Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02437
StatusFinaled
Name HILL STEVEN A
Site Address 2403 S ANNETT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 1107s.f. to an existing 831s.f. single family dwelling. work to include new bedrooms, bathrooms, great room and remodel of the existing structure, including the replacement of the existing roof structure as a 2nd phase all included in this permit. Smoke detectors per UBC 310.9 are required throughout. R-1C setbacks ok per ajb All per the approved plans as marked. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval11/8/200411/8/200411/8/2004PPASS
DetailsJim Storey
Susan; Phone #: ###-#### Internet Inspection Request from: Jan Rice
DOC - Permit Finaled11/8/200411/8/200411/8/2004PPASS
DetailsJim Storey
Finaled by inspector at 11/8/2004 3:05:29 PM
BLD-Framing/Rough-in5/24/20045/24/20045/24/2004PPASS
DetailsTroy James
steven; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in5/12/20045/13/20045/13/2004AFAIL
DetailsTroy James
please call for access////steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need seal package completed. Ok to insulate walls and sheetrock ceiling per request from owner. 5/13/2004 9:42:53 AM
BLD - Request for Extension11/5/200311/6/200311/6/2003APASS
DetailsJim Storey
steve ###-####
PostCard Mailed  11/5/2003 SENT
PostCard has been mailed requesting inspection.
CHANGE STATUS TO (ISS)  10/6/2003 DONE
ok per george s. to put this permit back to the issue mode///dld
BLD-Final2/12/20032/12/20032/12/2003PPART
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung first phase ok for occ. wip for 2 nd phase per approved plan and scope of work on permit. 2/12/2003 5:47:17 PM
BLD-Conference12/9/200212/10/200212/10/2002APASS
DetailsJim Storey
CONF TO EXTEND PERMIT STEVE ###-#### job almost complet extend for 180 days approved. 12/10/2002 10:17:25 AM
PostCard Mailed  12/6/2002 SENT
PostCard has been mailed requesting inspection.
BLD-Framing/Rough-in5/21/20025/21/20025/21/2002PPASS
DetailsJim Storey
STEVE ###-#### framing ok 5/21/2002 3:01:02 PM
BLD-Energy code compliance5/21/20025/21/20025/21/2002PPASS
DetailsJim Storey
BLD-Wall cover5/6/20025/6/20025/6/2002PPASS
DetailsJim Storey
###-#### STEVE
BLD-Framing/Rough-in12/13/200112/14/200112/14/2001APASS
DetailsJim Storey
###-#### ###-#### exterior brace pannels ok for cover. 12/14/2001 10:56:26 AM
BLD-Framing/Rough-in12/13/200112/14/200112/14/2001APASS
DetailsJim Storey
###-#### ###-#### exterior brace pannels ok for cover. 12/14/2001 10:56:26 AM
BLD-Footing10/24/200110/25/200110/25/2001APASS
DetailsSteven Webb
###-####
Application received  9/5/2001  
Plan assigned to (PEP)9/5/2001 9/5/2001 PASS
DetailsPerry Paine
9/5/2001 09:13:31 PEP - activity updated through activity BLDA022 from case BLD01-02437.
Inspector's copy Bld permit  9/5/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/5/2001 DONE
Inspection Record Card- Bld  9/5/2001 DONE
Issue PAID IN FULL permit  9/5/2001 DONE