Fee Review-notes | 9/12/2001 | 9/12/2001 | 12/16/2002 | | DONE |
|
|
|
|
Letter of compliance | | | 5/8/2002 | | DONE |
|
|
|
Letter of Compliance #22353 issued 5-8-02.
|
Temporary occupancy | | | 4/18/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4793 issued 4-18-02 to Enterprise Electrical Phase II shell and core bldg.
|
BLD-Final | 4/14/2002 | 4/15/2002 | 4/15/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/14/2002 at 17:27:17. Contact: ###-####.final ok pending others sign off. 4/15/2002 11:13:01 AM
|
BLD-Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | NR |
Jim Storey
|
|
|
TEMP OCC ###-#### need fire doors 4/12/2002 4:19:43 PM
|
FIRE-Final Inspection | 4/9/2002 | 4/10/2002 | 4/10/2002 | P | PASS |
Rick Jackson
|
|
|
###-#### RICHARD will have address up for structural inspector 4/10/2002 2:40:45 PM
|
BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 | P | NR |
Jim Storey
|
|
|
temp occ- richard -###-####
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | PASS |
Jim Storey
|
|
|
###-#### RICHARD DIVIDING WALLS AT CEILING IN RESTROOMS ok 2/20/2002 4:46:55 PM
|
Plan resubmittals received | | | 2/20/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A2.2 and P1.0. Plumbing Inspectors kept (1) copy. The (2) copy sent to records. Per Bill Vandegrift.
|
BLD-Framing/Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Jim Storey
|
|
|
###-#### (FOR SHELL) ok 1/31/2002 2:51:11 PM
|
BLD-Framing/Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Jim Storey
|
|
|
###-#### (FOR SHELL) ok 1/31/2002 2:51:11 PM
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Jim Storey
|
|
|
DAN ###-#### ok to insulate walls exterior need top plate straps on south entry. 1/28/2002 4:58:12 PM
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Jim Storey
|
|
|
DAN ###-#### ok to insulate walls exterior need top plate straps on south entry. 1/28/2002 4:58:12 PM
|
BLD-Framing/Rough-in | 1/11/2002 | 1/14/2002 | 1/14/2002 | P | PART |
Jim Storey
|
|
|
TRUSS\\###-#### sheer nailling ok for exterior cover. 1/14/2002 3:30:43 PM
|
BLD-Concrete | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PASS |
Jim Storey
|
|
|
###-#### c/n made ok. 12/7/2001 10:45:46 AM
|
BLD-Foundation | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### c/n posted .clearance and bent verticals into the walls. 12/6/2001 4:03:40 PM
|
BLD-Footing | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### LAZARO
|
(F) Reprint permit | | | 11/19/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/16/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/14/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2001 | | DONE |
|
|
|
permit ready and need ACHD
|
Plan assigned to (MLO) | 9/13/2001 | | 11/14/2001 | | DONE |
Mike Otto
|
|
|
|
Routing - PUBLIC WORKS | 10/31/2001 | | 11/13/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/7/2001 | | DONE |
|
|
|
Received two sets of resubmittal sheets C1.0. Called Tamura & Associates for three more copies of this revised sheet. Routed the two copies to Brian Murphy.
|
Routing - PLUMBING | 10/26/2001 | | 10/30/2001 | | PASS |
|
|
|
see attached sheet
|
Routing - PLANNING | 10/23/2001 | | 10/26/2001 | | PASS |
|
|
|
Approved per DRH01-169.
|
Plan resubmittals received | | | 10/23/2001 | | DONE |
|
|
|
received two sets of revised sheets P1.0, P2.0, and Civil Sheet 1-1PhaseI to include response letter. Routed to Mike Otto.
|
Routing - PLAN CHECK | 10/22/2001 | | 10/23/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/22/2001 | | DONE |
|
|
|
received two sets of resubmittal sheets A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A4.0, A5.0, A9.0 to include response letter. routed to Mike Otto.
|
Routing - PLUMBING | 10/19/2001 | | 10/19/2001 | | FAIL |
|
|
|
ROUTE TO PLUMBING AFTER 1ST FIRE REVIEW MLO P-8 on fixture schedule is too small. detail 4 p2.0 building supply is too small, 1" water main thru building is too small, run 1" from main water to urinal, provide a site plan showing size and location of sewer and water services.
|
Plan Review Completed(1st rev) | | | 10/16/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 10/11/2001 | | 10/16/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/3/2001 | | 10/11/2001 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 10/11/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLUMBING | 9/28/2001 | | 10/3/2001 | | FAIL |
|
|
|
|
Routing - PLANNING | 9/24/2001 | | 9/28/2001 | | FAIL |
|
|
|
Plans do not comply with Design Review conditions of approval.
|
Plan resubmittals received | | | 9/27/2001 | | DONE |
|
|
|
Received two copies of revised sheets A2.2, P2.0, P1.0, one copy of United Water letter and transmittal sheet. Routed to Mike O. kmm
|
Routing - PUBLIC WORKS | 9/13/2001 | | 9/24/2001 | | FAIL |
|
|
|
Requires drainage plan revision per Brian M. KMM
|
Plan routing begun/NEW & ADDTN | | | 9/13/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2001 | | PEND |
|
|
|
Requires plumbling plans. and United Water letter. contacted Doug T. of this need
|
Received Certificate of Value | | | 9/12/2001 | | DONE |
|
|
|
|
Application received | | | 9/12/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/12/2001 | | DONE |
|
|
|
|