Case Summary (BLD) | | | 1/29/2003 | | |
|
|
|
|
PostCard Mailed | | | 11/1/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 9/29/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Energy code compliance | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PASS |
Jim Sly
|
|
|
ENERGY CODE BOB ###-####
|
BLD-Framing/Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | FAIL |
Jim Sly
|
|
|
fr bob ###-#### C/N posted 3/18/2002 1:51:15 PM
|
BLD-Framing/Rough-in | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### BOB C/N posted 3/15/2002 2:27:15 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by Inspector: 407 On 2/28/2002 5:55:18 PM Ext shear OK. 3/1/2002 12:04:18 PM
|
BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 | P | CANC |
Russ Owen
|
|
|
shear wall. to many others this day. 2/28/2002 5:56:17 PM
|
BLD-Framing/Rough-in | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | CANC |
Tom Arcoraci
|
|
|
paul ###-#### wall
|
BLD-Foundation | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 1/9/2002 2:16:57 PM
|
BLD-Footing | 1/8/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 06:56:18. Contact: .
|
Issue PAID IN FULL permit | | | 12/4/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 9/14/2001 | | 10/10/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/21/2001 | | 10/10/2001 | | PASS |
Steve Munroe
|
|
|
10/10/2001 10:08:28 SAM - activity updated through activity BLDA022 from case BLD01-02519.
|
Plan Reviewer's activity | | | 10/5/2001 | | PEND |
|
|
|
10/2/01 I talked to Tim with Media One. He will fax me a detail section of second floor joist and garage trusses.
|
Print Pending Permit.LaserJet4 | | | 10/2/2001 | | |
|
|
|
|
Plan Review Report | | | 10/2/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/24/2001 | | PEND |
|
|
|
9/24/01 10:20 I called and talked to Jaquie with DiDonato Homes. I had a number of questions and request (such as truss engineering, wall section for joist and trusses on same wall and schematic from engineer). She is having Tim give me a call back to answer the questions. 11:50 Tim with Media One called me and will get me the information I need. New engineering for the entire house may be needed.
|
Pending Assignment by DJO | 9/13/2001 | | 9/21/2001 | | DONE |
Dan Overy
|
|
|
9/21/2001 15:45:37 SAM - activity updated through activity BLDA183 from case BLD01-02519.
|
Routing - PLANNING | 9/13/2001 | | 9/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/13/2001 | | 9/14/2001 | | DONE |
|
|
|
|
Application received | | | 9/13/2001 | | |
|
|
|
|