Fee Review-notes | 8/31/2001 | 8/31/2001 | 7/22/2002 | | DONE |
|
|
|
|
BLD-Final | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Jim Sly
|
|
|
fn insp- todd- ###-#### OK for _erm Occ. 5/20/2002 1:38:57 PM
|
Letter of compliance | | | 5/20/2002 | | DONE |
|
|
|
Letter of Completion #22502 issued 5-20-02.
|
BLD-Final | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | NR |
Dave Hannah
|
|
|
fn occ todd- ###-#### still needs other sign offs 4/22/2002 1:41:02 PM
|
FIRE-Final Inspection | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | PASS |
Troy Cobbley
|
|
|
Life safety OK. Structural to verify sticker over exit door and lever on other exit door
|
BLD-Energy code compliance | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 08:49:09. Contact: ###-####. ti ok 3/12/2002 1:49:34 PM
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PASS |
Jim Sly
|
|
|
###-#### TODD
|
BLD-Framing/Rough-in | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Jim Sly
|
|
|
todd- shear wall --###-#### Shear OK 3/7/2002 4:45:08 PM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | PART |
Jim Sly
|
|
|
SHEER WALL ###-#### TODD East shear wall and exterior type X rock.....OK. 2/20/2002 3:29:50 PM
|
BLD-Aging Inspection | 1/30/2002 | 1/30/2002 | 1/30/2002 | | PART |
Jim Sly
|
|
|
WIP 1/30/2002 9:29:48 AM
|
BLD-Footing | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Jim Sly
|
|
|
BOB ###-####
|
(F) Reprint permit | | | 11/13/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/9/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/8/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2001 | | DONE |
|
|
|
permit ready
|
Plan assigned to (MLO) | 9/5/2001 | | 10/8/2001 | | PASS |
Mike Otto
|
|
|
10/8/2001 08:28:09 MLO - activity updated through activity BLDA022 from case BLD01-02419.
|
Routing - FIRE | 10/2/2001 | 10/5/2001 | 10/5/2001 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 9/21/2001 | | 10/1/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/20/2001 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/20/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Routing - FIRE | 9/18/2001 | | 9/20/2001 | | FAIL |
|
|
|
hydrant flow from united water
|
Plan resubmittals received | | | 9/19/2001 | | DONE |
|
|
|
Received three copies of revised sheets A-8 and A-9 and one cover letter. Routed to Mike O. KMM
|
Plan resubmittals requested | | | 9/18/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 9/17/2001 | | 9/18/2001 | | FAIL |
|
|
|
Corrections mailed and faxed to architect
Please route back to PW when plans are out of fire. Brian M. is ready to rereview. Thank you
|
Routing - PLUMBING | 9/13/2001 | | 9/17/2001 | | PASS |
|
|
|
PROVIDE ADDITIONAL CROSS SECTIONAL VENT AREA EQUAL TO 12.56".
|
Routing - PLANNING | 9/11/2001 | | 9/13/2001 | | PASS |
|
|
|
Per conditions of CUP01-00089
|
Routing - PUBLIC WORKS | 9/5/2001 | | 9/10/2001 | | FAIL |
|
|
|
Requires O&M Plan and geotech report. Per Brian M.
|
Plan routing begun/NEW & ADDTN | | | 9/5/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/5/2001 | | DONE |
|
|
|
Have asked for updated cert. of value. 9/10/01 received updated cert. of value put in file and with plans. KMM
|
Received Certificate of Value | | | 8/31/2001 | | DONE |
|
|
|
|
Application received | | | 8/31/2001 | | |
|
|
|
|