Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-02399
StatusFinaled
Name TREASURE VALLEY BIBILE CHURCH
Site Address 12251 W USTICK RD
Project NameTREASURE VALLEY BIBLE CHURCH
Customer Number 
ePlanReviewNo
Description
TREASURE VALLEY BIBLE CHURCH - To construct a new 30,522 sq. ft. one story, fully fire sprinklered church with classrooms, gym and offices. Building will have a two hour area separation wall with two types of construction. Gym and sanctuary will be Type II-1hr with remainder being Type V-1hr. Fire sprinklers shall be used for substitution of one-hour construction. One hour exit passage ways shall be provided on each side of the sanctuary for the side exits. All work is per approved plans and attachments. CUP01-0053
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/10/20037/10/20037/10/2003 DONE
Additional values from subcontractors.
Case Summary (BLD)  11/13/2002  
Permanent occupancy  10/3/2002 DONE
Perm. Occ. Cert. #9389 issued 10-3-02 to Treasure Valley Bible Church by AML.
BLD-Final10/1/200210/2/200210/2/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/01/2002 at 10:58:06. Contact: ###-####. ok for perm occ. 10/2/2002 3:46:22 PM
Permanent Occupancy 10/2/200210/2/2002 DONE
Details
FIRE-Final Inspection9/27/20029/30/20029/30/2002APASS
DetailsTroy Cobbley
fire life/safety finaled 9/30/2002 11:16:21 AM
BLD-Final9/27/20029/30/20029/30/2002PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/27/2002 at 11:50:35. Contact: ###-####.
FIRE-Final Inspection9/26/20029/26/20029/26/2002PFAIL
DetailsTroy Cobbley
paint curbing as discussed, paint parking stall in front of the fire hydrant, provide emergency lighting in sanctuary as per the UBC and provide two "fire lane-park in marked stalls only" signs at the entrances to the property 9/26/2002 2:59:29 PM
Code Occupancy Approval  9/24/2002 PASS
PHASE I -complies with CUP01-0053
BLD-Conference9/18/20029/18/20029/18/2002PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/18/2002 at 11:16:55. Contact: ###-####. discussion on min requirements for finished space 9/19/2002 9:29:55 AM
BLD-Conference9/13/20029/16/20029/16/2002ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/13/2002 at 11:44:13. Contact: ###-####. need to have the permit rewriten to show what areas are to be left unfinshed 9/16/2002 12:06:42 PM
BLD-Other7/30/20027/30/20027/30/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/30/2002 at 07:19:15. Contact: ###-####.ok but need fire rating data on panels fo exit passege ways 7/30/2002 2:37:46 PM
BLD-Conference6/7/20026/10/20026/10/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/07/2002 at 08:04:19. Contact: ###-####.Talked with contractor about a ladder acces to projector, told him to contact the architect about relocation of this as , I would not accept the new location. due to clearance problems. 6/10/2002 11:33:27 AM
BLD-Energy code compliance5/20/20025/21/20025/21/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/20/2002 at 09:05:50. Contact: ###-####. partial insulation inspection south wing 90 % complete, Note: no commercial energy code addopted by Boise City. 5/21/2002 10:24:09 AM
BLD-Framing/Rough-in5/16/20025/17/20025/17/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/16/2002 at 08:36:00. Contact: ###-####.south office area ok to insulate 5/17/2002 10:54:47 AM
BLD-Energy code compliance5/8/20025/9/20025/9/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/08/2002 at 09:25:53. Contact: ###-####.north office area ok to cover walls 5/9/2002 8:53:04 AM
BLD-Framing/Rough-in5/6/20025/7/20025/7/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/06/2002 at 11:19:24. Contact: ###-####. shear at front entry roof sheeting front entry framing onnorth and front entry ok 5/7/2002 12:06:14 PM
