BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PART |
Carl Dependahl
|
|
|
Pat ###-#### struct appears ok, need soils report/bond/p.wks ok. 3/1/2002 10:11:40 AM
|
BLD-Grading Inspection | 3/1/2002 | 3/1/2002 | 3/1/2002 | | BOND |
Rita DeYoung
|
|
|
Grading complete and approved. Downspouts must be connected. Upon receipt of a $500.00 bond the grading and drainage is conditionally approved.
|
Letter of compliance | | | 3/1/2002 | | DONE |
|
|
|
Letter of Compliance #22296 issued 3-1-02 per Carl Dependahl.
|
BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | PART |
Tony Young
|
|
|
###-####
framing matters ok, need sprinklers signed off 12/10/2001 3:47:06 PM
|
BLD-Framing/Rough-in | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | NR |
Tony Young
|
|
|
###-#### 12/5/2001 4:46:07 PM ###-#### 12/5/2001 4:46:07 PM 12/5/2001 4:46:50 PM
|
BLD-Framing/Rough-in | 12/5/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Tony Young
|
|
|
###-####
need fire sprinklers finished, engineering on front and rear wall, finish hold downs, fix trusses per specs, ok to insulate 12/6/2001 3:07:12 PM
|
BLD-Framing/Rough-in | 12/5/2001 | 12/5/2001 | 12/5/2001 | A | NR |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 12/5/2001 4:41:32 PM
|
BLD-Framing/Rough-in | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 14:48:03. Contact: ###-####. c/n on site 11/13/2001 9:52:25 AM
|
BLD-Foundation | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Tony Young
|
|
|
###-#### JARED SHEER WALL ALSO
poured 10/1/2001 4:31:43 PM
|
BLD-Footing | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | PART |
Tony Young
|
|
|
ft insp- jerrad ###-####
pending letter from soil eng. 9/28/2001 3:28:48 PM
|
Issue PAID IN FULL permit | | | 9/28/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 9/20/2001 | 9/20/2001 | 9/27/2001 | | PASS |
Dan Overy
|
|
|
9/27/2001 12:01:12 DJO - activity updated through activity BLDA022 from case BLD01-02442.
|
Plan Reviewer's activity | | | 9/27/2001 | | DONE |
|
|
|
OK TO ISSUE
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/27/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2001 | | DONE |
|
|
|
talked to pat to verify plans are ready
|
Case Summary (BLD) | | | 9/20/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 9/20/2001 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 9/19/2001 | | PEND |
|
|
|
started initial review on the 19th. plans lack complete foundation engineering and overheight wall calculations. beam locations are not correct. bearing around stair core is insufficent. roof frame in incomplete. have talked with engineer and he has faxed over calculations for tall wall red-lining on plans. interior foundation and isolated bearing pads will be addressed when contractor is informed that these items need to be taken care of. engineer will need foundatin plans. after speaking with designer, revisions and beam calcs will be faxed to this office. plans will be red lined to indicate additional bearing and re-location of beam G. have called contractor at contact number ###-#### and left message.
|
Plans ACCEPTED BY PLAN CHECK | | | 9/19/2001 | | PEND |
|
|
|
|
Routing - PLANNING | 9/13/2001 | | 9/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/10/2001 | | 9/13/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/5/2001 | 9/5/2001 | 9/10/2001 | | PASS |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 3 WITH CONDITIONS OF APPROVAL IN LETTER ATTACHED TO PLANS
|
Application received | | | 9/5/2001 | | |
|
|
|
|
Pending Assignment by DJO | 9/5/2001 | | | | PEND |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 9/14/2001 | | | | PEND |
|
|
|
|