(F) Reprint permit | | | 8/7/2002 | | DONE |
|
|
|
|
Fee Review-notes | 8/30/2001 | 8/30/2001 | 7/5/2002 | | DONE |
|
|
|
7/5/02-left mesg. with eric to call me back/called me back & I faxed cert. to him @ ###-####
|
Permanent Occupancy | | 6/4/2002 | 6/4/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PASS |
Jim Storey
|
|
|
###-#### final ok 6/4/2002 10:33:29 AM
|
Permanent occupancy UNPAID FEE | | | 6/4/2002 | | DONE |
|
|
|
Perm. Occ. Cert.#9156 issued to Desert Rain Car Wash 6/4/02 aml
|
BLD-Framing/Rough-in | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | PASS |
Jim Storey
|
|
|
###-#### SCOTT c/n made ok. 5/30/2002 1:47:12 PM
|
BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | FAIL |
Jim Sly
|
|
|
fr insp- tom- ###-#### C/N Secure draftstops, Lateral brace trusses (not sheathed), support 2x8 rafter (overbuild), Add nut to bolt (saddle). 5/28/2002 4:23:54 PM
|
Routing - PUBLIC WORKS | 5/28/2002 | 5/28/2002 | 5/28/2002 | | PASS |
|
|
|
ROUTED RESUBMITTALS OF 5/21/02 TO PUBLIC WORKS, PER BILL V.
|
Override - Parcel Holds | | | 5/28/2002 | | |
|
|
|
|
Plan resubmittals received | | | 5/21/2002 | | DONE |
|
|
|
Received three copies of revised M-2 sheet. Routed to Alan H. kmm
1. 5/28/02 Routed (1) copy to Alan H., Routed (1) copy to records.dkl
|
BLD-Framing/Rough-in | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PART |
Jim Storey
|
|
|
a-35s 48 " oc at center drag strut/draft stop1. (Fire blocks and draft stops) In combustible construction, fireblocking and draftstopping shall be installed to cut off all concealed draft openings (both vertical and horizontal) and shall form an effective barrier between floors, between a top story and a roof or attic space, and shall subdivide attic spaces, concealed roof spaces and floor-ceiling assemblies. The integrity of all fire blocks and draft stops shall be maintanined. (1997 UBC 708.1)
2. DRAFT STOPS - When there is usable space above and below the concealed space of a floor-ceiling assembly in a single-family dwelling, draft stops shall be installed so that the area of the concealed space does not exceed 1,000 square feet. Draftstopping shall divide the concealed space into approximately equal areas. (1997 UBC 708.3.1.1.1) Draftstopping materials shall not be less than 1/2-inch gypsum board, 3/8-inch wood structural panel or other approved materials adequately supported. Openings in the partitions shall be protected by self-closing doors with automatic latches constructed as required for the partitions. Ventilation of concealed roof spaces shall be maintained. (1997 UBC 708.3.1.3)
|
BLD-Foundation | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | PASS |
Jim Storey
|
|
|
GROUT INSP ###-####- SCOTT toped out bar ok. pending special inspection report. 3/19/2002 8:39:57 AM
|
BLD-Foundation | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PART |
Jim Storey
|
|
|
###-#### SCOTT top out pending special insp report. 3/15/2002 1:50:49 PM
|
BLD-Foundation | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PASS |
Jim Storey
|
|
|
found- ###-#### -scott 4 8 ft bar ok 3/14/2002 10:51:24 AM
|
BLD-Framing/Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Jim Storey
|
|
|
###-#### SCOTT special insp. report pending. 3/12/2002 3:30:13 PM
|
BLD-Foundation | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PART |
Jim Storey
|
|
|
found wall scott ###-#### rebar ok to 8 ft level east half. 3/6/2002 2:49:06 PM
|
BLD-Concrete | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Jim Storey
|
|
|
###-#### SCOTT 8 ft lift rebar ok. 3/5/2002 10:59:48 AM
|
BLD-Concrete | 3/1/2002 | 3/4/2002 | 3/4/2002 | A | PART |
Jim Storey
|
|
|
scott ###-#### rebar ok first 48 inch lift. 3/4/2002 3:14:41 PM
|
Plan Reviewer's activity | | | 2/5/2002 | | |
|
|
|
Architect of record changed to Dale Binning
|
Plan resubmittals received | | | 1/23/2002 | | DONE |
|
|
|
Received two copies of revised struct. calcs. and one copy of letter from Eric Wolfe. Put one with the plans in the records dept. Routed other copy to Jim Storey. KMM
|
BLD-Foundation | 12/19/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Steven Webb
|
|
|
###-#### SCOTT
|
BLD-Footing | 12/14/2001 | 12/17/2001 | 12/17/2001 | P | PASS |
Jim Storey
|
|
|
250-.3472 OR ###-#### CALL FIRST 15 TO 20 MIN. ft ok 12/17/2001 4:35:39 PM
|
BLD-Footing | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | FAIL |
Jim Storey
|
|
|
###-#### ground not protected 2 inches snow and ground frozen . 12/13/2001 9:48:33 AM
|
(F) Reprint permit | | | 12/13/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/27/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2001 | | DONE |
|
|
|
talked to eric to verify plans are ready & need something from the a.c.h.d./mls
|
Routing - PLAN CHECK | 11/13/2001 | | 11/16/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/16/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 10/3/2001 | | 11/16/2001 | | PASS |
Mike Phillips
|
|
|
11/16/2001 13:28:33 M_P - activity updated through activity BLDA022 from case BLD01-02401.
