Case Summary (BLD) | | | 9/20/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 6/29/2005 | | |
|
|
|
|
Fee Review-notes | 9/18/2001 | 9/18/2001 | 12/16/2002 | | DONE |
|
|
|
|
Permanent Occupancy | | 11/22/2002 | 11/22/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/22/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9453 issued 11-2-02 to Greg Contos.
|
BLD-Final | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 18:46:20. Contact: ###-####.
|
BLD-Final | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 11:42:23. Contact: ###-####...need verify fire, P&Z... 10/9/02 10:03:27 AM
|
BLD-Final | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Carl Dependahl
|
|
|
greg 8631508...still needs other sigs: ACHD, PWks, P&Z...replace entry hdwe w/ lever 10/9/02 4:11:04 PM
|
FIRE-Final Inspection | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Supply Line Hydro | 10/7/2002 | 10/8/2002 | 10/8/2002 | A | PASS |
Rick Jackson
|
|
|
greg call first ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie will have lever set on restroom door for structural; accessible route to access the ramp on east side of house is not installed per plans; path not 4 foot wide for wheelchair use 10/8/2002 10:54:13 AM
|
BLD-Final | 9/30/2002 | 10/2/2002 | 10/2/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/30/2002 at 13:12:04. Contact: ###-####....need fire, card, add front hand rails, recall. 10/2/2002 12:06:05 PM
|
BLD-Grading Inspection | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | NR |
Rita DeYoung
|
|
|
PARKING LOT; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung; referred to pub wks for drainage insp. 9/3/2002 3:59:02 PM
|
BLD-Framing/Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### GREG KEY UNDER ROCK AT BACK DOOR c/n ok 4/8/2002 4:09:50 PM
|
BLD-Framing/Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | FAIL |
Carl Dependahl
|
|
|
GREG ###-#### KEY IS UNDER ROCK BY THE BACK DOOR PLANS ARE ON KITCHEN COUNTER; nr, need elec, c/n issued, framing not complete (ramp? bsmt /crawl doors..etc. see c/n) 3/12/2002 10:28:14 AM
|
Issue PAID IN FULL permit | | | 12/7/2001 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/26/2001 | | 11/2/2001 | | PASS |
Carl Westfall
|
|
|
11/2/01 09:33:59 CJW - activity updated through activity BLDA022 from case BLD01-02553.
|
Routing - PLAN CHECK | 10/11/2001 | | 11/2/2001 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 11/2/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/2/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2001 | | DONE |
|
|
|
permit ready and need ACHD
|
Plan resubmittals received | | | 11/1/2001 | | DONE |
|
|
|
Received two sets of resubmittal sheets A2, A3, and response letter. Routed to Carl Westfall.
|
Routing - FIRE | 10/8/2001 | | 10/11/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 10/11/2001 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLAN CHECK | 10/2/2001 | | 10/8/2001 | | |
|
|
|
Failed first UBC review. The UBC plan review was started October 5, 2001 and finished October 8, 2001. A response from the architect was required. See the conditions list.
|
Routing - PLANNING | 10/2/2001 | | 10/2/2001 | | PASS |
|
|
|
Approved per DRH01-00164 and as noted in letter from Roger Howard dated 8/31/01.
|
Routing - PUBLIC WORKS | 9/26/2001 | | 10/1/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 9/18/2001 | | DONE |
|
|
|
|
Application received | | | 9/18/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/18/2001 | | DONE |
|
|
|
|