Fee Review-notes | 9/6/2001 | 9/6/2001 | 12/16/2002 | | DONE |
|
|
|
additional value information from subs 3/11/03-call in-said they are sending payment
|
Permanent occupancy | | | 10/18/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9407 issued to the 13th Street Salon.
|
Permanent Occupancy | | 10/11/2002 | 10/11/2002 | | DONE |
|
|
|
|
BLD-Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Jim Storey
|
|
|
marty 8663539; back door open.ok for final upon p&z sign off is as per aproved plan. 7/30/2002 10:17:52 AM
|
Temporary occupancy | | | 7/30/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4841 issued 7-30-02 to the 13th St. Salon.
|
FIRE-Final Inspection | 7/26/2002 | 7/29/2002 | 7/29/2002 | A | PASS |
Rick Jackson
|
|
|
MARTY ###-####
|
BLD-Final | 7/26/2002 | 7/29/2002 | 7/29/2002 | P | NR |
Carl Dependahl
|
|
|
MARTY ###-####
|
FIRE-Final Inspection | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | FAIL |
Rick Jackson
|
|
|
MARTY ###-#### need lever hardware on restroom; door hardware for exits with exit signs; accessible entrance location on street side of building 7/26/2002 2:14:31 PM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### verify elec ok 3/28/2002 12:29:47 PM
|
BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### marty c/n on site 3/25/2002 10:48:13 AM
|
BLD-Framing/Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-#### see c/n, need verify elec. 2/4/2002 4:13:56 PM
|
BLD-Framing/Rough-in | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | NR |
Tom Arcoraci
|
|
|
MARTY ###-#### needs elec permit and insp 2/1/2002 10:50:43 AM
|
BLD-Framing/Rough-in | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | NR |
Carl Dependahl
|
|
|
MARTY ###-#### ...need verify elec approved or N.A. 2/1/2002 4:49:35 PM
|
Issue PAID IN FULL permit | | | 11/21/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/14/2001 | | 11/15/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/15/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (CJW) | 9/13/2001 | | 11/15/2001 | | PASS |
Carl Westfall
|
|
|
11/15/2001 08:08:32 CJW - activity updated through activity BLDA022 from case BLD01-02453.
|
Routing - PLANNING | 11/14/2001 | | 11/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/13/2001 | | 11/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/13/2001 | | 11/13/2001 | | PASS |
|
|
|
Brian M. needs to review. (9/21/01) Requires record of survey per April Miller. (11/13/01) Okay on land division AEM, and drainage plan revisions per Brian M. KMM
|
Routing - PLAN CHECK | 10/24/2001 | | 11/13/2001 | | |
|
|
|
Sent to Public Works (Brian Murphy) for review. Was on hold until he called for it.
|
Routing - PUBLIC WORKS | 10/23/2001 | | 10/24/2001 | | |
|
|
|
Failed second review. Requires drainage plan revisions.
|
Routing - PLAN CHECK | 10/5/2001 | | 10/23/2001 | | |
|
|
|
PW is ready to rereview. kmm
|
Routing - PUBLIC WORKS | 10/4/2001 | | 10/5/2001 | | |
|
|
|
Failed first review. Requires drainage plan revisions. Per Brian M. kmm
|
Routing - PLAN CHECK | 9/28/2001 | | 10/4/2001 | | PASS |
|
|
|
(9-28-01) Waiting for resolution of basement issues. (10-4-01) Drawings approved, with conditions, after resubmittal review..
|
Plan resubmittals received | | | 10/3/2001 | | DONE |
|
|
|
Received two copies of revised sheets SD-3, A-1, ME-1, routed to Carl W. KMM
|
Routing - FIRE | 9/27/2001 | | 9/28/2001 | | PASS |
|
|
|
approved without written comment
|
Plan Review Completed(1st rev) | | | 9/28/2001 | | |
|
|
|
Failed first UBC and Public Works review. On hold by Planning until Oct. 15.
|
Routing - PLAN CHECK | 9/25/2001 | | 9/27/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started September 27, 2001 and finished the next day. A response from the designer was required. See the conditions list. A plan review report was sent to the designer on September 27, 2001.
|
Routing - PLUMBING | 9/24/2001 | | 9/25/2001 | | PASS |
|
|
|
per plans and 97 upc
|
Routing - PLANNING | 9/21/2001 | | 9/24/2001 | | |
|
|
|
Hold for completion of CU modification. Hearing on modification scheduled for Oct. 15.
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2001 | | DONE |
|
|
|
Had Brian look at plans that were submitted. He was ok with what I was given. KMM
|
Received Certificate of Value | | | 9/6/2001 | | DONE |
|
|
|
|
Application received | | | 9/6/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2001 | | DONE |
|
|
|
|