BLD-Final | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | DONE |
Steven Webb
|
|
|
###-#### KEITH Passed already--by inspector #425.-Core and Shell 12/30/2002 1:57:18 PM
|
DOC - L/C Approved | | | 12/30/2002 | | DONE |
|
|
|
Issued LC for Boise Research Center #22791
|
PubWorks Occupancy Approval | 12/18/2002 | 12/18/2002 | 12/18/2002 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 12/18/02. M.Strasser
|
FIRE-Final Inspection | 10/23/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 10/24/2002 2:49:41 PM
|
BLD-Final | 10/23/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 17:15:02. Contact: ###-####.ok for c.o.c. 10/24/2002 3:44:04 PM
|
Print Occupancy Form | | | 10/18/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/10/2002 | 10/11/2002 | 10/11/2002 | P | PART |
Jim Sly
|
|
|
ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Amy Lawson Verbal Corridors OK... Perimeter rooms 2nd floor OK...Need seismic pod at rooms more than 144' Leave out 1 tile for insp of pod. 10/11/2002 1:12:17 PM
|
BLD-Framing/Rough-in | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | PART |
Jim Sly
|
|
|
###-#### 1hr rated area 1st and 2nd floor complete. 9/20/2002 11:02:34 AM
|
(F) Reprint permit | | | 9/19/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/19/2002 | 8/20/2002 | 8/20/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/19/2002 at 12:54:00. Contact: ###-####. Preliminary walk thu.....Cut rock into flutes per plan or provide alternate...Listed assembly. 8/20/2002 11:47:57 AM
|
BLD-Concrete | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 14:09:10. Contact: ###-####. Last of "Tilt up" walls....Pending special insp reports and approvals. 6/14/2002 12:53:07 PM
|
BLD-Concrete | 6/12/2002 | 6/13/2002 | 6/13/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 15:04:19. Contact: ###-####. Tilt up walls Pending MTI insp reports and approvals 6/13/2002 5:12:33 PM 6/13/2002 5:13:03 PM
|
BLD-Concrete | 6/7/2002 | 6/10/2002 | 6/10/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 12:41:33. Contact: ###-####. North 1/2 of East tilt up Walls......Pending MTI reports and approvals. 6/10/2002 12:10:54 PM
|
BLD-Concrete | 6/5/2002 | 6/6/2002 | 6/6/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 10:15:53. Contact: ###-####. Insp of approx.4 Tilt up walls....Pending MTI Special insp and report approvals. 6/6/2002 5:13:39 PM
|
BLD-Concrete | 5/30/2002 | 5/31/2002 | 5/31/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 15:09:21. Contact: ###-####. West wall Tilts.....Pending MTI reports and approvals. 5/31/2002 4:38:54 PM
|
BLD-Footing | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 13:30:15. Contact: ###-####. Footings E. S. walls. OK Pending MTI insp and approval. 5/13/2002 11:28:20 AM
|
BLD-Footing | 5/8/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Jim Sly
|
|
|
ft insp -dennis martin ###-#### OK pending Special insp and approval. 5/9/2002 2:54:45 PM
|
(F) Reprint permit | | | 5/8/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/7/2002 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 9/17/2001 | | 4/23/2002 | | PASS |
John Menard
|
|
|
4/23/2002 11:47:17 JCM - activity updated through activity BLDA022 from case BLD01-02513.
|
Routing - PLUMBING | 4/22/2002 | | 4/23/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/23/2002 | | 4/23/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2002 | | PASS |
|
|
|
|
Telephone call | | | 4/23/2002 | | DONE |
|
|
|
CALLED LEFT V-MESSAGE WITH GORDEN PLANS READY 4-23-02 //DLD
|
Inspection Record Card- Bld | | | 4/23/2002 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2002 | | 4/22/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/12/2002 | | DONE |
|
|
|
Received five copies of stamped and signed sheets C2.0 & C3.0. Put with plans. kmm
|
Routing - PUBLIC WORKS | 4/3/2002 | | 4/9/2002 | | FAIL |
|
|
|
Requires stamped drainage plan. KMM
|
Plan Reviewer's activity | | | 4/3/2002 | | PASS |
|
|
|
Plan resubmittals reviewed and approved. JCM
|
Routing - PLAN CHECK | 1/25/2002 | | 4/3/2002 | | |
|
|
|
|
Plan resubmittals received | | | 3/28/2002 | | DONE |
|
|
|
Received two copies of revsied sheets A2.2, A4.1, A4.2, A4.3, A5.1, A9.2, S0.1, S1.1, S1.2, M2.1, M2.2, P0.0, P0.1, P1.1, P1.2, P2.1, P2.2, P3.1, P4.0, P5.0, P6.0, E-1, E-2, E-3, E-4, E-5, E-6, E-7, E-8, E-9, one copy of letter and one copy of information for dryvit sytems. Routed to John M. kmm
|
Routing - PLAN CHECK | 1/23/2002 | | 1/24/2002 | | |
|
|
|
|
Routing - PLANNING | 1/24/2002 | | 1/24/2002 | | PASS |
|
|
|
|
Routing - FIRE | 1/22/2002 | 1/23/2002 | 1/23/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 10/15/2001 | | 1/22/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 1/22/2002 | | |
|
|
|
Mailed Wes Steele a letter requesting additional revisions and plan submittals. JCM
|
Plan resubmittals received | | | 1/18/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets L1.1, C2.0, C3.0, with cover letter addressed to Richard Dailey. routed to John Menard.
|
Plan resubmittals received | | | 1/18/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A0, C2.0, C3.0, L1.1, A1.2, A2.1, A2.2, A2.5, A3.1, A4.2, A4.3, A5.1, A7.1, A7.2, A9.1, A9.2, with cover letter and engineering calculations. Routed to John Menard.
|
Plan Review Completed(1st rev) | | | 10/12/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 10/9/2001 | | 10/12/2001 | | FAIL |
|
|
|
apparatus access
|
Routing Off Site - STRUCTURAL | 10/4/2001 | | 10/11/2001 | | PASS |
|
|
|
contacted pdq to take revised plansand calcs. to outside eng. kmm Received letter from consulting structural engineer approving revised structural plans and calculations as submitted. JCM
|
Plan resubmittals requested | | | 10/9/2001 | | |
|
|
|
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 10/4/2001 | | 10/9/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 10/1/2001 | | 10/4/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/4/2001 | | DONE |
|
|
|
Received three copies of revised sheetsS2.2, S2.4 and three copies of reoponse to review comments. Routed to John M. kmm
|
Routing - PLANNING | 9/19/2001 | | 10/1/2001 | | FAIL |
|
|
|
Plans to don't comply with DRH01-00086. Notified applicant on 9/25/01 by phone.
|
Routing Off Site - STRUCTURAL | 9/17/2001 | | 9/26/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM Received comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 9/26/2001 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 9/14/2001 | | 9/19/2001 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/14/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2001 | | PEND |
|
|
|
Have asked for plumb. mech and elect.plans..
|
First Notice | 9/13/2001 | 9/13/2001 | 9/13/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 9/13/2001 | | DONE |
|
|
|
|
Application received | | | 9/13/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/13/2001 | | DONE |
|
|
|
|