BLD-Framing/Rough-in4/26/20024/29/20024/29/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/26/2002 at 13:31:09. Contact: ###-####. ext shear and partial roof nailing ok 4/29/2002 9:19:09 AM
BLD-Framing/Rough-in4/17/20024/18/20024/18/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/17/2002 at 09:29:39. Contact: ###-####. Roof deck nailing at north area, nailing ok from roof access to west exteior wall, note used alternate staples as shown on plans, no exterior wall inspection at this time, Also this building is non-rated construction due to fire sprinklers. 4/18/2002 11:12:42 AM
BLD-Footing4/9/20024/10/20024/10/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/09/2002 at 16:40:34. Contact: ###-####. pending spec insp 4/10/2002 9:46:10 AM
BLD-Footing2/21/20022/22/20022/22/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/21/2002 at 14:36:16. Contact: ###-####.tilt up panels sign off by mti 2/22/2002 2:03:48 PM
BLD-Footing2/18/20022/19/20022/19/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/18/2002 at 09:43:47. Contact: ###-####. OK pend MTI report and appr. 2/19/2002 12:44:41 PM
BLD-Footing2/12/20022/13/20022/13/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/12/2002 at 16:11:55. Contact: ###-####. tilt up panels checked bar with project super mti will also inspect and test concrete 2/13/2002 3:45:47 PM
BLD-Footing2/4/20022/5/20022/5/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/04/2002 at 12:32:56. Contact: ###-####. mti doing spec inspection 2/5/2002 9:22:50 AM
BLD-Footing1/31/20022/1/20022/1/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/31/2002 at 11:51:30. Contact: ###-####. work was inspected by mti 2/1/2002 11:12:51 AM
BLD-Footing1/23/20021/24/20021/24/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/23/2002 at 13:36:55. Contact: ###-####.
BLD-Footing1/21/20021/22/20021/22/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/21/2002 at 12:58:54. Contact: ###-####. mti has done inspection and pulled concrete sample 1/23/2002 9:08:14 AM
BLD-Footing1/16/20021/17/20021/17/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/16/2002 at 13:15:06. Contact: ###-####. mti on site they have inspected the rebar and are testing thwe concrete all ok 1/18/2002 9:04:09 AM
(F) Reprint permit  1/3/2002 DONE
(F) Reprint permit  1/3/2002 DONE
(F) Reprint permit  1/2/2002 DONE
(F) Reprint permit  12/27/2001  
Issue PAID IN FULL permit  12/26/2001 DONE
Print Occupancy Form  12/24/2001 DONE
Inspection Record Card- Bld  12/24/2001 DONE
Telephone call  12/24/2001 DONE
permit ready and need ACHD
Routing - FIRE12/19/2001 12/21/2001 PASS
SUBJECT TO RELOCATING FDC
Routing - PUBLIC WORKS12/21/2001 12/21/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/21/2001 DONE
Plan assigned to (MLO)8/30/2001 12/21/2001 PASS
DetailsMike Otto
12/21/2001 16:20:28 MLO - activity updated through activity BLDA022 from case BLD01-02399.
Routing - PLANNING12/13/2001 12/17/2001 PASS
Approved as per CUP01-00138
Routing - PUBLIC WORKS12/11/2001 12/13/2001 FAIL
Requires street light plan.
Routing - PLAN CHECK12/10/2001 12/11/2001 PASS
Plan resubmittals received  12/10/2001 DONE
Received three sets of resubmittal sheet P1.2. Routed to Mike Otto.
Plan resubmittals received  12/4/2001 DONE
Received six sets of resubmittal sheets A0.0, A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A3.0, A4.0, A.50, A5.1, A5.2, A6.0, A7.30, S2.0, S2.1, S3.0, P1.0, P1.1, P1.3, p2.0, M0.0, M1.0, M1.1, E-1, E-2, E-3, E-5, E-6, TO INCLUDE RESPONSE LETTER. Routed to Mike Otto.
