2001 | | 10/15/2001 | | PASS |
Steve Munroe
|
|
|
10/15/2001 14:20:40 SAM - activity updated through activity BLDA022 from case BLD01-02389.
|
Plan Reviewer's activity | | | 10/15/2001 | | PEND |
|
|
|
9:00 I called and talked to Bob with Pinacle. We went over some question of Dan Overy's.
ONLY ONE SET IS BEING APPROVED DUE TO EXCESSIVE RED-LINING.
|
Plan Review Report | | | 10/15/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 10/15/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2001 | | DONE |
|
|
|
|
Pending Assignment by DJO | 8/29/2001 | | 10/15/2001 | | DONE |
Dan Overy
|
|
|
10/15/2001 09:36:42 SAM - activity updated through activity BLDA183 from case BLD01-02389.
|
Routing - PLAN CHECK | 9/21/2001 | | 10/15/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 9/28/2001 | | 10/15/2001 | | DONE |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | 9/28/2001 | | PEND |
|
|
|
started plan review. engineered foundation plans and designer plans do not match. not all holdowns are indicated and locations of ones shown are not clear to exact location. have call bob at pinnacle. he will contact designer and contractor.
|
Plans ACCEPTED BY PLAN CHECK | | | 9/28/2001 | | |
|
|
|
|
Routing - FIRE | 9/25/2001 | | 9/25/2001 | | DONE |
|
|
|
Fire sprinklers required per Dave Miller. Memo on file with Dan Overy: S. Rogers 9/25/01 13:40.
|
Routing - PLANNING | 9/14/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/29/2001 | | 9/14/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to plans.
|
Routing - PUBLIC WORKS | 9/14/2001 | | 9/14/2001 | | DONE |
|
|
|
|
Application received | | | 8/29/2001 | | |
|
|
|
|