Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | PART |
Russ Owen
|
|
|
wip. 12/7/2001 4:38:26 PM
|
Case Summary (BLD) | | | 10/4/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 10/4/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 10/4/2001 | | |
|
|
|
|
BLD-Conference | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 10/2/2001 3:37:46 PM went out with plan checker to check design of movable rolling storage racks.
|
BLD-Final | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | FAIL |
Russ Owen
|
|
|
fn ??sue ###-#### . need to clarify the attachement of the (5) fixed shelves to the concrete,appears to call out 5/16 bolts now has 1/4 bolts which are attached 9/28/2001 12:51:50 PM to to bottom cross rail not the end column. also needs fire/life safety c/n posted. 9/28/2001 12:52:34 PM
|
BLD-Final | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 9/28/2001 2:02:52 PM . Recieved call back from plan reveiw, that i made while at the site, All Racking was to be bolted to floor, As engineer had told plan revew, these were stationary not rolling racking, these racks do roll as decribed by the floor plan. There is no means over providing over turn protection to these racks, I have called the architect and left a voice message to retun my call , John Maning at ###-####. This correction of bolting with 5/16 in bolts applys to all racks. No just the stationary racks c/n for all racks. 9/28/2001 2:18:08 PM
|
Issue PAID IN FULL permit | | | 9/27/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/24/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/24/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/24/2001 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 9/14/2001 | | 9/21/2001 | | PASS |
|
|
|
9/21/2001 10:26:08 RMH - activity updated through activity BLDA022 from case BLD01-02461.
|
Routing - PLAN CHECK | 9/20/2001 | | 9/21/2001 | | PASS |
Ron Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
Ron Hill
|
|
|
|
Routing - FIRE | 9/17/2001 | 9/20/2001 | 9/20/2001 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 9/20/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/18/2001 | | PEND |
Ron Hill
|
|
|
Plans passed in building plan review, Routed to fire department for review, 9/18/01 Permit pending fire departments reveiw and approval.
|
Case Summary (BLD) | | | 9/18/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 9/18/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2001 | | 9/17/2001 | | PEND |
Ron Hill
|
|
|
Routed plans to fire department for review, permit pending fire department approval.
|
Plans ACCEPTED BY PLAN TECH | | | 9/10/2001 | | DONE |
|
|
|
Engineering done for zone 4 by Id. Ok per Marlene. kmm
|
Received Certificate of Value | | | 9/7/2001 | | DONE |
|
|
|
|
Application received | | | 9/7/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2001 | | DONE |
|
|
|
|
Fee Review-notes | 9/7/2001 | 9/7/2001 | | | |
|
|
|
|