BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | NR |
Dave Hannah
|
|
|
###-#### still needs elec final 1/4/2002 10:50:25 AM
|
BLD-Final | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/4/2002 2:01:28 PM c.c #20982 issued
|
DOC - Permit Finaled | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 1/4/2002 2:01:46 PM
|
BLD-Final | 1/2/2002 | 1/3/2002 | 1/3/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 1/3/2002 4:02:16 PM
|
BLD-Energy code compliance | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### c/n items all completed ok to cover 11/30/2001 10:51:59 AM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/28/2001 | 11/28/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### tony c/nb on site ok to insulate 11/28/2001 1:25:14 PM
|
BLD-Framing/Rough-in | 11/26/2001 | 11/27/2001 | 11/27/2001 | P | FAIL |
Dave Hannah
|
|
|
TONY ###-#### c/n on site 11/27/2001 2:33:46 PM
|
BLD-Framing/Rough-in | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | PART |
Russ Owen
|
|
|
###-#### TONY SHEER WALL (PRINTS ARE UNDERNEATH STAIRS IN BASEMENT). Ok to side .plan review has drawn 2 hd,s at right side of entry north perpendicular wall, that are not installed. The attached engineering does not appear to require them , need to verify with engineer 11/9/2001 10:06:32 AM
|
BLD-Foundation | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PART |
Dave Hannah
|
|
|
###-#### work in progress 10/5/2001 10:08:10 AM
|
Issue PAID IN FULL permit | | | 10/3/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/31/2001 | 8/31/2001 | 10/2/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/11/2001 | | 10/2/2001 | | PASS |
Steve Munroe
|
|
|
10/2/2001 07:26:45 SAM - activity updated through activity BLDA022 from case BLD01-02406.
|
Print Pending Permit.LaserJet4 | | | 10/2/2001 | | |
|
|
|
|
Plan Review Report | | | 10/2/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/2/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/2/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/24/2001 | | PEND |
|
|
|
9/24/01 I heard from Mike and let him know what I had questions on. He said he would get me the engineering. I told him I would call him back after I had a chance to review the plans again. 11:20 I called him back and he told me he is using a girder truss to carry the wall and roof above. He will bring in the engineering later.
|
Plan Reviewer's activity | | | 9/11/2001 | | PEND |
|
|
|
9/11/01 13:07 I called and left a message with someone in the office to have Mike call me. I have question on engineering for gravity and lateral at the entry and what is carrying the second floor wall near the entry.
|
Pending Assignment by DJO | 8/30/2001 | | 9/11/2001 | | DONE |
Dan Overy
|
|
|
9/11/2001 08:26:54 SAM - activity updated through activity BLDA183 from case BLD01-02406.
|
Routing - PLANNING | 8/30/2001 | 8/30/2001 | 8/31/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/30/2001 | 8/30/2001 | 8/31/2001 | | DONE |
|
|
|
|
Application received | | | 8/30/2001 | | |
|
|
|
|