Case Summary (BLD) | | | 7/29/2004 | | DONE |
|
|
|
|
Fee Review-notes | 9/7/2001 | 9/7/2001 | 6/28/2002 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 1/8/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #8984 issued 1-8-01 to the Asia Market.
|
BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### CDHD will call in ok for perm occ mec per was for smoke det in duct work no plumbing done on this project ok for perm occ. 12/28/2001 1:32:51 PM
|
Permanent Occupancy | | 12/28/2001 | 12/28/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/21/2001 | 12/24/2001 | 12/24/2001 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 12/24/2001 12:37:46 PM
|
BLD-Final | 12/21/2001 | 12/24/2001 | 12/24/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### needs CDHD SIGN OFF needs handycap sign at restroom needs to fix exit door at front 12/24/2001 12:35:59 PM
|
FIRE-Final Inspection | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | CANC |
Rick Jackson
|
|
|
###-####-----------------------cancel per dennis
|
BLD-Final | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | CANC |
Dave Hannah
|
|
|
###-#### late pm--per dennis cancel.
|
FIRE-Final Inspection | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | FAIL |
Troy Cobbley
|
|
|
Provide correct door hardware on all doors which includes the removal of the thumbturn locks, provide fire extinguisher, replace painted sprinkler head near restroom, provide verification of sprinkler monitoring if required, provide hvac verification (less than 2000cfm) 12/19/2001 2:32:00 PM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PASS |
Dave Hannah
|
|
|
fr dennis- ###-####
|
Telephone call | | | 12/6/2001 | | DONE |
|
|
|
talked to eileen to verify plans are ready
|
Issue PAID IN FULL permit | | | 10/25/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/23/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/3/2001 | | 10/23/2001 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
Plan assigned to (CJW) | 9/21/2001 | | 10/23/2001 | | PASS |
Carl Westfall
|
|
|
10/23/01 11:24:05 CJW - activity updated through activity BLDA022 from case BLD01-02462.
|
Plan resubmittals received | | | 10/18/2001 | | DONE |
|
|
|
Received three copies of revised sheet A-1. Routed to Carl W. KMM
|
Routing - FIRE | 9/28/2001 | | 10/3/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/24/2001 | | 9/28/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started September 27, 2001 and finished the next day. A response from the architect was required. See the conditions list. A plan review report was sent to the architect.
|
Routing - PUBLIC WORKS | 9/21/2001 | | 9/24/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2001 | | DONE |
|
|
|
Received plans back from CDH by applicant, on the 17th of Sept. Ready to route to Marlene. KMM
|
Routing Off Site - C.D.H | 9/7/2001 | | 9/11/2001 | | PASS |
|
|
|
Carol Johnson took plans out to CDH for Bud to look at and sign off on. KMM
|
Application received | | | 9/7/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2001 | | |
|
|
|
|
Received Certificate of Value | | | 9/7/2001 | | DONE |
|
|
|
|