Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02539
StatusFinaled
Name BOB CAFFERTY BUILDERS INC
Site Address 500 E BAYBROOK CT Unit: #1
Project NameRIVERVIEW PLAZA
Customer Number 
ePlanReviewNo
Description
(ALBERTSONS-1ST FLOOR)(SUITE #1) Remodel of an existing 5,993 sq.ft. space for a new office tenant on first floor of existing building per approved plans on file. Work to include miscellaneous interior demolition work, one-hour corridor wall infill portions, providing one-hour, 450 degree temperature rated doors in corridor walls to comply with original code shell was built under to allow stair enclosures to exit into corridor, upgrading existing core restrooms to meet current accessibility standards, a few new interior walls, a few new interior doors, interior finish, suspended ceiling work, fire alarm work, mechanical work, plumbing work, and electrical work. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. NOTE: This building has an alarm system. This building is NOT fire sprinklered. (PC#0746-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/21/2015 DONE
Fee Review-notes9/17/20019/17/20016/24/2002 DONE
left mesg for final
Permanent Occupancy 3/4/20023/4/2002 DONE
Details
Permanent occupancy  3/4/2002 DONE
Perm. Occ. Cert. #9056 issued 3-4-02 to Albertson's in the Riverview Plaza.
BLD-Final1/14/20021/15/20021/15/2002APASS
DetailsJim Storey
BOB ###-#### ok pending fire. 1/15/2002 10:42:11 AM
FIRE-Final Inspection1/14/20021/15/20021/15/2002APASS
DetailsRick Jackson
BOB ###-####
BLD-Framing/Rough-in11/27/200111/27/200111/27/2001PPART
DetailsJim Storey
###-#### ok to do permitor on celling/ corridor is tunnelized 1 hr const. 11/27/2001 1:56:36 PM
BLD-Framing/Rough-in10/29/200110/30/200110/30/2001APART
DetailsDave Hannah
###-#### BOB int non struc none rated steel stud wall ok to cover after elec sign off 10/30/2001 10:27:54 AM
Issue PAID IN FULL permit  10/25/2001 DONE
Inspection Record Card- Bld  10/25/2001 DONE
Print Occupancy Form  10/25/2001 DONE
Plan assigned to (JCB)9/26/2001 10/24/2001 PASS
DetailsJason Blais
10/24/2001 13:16:01 JCB - activity updated through activity BLDA022 from case BLD01-02539.
Routing - PLAN CHECK10/23/2001 10/24/2001 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  10/24/2001 PASS
Print Occupancy Form  10/24/2001 DONE
Inspection Record Card- Bld  10/24/2001 DONE
Telephone call  10/24/2001 DONE
permit ready
Routing - FIRE10/18/2001 10/23/2001 PASS
approved without written comment
Plan resubmittals received  10/22/2001 DONE
Received two sets of resubmittals of revised sheets A0.0, A0.01, A1.01, A2.01, A4.01, A6.01 with cover letter and comments. Routed to Jason Blais.
Routing - PLAN CHECK10/11/2001 10/18/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  10/18/2001  
Plan resubmittals and written response required for further review.
Plan resubmittals received  10/12/2001  
Received two sets Sheet A0.00, A0.01, A1.01, A2.01, A6.01.
Meeting  10/11/2001  
Met with architect on project. He indicated that changes were occurring and that resubmittal plans would be coming. It was agreed to not do a full review for the plans until new corrected plans are provided.
Routing - PLAN CHECK9/26/2001 10/11/2001 HOLD
Met with architect and he indicated changes were occurring to the plans. It was agreed to not do a full review until resubmittal drawings were submitted with changes. Plans on hold until correct plans are provided.
Routing - PUBLIC WORKS9/26/2001 9/26/2001 PASS
Received Certificate of Value  9/19/2001 DONE
Received revised cert. of value. Submitted to reflect demo. Put with plans. KMM
Plans ACCEPTED BY PLAN TECH  9/18/2001 FAIL
Required stamped and signed plumbing and mechanical plans, plans not fully demensioned, have asked if fire alarm and smoke control are part of design and requires letter from United Water and plumbing value on certificate of value. Faxed architect this information and informed him we do not design build. Talked to Bob.
Received Certificate of Value  9/18/2001 DONE
requested plumbing value
Application received  9/17/2001  
Receive PAYMENT IN FULL PRINT  9/17/2001 DONE