Routing Off Site - STRUCTURAL11/1/2001 11/24/2001 PASS
Plans are incomplete do not include added square footage. Reviewing engineer notified. MLO
Plan resubmittals received  11/13/2001 DONE
Received six copies of resubmittal sheets S-2.0, S-3.0, and supplemental structural calculation sheets. Routed to Mike Otto.
Routing Off Site - STRUCTURAL11/13/2001 11/13/2001 DONE
contacted PDQ to take plans to outside eng.
Routing - PLAN CHECK10/29/2001 11/8/2001 FAIL
corrections sent to architect
Plan resubmittals requested  11/8/2001 DONE
UBC corrections and structural plans and calcs needed for additional area
Plan resubmittals received  10/26/2001 DONE
Received three copies of revised sheetsA-0.0, A1.0, A-2.0, A-2.1, A-2.2, A-2.3, A-2.4, A-3.0, A-4.0, A-5.0, A-5.1, A-6.0, A-7.0, A-7.1, SP-1.0,C1 C2 C3 C4 C5 C6 C7 C8 S-1.0, S-2.0, S-2.1, S-3.0, S-4.0, S-5.0, S-5.1, S-6.0, S-6.1, S-7.0, M1.0, M1.1 P1.0. P1.1 P1.2 P1.3, SE-1, E-1, E-2, E-3, E-4, E-5, E-6, ITEMIZED RESPONSE TO CITY REVIEW, AND STRUCTURAL CALCS. ROUTED TO MIKE O. KMM
Plan Review Completed(1st rev)  10/1/2001 FAIL
Routing - FIRE9/27/2001 10/1/2001 FAIL
hydrant/fdc arangement
Routing Off Site - STRUCTURAL8/30/2001 9/27/2001 FAIL
9-13-01 received call from engineer that plans are incomplete. No architectural drawings were included and review cannot be completed without. Architect contacted. MLO Contacted pdq to take plans to outside eng. KMM
Routing - PLAN CHECK9/17/2001 9/27/2001 FAIL
corrections faxed and mailed to architect
Plan resubmittals requested  9/27/2001 FAIL
UBC and structural corrections from outside engineering
Routing - PLUMBING9/10/2001 9/17/2001 PASS
PROVIDE A VENT DOWNSTREAM OF INTERCEPTOR DIP TUBE, PROVIDE A C.O. AT THE UPPER END OF THE 4" RUN IN ROOM 143, IF AN AUTOMATIC SOAP DISPENSOR IS INSTALLED AT THE MOP SINK, PROVIDE A WATER SUPPLY FOR IT, ADDITIONAL CROSS CONNECTION PROTECTION MAY BE REQUIRED, 24" MIN. COVER REQUIRED ON EXTERIOR ROOF DRAINAGE, PROTECT R.D. PIPING IN ATTIC SPACE FROM FREEZING.
Plan resubmittals received  9/13/2001 DONE
Received one copy of plans to send to outside eng. for arch. sheets. KMM
Routing Off Site - STRUCTURAL9/13/2001 9/13/2001 DONE
contacted PDQ to take plans to outside eng. for Arch. sheets. KMM
Routing - PLANNING9/6/2001 9/10/2001 FAIL
CUP01-00053 requires a minimum of 7 handicap parking spaces. Site plan only shows 4 spaces. Need revised site plan.
Routing - PUBLIC WORKS8/30/2001 9/6/2001 FAIL
Requires street light plan per Bill Colson and drainage plan revisions per Brian M. KMM
Plan resubmittals received  9/6/2001 DONE
Received 2 revised sheets of P1.0 and letter from United Water and put with plans
Application received  8/30/2001  
Plans ACCEPTED BY PLAN TECH  8/30/2001 PEND
Requires two copies of stamped and signed sheet P1.0. Contacted Gene Bennett of this need. KMM
Received Certificate of Value  8/30/2001 DONE
Plan routing begun/NEW & ADDTN  8/30/2001