|
Plan resubmittals received | | | 11/14/2001 | | DONE |
|
|
|
Received two copies of revised sheets A-3, A-4, A-6, A-7, A-8, routed to Mike P. KMM
|
Routing - PLANNING | 11/7/2001 | | 11/13/2001 | | PASS |
|
|
|
Approved per CUP00-31 and DRH00-135 and DRH01-114.
|
Plan resubmittals received | | | 11/8/2001 | | DONE |
|
|
|
Received two copies of L-1 and a copy of the cross access easement. Routed to Marty for his use. We have the same set of L-1 sheet already in our set of plans. kmm
|
Routing - PUBLIC WORKS | 11/5/2001 | | 11/7/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/31/2001 | | 11/5/2001 | | |
|
|
|
|
Plan resubmittals received | | | 11/5/2001 | | DONE |
|
|
|
Received revised certificate of value.
|
Routing - PLUMBING | 10/30/2001 | | 10/31/2001 | | PASS |
|
|
|
a vent will be required on the discharge side of all interceptors, list all piping and outlets, CAUTION: Nonpotable water, DO NOT DRINK.
|
Routing - PLAN CHECK | 10/9/2001 | | 10/30/2001 | | |
|
|
|
|
Plan resubmittals received | | | 10/30/2001 | | DONE |
|
|
|
Received five copies of revised sewer plan, equipment room sheets M-2 and M-3. Two copies of the sewer connection on the site plan, sheet A-1. Five copies of Boise Vault Inc. information concerning the 1000 gal. and 1500 gal. sand & grease interceptors. One copy of cover letter. Put two copies with grading permit. Have asked for two additional A-1 and L-1 sheets to go with this permit. Routed all others to Mike P. KMM
|
Routing - PUBLIC WORKS | 10/30/2001 | | 10/30/2001 | | FAIL |
|
|
|
Requires geotech report. kmm
|
Routing - FIRE | 10/4/2001 | | 10/9/2001 | | PASS |
|
|
|
approved without written comment
|
Routing - PLAN CHECK | 10/3/2001 | | 10/4/2001 | | FAIL |
|
|
|
Plan review completed. Sent correction report requesting additional information for a further review.
9/25/01 PW is ready for re-review, when you are done with plan review. kmm
|
Routing - PLUMBING | 9/28/2001 | | 10/3/2001 | | FAIL |
|
|
|
|
Plan assigned to (JCM) | 9/5/2001 | | 10/3/2001 | | |
John Menard
|
|
|
Assigned to Mike Phillips. JCM
|
Routing - PLANNING | 9/19/2001 | | 9/28/2001 | | FAIL |
|
|
|
Plans do not comply with Design Review conditions of approval.
|
Routing - PUBLIC WORKS | 9/11/2001 | | 9/17/2001 | | FAIL |
|
|
|
Requires 1. Proof of legal land division Per AEM
2. Provide sewer plans showing connection to sewer in federal way. JJ
3. requires drainage plan and geotech report. BM
9/25/01 submitted fax on land division issue. See land division folder 2001. AEM
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2001 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/11/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/31/2001 | | HOLD |
|
|
|
Requries 1. 0&M manual
|
Received Certificate of Value | | | 8/30/2001 | | DONE |
|
|
|
|
Application received | | | 8/30/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2001 | | |
|
|
|
|