Permit Information
Permit NumberBLD01-02571
StatusFinaled
Name BAKER JERALD E &
Site Address 880 N CURTIS RD
Project NameDR ALAN PITT
Customer Number 
ePlanReviewNo
Description
(DR. ALLEN PITT) To convert an existing 1,040 sq.ft. dwelling to a commercial office building with a 786 sq. ft. mechanical equipment basement per approved plans on file and DRH01-00130. Work to include miscellaneous demolition work, providing one-hour construction on ceiling and walls in basement usable space with a 20 minute rated door, new interior bearing wall in basement for additional floor support, new exterior accessible ramp, new exterior stairs, new handrails where required, upgrading restroom to meet accessibility requirements, some new interior walls, some new interior doors, interior finish, new exterior landings, exterior wall infill at former door opening, exterior site work, mechanical work, plumbing work, and electrical work. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. NOTE: This building is NOT fire sprinklered. (PC#0756-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes9/19/20019/19/20018/15/2002 DONE
Permanent occupancy  2/7/2002 DONE
Perm. Occ. Cert. #9022 issued 2-7-02 to Dr. Allen Pitt.
Permanent Occupancy 2/6/20022/6/2002 DONE
Details
BLD-Final2/5/20022/6/20022/6/2002APASS
DetailsTom Arcoraci
LARRY - ###-#### ok for perm occ 2/6/2002 11:53:24 AM
BLD-Conference1/24/20021/24/20021/24/2002PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 1/24/2002 4:40:25 PM conf with bob a on resubmittal
BLD-Final1/17/20021/18/20021/18/2002AFAIL
DetailsTom Arcoraci
###-#### larry picked resubmittal for bobs app 1/23/2002 4:49:07 PM
FIRE-Final Inspection1/2/20021/2/20021/2/2002PPASS
DetailsTroy Cobbley
Fire life/safety finaled 1/2/2002 1:45:54 PM
BLD-Final12/19/200112/21/200112/21/2001AFAIL
DetailsTom Arcoraci
###-#### must resubmit to plan reveiw for change at rear door 12/20/2001 3:14:07 PM
Code Occupancy Approval  12/20/2001 PASS
Inspection noted compliance.
FIRE-Final Inspection12/18/200112/19/200112/19/2001AFAIL
DetailsTroy Cobbley
install fire exinguisher 12/20/2001 4:23:48 PM
BLD-Other12/17/200112/18/200112/18/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/17/2001 at 15:46:33. Contact: ###-####. rear door area not per plan 12/18/2001 11:38:24 AM
BLD-Concrete11/7/200111/8/200111/8/2001AFAIL
DetailsTom Arcoraci
jerry- ###-#### no plans 11/8/2001 9:03:34 AM
BLD-Footing11/8/200111/8/200111/8/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 11/8/2001 10:07:49 AM
Routing - PLAN CHECK11/7/2001 11/7/2001 PASS
Permit and plans approved and taken to front desk.
Plan resubmittals received  11/7/2001 DONE
Received two sets of resubmittal sheets A2.0 to include cover letter. Routed to Jason Blais.
PLANS/APPL TAKEN TO FRONT DESK  11/7/2001 PASS
Print Occupancy Form  11/7/2001 DONE
Inspection Record Card- Bld  11/7/2001 DONE
Telephone call  11/7/2001 DONE
permit ready
Issue PAID IN FULL permit  11/7/2001 DONE
Plan assigned to (JCB)9/26/2001 11/7/2001 PASS
DetailsJason Blais
11/7/2001 14:06:15 JCB - activity updated through activity BLDA022 from case BLD01-02571.
Routing - PLAN CHECK10/29/2001 11/6/2001 FAIL
Architect and engineer failed to adequately address minimum floor load issue for an office building. Called architect and let him know. Issue to be addressed and resubmittal drawings to be provided.
Plan resubmittals requested  11/6/2001  
Resubmittal drawings required again. Failed to address minimum floor loads required for an office building.
Plan resubmittals received  11/5/2001 DONE
Received two sets of revised sheets A5.0 to include comment letter and one set of structural calcs. Routed to Jason Blais.
Routing - PLAN CHECK10/16/2001 10/29/2001 FAIL
Resubmittals required for reinforcing existing floor framing in one area and for changes to exterior ramp framing.
Plan resubmittals received  10/29/2001 DONE
Received two sets for resubmittal of sheets A0.0, A1.0, A2.0, A3.0, A4.0, A5.0 to include response letter. Routed to Jason Blaise.
Plan resubmittals requested  10/29/2001  
Called architect and let him know of structural deficiencies in existing floor joists in one area and a few members on exterior ramp framing. Resubmittals to be provided with changes concerning these issues.
Routing - FIRE10/15/2001 10/16/2001 PASS
approved without written coment
Plan Review Completed(1st rev)  10/16/2001 FAIL
Plan resubmittals requested  10/15/2001  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK10/1/2001 10/15/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Routing - PLANNING9/28/2001 10/1/2001 PASS
Approved per DRH01-00130.
Routing - PLUMBING9/27/2001 9/28/2001 PASS
Routing - PUBLIC WORKS9/26/2001 9/27/2001 PASS
Plans ACCEPTED BY PLAN TECH  9/20/2001 DONE
Mech. not adding additional cooling/heating units. Plumb. confined to bathroom remodel.
Received Certificate of Value  9/19/2001 DONE
Application received  9/19/2001  
Recd Pcfee & Taken To Pln CK  9/19/2001