BLD-Final | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### Stairs in garage still beyond allowable tolerance . 2/6/2002 10:38:31 AM
|
BLD-Final | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Steven Webb
|
|
|
allan-- ###-#### fn occ c. of c. issued 2/6/2002 2:46:46 PM
|
DOC - Permit Finaled | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 2/6/2002 2:46:52 PM
|
BLD-Final | 2/4/2002 | 2/5/2002 | 2/5/2002 | P | CANC |
Steven Webb
|
|
|
###-#### allan fn occ---cancel per betty
|
BLD-Framing/Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### alan c/n posted-need to completed guardrail at 2nd floor, remove debris from crawl, fire cuaulk penetration on 1-hr fire wall in garage and redo stairs in garage to meet code--exceeds riser height and 3/8" tolerance. 1/31/2002 3:04:29 PM
|
BLD-Aging Inspection | 1/15/2002 | 1/15/2002 | 1/15/2002 | | PASS |
Steven Webb
|
|
|
wip 1/15/2002 8:05:49 AM
|
BLD-Energy code compliance | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Steven Webb
|
|
|
###-#### Contractor provide eng. on 6" X 6" bearing, plus loading is acceptable to use 2-M.lams instead of 3. Ok to cover. 11/15/2001 1:22:18 PM
|
CHANGE STATUS TO (ISS) | | | 11/13/2001 | | DONE |
|
|
|
permit doc finaled in error.325
|
BLD-Framing/Rough-in | 11/8/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/08/2001 at 13:09:03. Contact: ###-####.
|
DOC - Permit Finaled | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 11/9/2001 3:03:22 PM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 07:47:49. Contact: ###-####. Shear--ok to side. 10/24/2001 1:28:28 PM
|
BLD-Framing/Rough-in | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 08:18:37. Contact: ###-####. c/n issued--penetration of nails in some panels is excessive, nails needed above hd, and house is addressed wrong please correct. 10/23/2001 1:29:36 PM
|
BLD-Framing/Rough-in | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 08:36:37. Contact: ###-####.
|
BLD-Foundation | 9/18/2001 | 9/18/2001 | 9/18/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 07:17:48. Contact: ###-####. I was on vacation on this day--did not perform inspection. 9/19/2001 10:21:38 AM
|
BLD-Footing | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 07:39:57. Contact: ###-####.
|
Routing - PLAN CHECK | 9/5/2001 | 9/5/2001 | 9/13/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/11/2001 | | 9/13/2001 | | PASS |
Steve Munroe
|
|
|
9/13/2001 09:03:56 SAM - activity updated through activity BLDA022 from case BLD01-02405.
|
Print Pending Permit.LaserJet4 | | | 9/13/2001 | | |
|
|
|
|
Plan Review Report | | | 9/13/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/13/2001 | | DONE |
|
|
|
Only one set is being approved due to excessive red-lining.
|
Inspection Record Card- Bld | | | 9/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/13/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/13/2001 | | DONE |
|
|
|
|
Pending Assignment by DJO | 8/30/2001 | | 9/11/2001 | | DONE |
Dan Overy
|
|
|
9/11/2001 13:28:54 SAM - activity updated through activity BLDA183 from case BLD01-02405.
|
Routing - PLANNING | 8/30/2001 | 8/30/2001 | 9/5/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/30/2001 | 8/30/2001 | 9/5/2001 | | DONE |
|
|
|
|
Application received | | | 8/30/2001 | | |
|
|
|
|