Case Summary (BLD) | | | 6/16/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 6/16/2003 | | |
|
|
|
|
BLD-Final | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Alan Hauser
|
|
|
###-####
|
DOC - Permit Finaled | 9/19/2002 | 9/19/2002 | 9/19/2002 | P | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 9/19/2002 1:30:05 PM
|
BLD-Final | 9/17/2002 | 9/18/2002 | 9/18/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### ... 9/18/2002 6:58:04 PM
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Energy code compliance | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 08:33:15. Contact: ###-####....walls ok, 2/7/2002 3:07:36 PM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 21:53:00. Contact: ###-####...c/n ok, ok to insul. 2/6/2002 5:11:25 PM
|
BLD-Conference | 2/5/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/5/2002 11:36:51 AM w/ framer re c/n...complete eng'd shear panels & fireblocks
|
BLD-Framing/Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 08:24:39. Contact: ###-####...add'l c/n ...complete fireblox, shearwall details. no insul. 2/4/2002 6:08:42 PM
|
BLD-Framing/Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 09:19:16. Contact: ###-####...no air seal, recall. complete c/n 2/1/2002 5:36:55 PM
|
BLD-Conference | 1/31/2002 | 1/31/2002 | 1/31/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/31/2002 11:11:00 AM w/ bldr ...complete int shear after ins insp.
|
BLD-Framing/Rough-in | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 11:11:06. Contact: ###-####. c/n long list.do not insulate. 1/30/2002 3:23:03 PM
|
BLD-Other | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 07:45:39. Contact: ###-####. ok to side 1/22/2002 10:43:29 AM
|
BLD-Other | 1/16/2002 | 1/17/2002 | 1/17/2002 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 13:50:21. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/17/2002 at 08:19:29.
|
BLD-Other | 1/15/2002 | 1/15/2002 | 1/15/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 06:40:50. Contact: ###-####....s.w's not as eng'd...need underfloor hd's and sheathing, mst straps to 2nd fl, etc. 1/15/2002 1:18:30 PM
|
BLD-Footing | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PART |
Carl Dependahl
|
|
|
ben ###-#### perim ftgs ok, need 2 sections nt shear wall footings to have bar added (as per simpson) 10/3/2001 10:24:56 AM
|
Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/21/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 9/13/2001 | 9/13/2001 | 9/20/2001 | | PASS |
Dan Overy
|
|
|
9/20/2001 16:43:37 DJO - activity updated through activity BLDA022 from case BLD01-02425.
|
Plan Reviewer's activity | | | 9/20/2001 | | DONE |
|
|
|
revised plans submitted. ok to issue as master file plan.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/20/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 9/20/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/13/2001 | | PEND |
|
|
|
plans have been submitted as master files. as drawn not enough information is indicated to complete. have called Ted Boyer to pick up plans and modify.
|
Plans ACCEPTED BY PLAN CHECK | | | 9/13/2001 | | |
|
|
|
|
Routing - PLANNING | 9/4/2001 | 9/4/2001 | 9/5/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/4/2001 | 9/4/2001 | 9/5/2001 | | DONE |
|
|
|
|
Application received | | | 9/4/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 9/5/2001 | 9/5/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 9/4/2001 | | | | PEND |
Dan Overy
|
|
|
|