Case Summary (BLD) | | | 4/21/2015 | | DONE |
|
|
|
|
Fee Review-notes | 9/17/2001 | 9/17/2001 | 6/24/2002 | | DONE |
|
|
|
left mesg for final
|
Permanent Occupancy | | 3/4/2002 | 3/4/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/4/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9056 issued 3-4-02 to Albertson's in the Riverview Plaza.
|
BLD-Final | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Jim Storey
|
|
|
BOB ###-#### ok pending fire. 1/15/2002 10:42:11 AM
|
FIRE-Final Inspection | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Rick Jackson
|
|
|
BOB ###-####
|
BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PART |
Jim Storey
|
|
|
###-#### ok to do permitor on celling/ corridor is tunnelized 1 hr const. 11/27/2001 1:56:36 PM
|
BLD-Framing/Rough-in | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Dave Hannah
|
|
|
###-#### BOB int non struc none rated steel stud wall ok to cover after elec sign off 10/30/2001 10:27:54 AM
|
Issue PAID IN FULL permit | | | 10/25/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/25/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/25/2001 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 9/26/2001 | | 10/24/2001 | | PASS |
Jason Blais
|
|
|
10/24/2001 13:16:01 JCB - activity updated through activity BLDA022 from case BLD01-02539.
|
Routing - PLAN CHECK | 10/23/2001 | | 10/24/2001 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/24/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2001 | | DONE |
|
|
|
permit ready
|
Routing - FIRE | 10/18/2001 | | 10/23/2001 | | PASS |
|
|
|
approved without written comment
|
Plan resubmittals received | | | 10/22/2001 | | DONE |
|
|
|
Received two sets of resubmittals of revised sheets A0.0, A0.01, A1.01, A2.01, A4.01, A6.01 with cover letter and comments. Routed to Jason Blais.
|
Routing - PLAN CHECK | 10/11/2001 | | 10/18/2001 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
|
Plan resubmittals requested | | | 10/18/2001 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Plan resubmittals received | | | 10/12/2001 | | |
|
|
|
Received two sets Sheet A0.00, A0.01, A1.01, A2.01, A6.01.
|
Meeting | | | 10/11/2001 | | |
|
|
|
Met with architect on project. He indicated that changes were occurring and that resubmittal plans would be coming. It was agreed to not do a full review for the plans until new corrected plans are provided.
|
Routing - PLAN CHECK | 9/26/2001 | | 10/11/2001 | | HOLD |
|
|
|
Met with architect and he indicated changes were occurring to the plans. It was agreed to not do a full review until resubmittal drawings were submitted with changes. Plans on hold until correct plans are provided.
|
Routing - PUBLIC WORKS | 9/26/2001 | | 9/26/2001 | | PASS |
|
|
|
|
Received Certificate of Value | | | 9/19/2001 | | DONE |
|
|
|
Received revised cert. of value. Submitted to reflect demo. Put with plans. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2001 | | FAIL |
|
|
|
Required stamped and signed plumbing and mechanical plans, plans not fully demensioned, have asked if fire alarm and smoke control are part of design and requires letter from United Water and plumbing value on certificate of value. Faxed architect this information and informed him we do not design build. Talked to Bob.
|
Received Certificate of Value | | | 9/18/2001 | | DONE |
|
|
|
requested plumbing value
|
Application received | | | 9/17/2001 | | |
|
|
|
|