DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  8/7/2002 DONE
Fee Review-notes8/30/20018/30/20017/5/2002 DONE
7/5/02-left mesg. with eric to call me back/called me back & I faxed cert. to him @ ###-####
Permanent Occupancy 6/4/20026/4/2002 DONE
Details
FIRE-Final Inspection6/3/20026/4/20026/4/2002APASS
DetailsRick Jackson
###-####
BLD-Final6/3/20026/4/20026/4/2002APASS
DetailsJim Storey
###-#### final ok 6/4/2002 10:33:29 AM
Permanent occupancy UNPAID FEE  6/4/2002 DONE
Perm. Occ. Cert.#9156 issued to Desert Rain Car Wash 6/4/02 aml
BLD-Framing/Rough-in5/29/20025/30/20025/30/2002APASS
DetailsJim Storey
###-#### SCOTT c/n made ok. 5/30/2002 1:47:12 PM
BLD-Framing/Rough-in5/28/20025/28/20025/28/2002PFAIL
DetailsJim Sly
fr insp- tom- ###-#### C/N Secure draftstops, Lateral brace trusses (not sheathed), support 2x8 rafter (overbuild), Add nut to bolt (saddle). 5/28/2002 4:23:54 PM
Routing - PUBLIC WORKS5/28/20025/28/20025/28/2002 PASS
ROUTED RESUBMITTALS OF 5/21/02 TO PUBLIC WORKS, PER BILL V.
Override - Parcel Holds  5/28/2002  
Plan resubmittals received  5/21/2002 DONE
Received three copies of revised M-2 sheet. Routed to Alan H. kmm
1. 5/28/02 Routed (1) copy to Alan H., Routed (1) copy to records.dkl
BLD-Framing/Rough-in4/5/20024/8/20024/8/2002APART
DetailsJim Storey
a-35s 48 " oc at center drag strut/draft stop1. (Fire blocks and draft stops) In combustible construction, fireblocking and draftstopping shall be installed to cut off all concealed draft openings (both vertical and horizontal) and shall form an effective barrier between floors, between a top story and a roof or attic space, and shall subdivide attic spaces, concealed roof spaces and floor-ceiling assemblies. The integrity of all fire blocks and draft stops shall be maintanined. (1997 UBC 708.1)

2. DRAFT STOPS - When there is usable space above and below the concealed space of a floor-ceiling assembly in a single-family dwelling, draft stops shall be installed so that the area of the concealed space does not exceed 1,000 square feet. Draftstopping shall divide the concealed space into approximately equal areas. (1997 UBC 708.3.1.1.1) Draftstopping materials shall not be less than 1/2-inch gypsum board, 3/8-inch wood structural panel or other approved materials adequately supported. Openings in the partitions shall be protected by self-closing doors with automatic latches constructed as required for the partitions. Ventilation of concealed roof spaces shall be maintained. (1997 UBC 708.3.1.3)
BLD-Foundation3/18/20023/19/20023/19/2002APASS
DetailsJim Storey
GROUT INSP ###-####- SCOTT toped out bar ok. pending special inspection report. 3/19/2002 8:39:57 AM
BLD-Foundation3/14/20023/15/20023/15/2002APART
DetailsJim Storey
###-#### SCOTT top out pending special insp report. 3/15/2002 1:50:49 PM
BLD-Foundation3/13/20023/14/20023/14/2002APASS
DetailsJim Storey
found- ###-#### -scott 4 8 ft bar ok 3/14/2002 10:51:24 AM
BLD-Framing/Rough-in3/12/20023/12/20023/12/2002PPART
DetailsJim Storey
###-#### SCOTT special insp. report pending. 3/12/2002 3:30:13 PM
BLD-Foundation3/6/20023/6/20023/6/2002PPART
DetailsJim Storey
found wall scott ###-#### rebar ok to 8 ft level east half. 3/6/2002 2:49:06 PM
BLD-Concrete3/4/20023/5/20023/5/2002APART
DetailsJim Storey
###-#### SCOTT 8 ft lift rebar ok. 3/5/2002 10:59:48 AM
BLD-Concrete3/1/20023/4/20023/4/2002APART
DetailsJim Storey
scott ###-#### rebar ok first 48 inch lift. 3/4/2002 3:14:41 PM
Plan Reviewer's activity  2/5/2002  
Architect of record changed to Dale Binning
Plan resubmittals received  1/23/2002 DONE
