BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Steven Webb
|
|
|
8###-#### code 7550 troy ###-#### c. of c. #22165 issued. 3/5/2002 8:37:08 AM
|
DOC - Permit Finaled | 3/5/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 3/5/2002 8:37:21 AM
|
BLD-Energy code compliance | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Steven Webb
|
|
|
###-#### ok to cover 12/21/2001 8:49:26 AM
|
BLD-Framing/Rough-in | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PART |
Steven Webb
|
|
|
###-#### randy sheer wall as well-c/n--ok to side upstairs and to insulate, draftstops needed at fir out walls in basement. 12/19/2001 10:44:00 AM
|
BLD-Framing/Rough-in | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PART |
Steven Webb
|
|
|
###-#### SHEAR-NOT FRAMING--ok to side downstairs only but re-inspection needed on up stairs shear 12/17/2001 2:13:13 PM
|
BLD-Framing/Rough-in | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### SHEAR-DO NOT COVER 12/14/2001 9:36:57 AM
|
BLD-Framing/Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | FAIL |
Jim Storey
|
|
|
SHEER WALL TROY ###-#### no plans on site no work done. 12/13/2001 10:32:57 AM
|
BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Steven Webb
|
|
|
RANDY ###-#### SHEER WALL--no approved plans on site--re-call for inspection. 12/11/2001 2:45:48 PM
|
BLD-Framing/Rough-in | 11/29/2001 | 12/3/2001 | 12/3/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### c/n issued--many items need attention prior to next inspection--do not cover--SHEAR NOT FRAMING 12/3/2001 10:41:26 AM
|
BLD-Concrete | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PART |
Steven Webb
|
|
|
###-#### MIKE SSTB anchor bolts tie in place, 75% of walls completed--no interior footings will be poured under slab in the basement at this time--this will be done at the flat work. 10/18/2001 2:43:11 PM
|
BLD-Footing | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Russ Owen
|
|
|
###-#### chris. appears ok no re-inforcement in at this time. 10/15/2001 1:33:26 PM
|
Issue PAID IN FULL permit | | | 10/8/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 9/11/2001 | 9/11/2001 | 10/4/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/3/2001 | | 10/4/2001 | | PASS |
Steve Munroe
|
|
|
10/4/2001 14:43:17 SAM - activity updated through activity BLDA022 from case BLD01-02451.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/3/2001 | | |
|
|
|
|
Plan Review Report | | | 10/3/2001 | | |
|
|
|
|
Pending Assignment by DJO | 9/6/2001 | | 10/3/2001 | | DONE |
Dan Overy
|
|
|
10/3/2001 08:34:30 SAM - activity updated through activity BLDA183 from case BLD01-02451.
|
Routing - PUBLIC WORKS | 9/6/2001 | 9/6/2001 | 9/11/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/10/2001 | | DONE |
|
|
|
Mike Carroll, Shiloh Development, sent an e-mail to M. Southard stating that he is aware that a building permit cannot be issued without the approval of Planning for an accessory dwelling unit. He also cannot get an early start. Any questions please see Marlene.
|
Routing - PLANNING | 9/6/2001 | 9/6/2001 | 9/6/2001 | | PASS |
|
|
|
This is not a duplex from Planning's standpoint. It is an accessory dwelling unit which is much different than a duplex. Please note that a condition of approval requires that either the principal or acessory dwelling unit be occupied by the property owner throughout the life of the accessory dwelling. The applicant is required to record a deed restriction with the Ada County Recorder requirng owner-occupancy of the property. Evidence of recordation of the deed restriction shall be provided to Planning Staff prior to occupancy. Contact Susan Riggs at 3736 if you have any questions.
|
Application received | | | 9/6/2001 | | |
|
|
|
|