Received two copies of revised struct. calcs. and one copy of letter from Eric Wolfe. Put one with the plans in the records dept. Routed other copy to Jim Storey. KMM
BLD-Foundation12/19/200112/21/200112/21/2001APASS
DetailsSteven Webb
###-#### SCOTT
BLD-Footing12/14/200112/17/200112/17/2001PPASS
DetailsJim Storey
250-.3472 OR ###-#### CALL FIRST 15 TO 20 MIN. ft ok 12/17/2001 4:35:39 PM
BLD-Footing12/12/200112/13/200112/13/2001AFAIL
DetailsJim Storey
###-#### ground not protected 2 inches snow and ground frozen . 12/13/2001 9:48:33 AM
(F) Reprint permit  12/13/2001  
Issue PAID IN FULL permit  12/12/2001 DONE
Inspection Record Card- Bld  11/27/2001 DONE
Inspection Record Card- Bld  11/19/2001 DONE
Print Occupancy Form  11/19/2001 DONE
Telephone call  11/19/2001 DONE
talked to eric to verify plans are ready & need something from the a.c.h.d./mls
Routing - PLAN CHECK11/13/2001 11/16/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/16/2001 DONE
Print Pending Permit.LaserJet4  11/16/2001 DONE
Plan assigned to (M_P)10/3/2001 11/16/2001 PASS
DetailsMike Phillips
11/16/2001 13:28:33 M_P - activity updated through activity BLDA022 from case BLD01-02401.
Plan resubmittals received  11/14/2001 DONE
Received two copies of revised sheets A-3, A-4, A-6, A-7, A-8, routed to Mike P. KMM
Routing - PLANNING11/7/2001 11/13/2001 PASS
Approved per CUP00-31 and DRH00-135 and DRH01-114.
Plan resubmittals received  11/8/2001 DONE
Received two copies of L-1 and a copy of the cross access easement. Routed to Marty for his use. We have the same set of L-1 sheet already in our set of plans. kmm
Routing - PUBLIC WORKS11/5/2001 11/7/2001 PASS
Routing - PLAN CHECK10/31/2001 11/5/2001  
Plan resubmittals received  11/5/2001 DONE
Received revised certificate of value.
Routing - PLUMBING10/30/2001 10/31/2001 PASS
a vent will be required on the discharge side of all interceptors, list all piping and outlets, CAUTION: Nonpotable water, DO NOT DRINK.
Routing - PLAN CHECK10/9/2001 10/30/2001  
Plan resubmittals received  10/30/2001 DONE
Received five copies of revised sewer plan, equipment room sheets M-2 and M-3. Two copies of the sewer connection on the site plan, sheet A-1. Five copies of Boise Vault Inc. information concerning the 1000 gal. and 1500 gal. sand & grease interceptors. One copy of cover letter. Put two copies with grading permit. Have asked for two additional A-1 and L-1 sheets to go with this permit. Routed all others to Mike P. KMM
Routing - PUBLIC WORKS10/30/2001 10/30/2001 FAIL
Requires geotech report. kmm
Routing - FIRE10/4/2001 10/9/2001 PASS
approved without written comment
Routing - PLAN CHECK10/3/2001 10/4/2001 FAIL
Plan review completed. Sent correction report requesting additional information for a further review.
9/25/01 PW is ready for re-review, when you are done with plan review. kmm
Routing - PLUMBING9/28/2001 10/3/2001 FAIL
Plan assigned to (JCM)9/5/2001 10/3/2001  
DetailsJohn Menard
Assigned to Mike Phillips. JCM
Routing - PLANNING9/19/2001 9/28/2001 FAIL
Plans do not comply with Design Review conditions of approval.
Routing - PUBLIC WORKS9/11/2001 9/17/2001 FAIL
Requires 1. Proof of legal land division Per AEM
2. Provide sewer plans showing connection to sewer in federal way. JJ
3. requires drainage plan and geotech report. BM
9/25/01 submitted fax on land division issue. See land division folder 2001. AEM
Plans ACCEPTED BY PLAN TECH  9/11/2001 DONE
Plan routing begun/NEW & ADDTN  9/11/2001 DONE
Plans ACCEPTED BY PLAN TECH  8/31/2001 HOLD
Requries 1. 0&M manual
Received Certificate of Value  8/30/2001 DONE
Application received  8/30/2001  
Recd Pcfee & Taken To Pln CK  8/30/2001