ePlanReviewNo
Description
BOISE CONSUMER CO-OP (REFRIGERATION EQUIPMENT PENTHOUSE) - TO DEMOLISH AND REMOVE EXISTING INTERIOR PARTITION WALL ,DOOR AND RACKS FROM THE EXISTING MEZZANINE COMPRESSOR ROOM. TO REMOVE 10 OF THE EXISTING 15 ROOFTOP COMPRESSOR UNITS AND TO CONSTRUCT A NEW 475 SQ. FT., WOOD FRAMED PENTHOUSE REFRIGERATION EQUIPMENT SHELTER ON THE ROOF BETWEEN GRID LINES G&H AND 5&6. THIS PERMIT ALSO INCLUDES INFILL OF EXISTING EXTERIOR WALL VENTS AT OLD COMPRESSOR ROOM AREA. ALL CONSTRUCTION PER THE APPROVED PLAN ON FILE. THIS BUILDING IS FULLY FIRE SPRINKLED. DRH01-00142/PC#770-01/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired11/17/200311/17/200311/17/2003APASS
DetailsDave Hannah
Expired by inspector at 11/17/2003 10:19:08 AM
BLD-Aging Inspection11/12/200311/13/200311/13/2003APASS
DetailsDave Hannah
exp on time limitations 11/17/2003 10:19:06 AM
BLD-Aging Inspection11/6/200311/6/200311/6/2003 CANC
DetailsDave Hannah
BLD-Conference7/11/20037/14/20037/14/2003ANR
DetailsCarl Dependahl
left msg... 7/14/2003 3:04:32 PM
BLD-Aging Inspection7/11/20037/11/20037/11/2003 DONE
DetailsCarl Dependahl
unable to contact...work appears complete. 7/14/2003 3:05:10 PM
Fee Review-notes9/25/20019/25/20014/29/2002 DONE
BLD-Conference3/22/20023/25/20023/25/2002ANR
DetailsCarl Dependahl
Scheduled by Inspector: 415 On 3/22/2002 2:13:41 PM wants to see carl, adding office space, will need sprinkler modification, etc. unable to contact, rescheduled 3/25/2002 11:40:22 AM
BLD-Conference3/25/20023/25/20023/25/2002PFAIL
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/25/2002 11:16:13 AM c/n...install guardrail at added man-door at roof-top mech. room; also submit add'l cert of value for add'l proposed elec & finish work within bldg... 3/25/2002 4:27:57 PM
BLD-Conference3/22/20023/22/20023/22/2002PPART
DetailsTony Young
###-#### MEKYAEL
carl needs to see plan for review 3/22/2002 2:14:19 PM
BLD-Conference3/21/20023/21/20023/21/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/21/2002 3:50:59 PM w/ bldr re possible plan modification
BLD-Conference1/15/20021/15/20021/15/2002PPASS
DetailsCarl Dependahl
JAMES ###-####; man door ok; resubmittals to have permit no's 1/15/2002 2:48:59 PM
BLD-Conference1/11/20021/11/20021/11/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/11/2002 4:02:24 PM w/ bldr, resubmittal req'd for man door
Plan resubmittals received  1/10/2002 DONE
Received three copies of resubmittal sheet A2.0 with cover letter. Routed to Carl Dependahl.
BLD-Conference1/8/20021/8/20021/8/2002PPASS
DetailsCarl Dependahl
###-####; arch to submit for proposed man door add'n at hvac rm.. 1/8/2002 2:55:48 PM
BLD-Conference12/17/200112/17/200112/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/17/2001 9:20:24 AM rec'd eng's letter, ok. frame ok to continue
BLD-Conference12/17/200112/17/200112/17/2001PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/17/2001 at 09:07:13. Contact: ###-####. w/ mgr onsite...need hvac install & approval. 12/17/2001 2:59:48 PM
BLD-Framing/Rough-in12/17/200112/17/200112/17/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/17/2001 9:34:42 AM ok to cover int side for surface mount of elec.
BLD-Framing/Rough-in11/28/200111/29/200111/29/2001APART
DetailsRuss Owen
j.c. ###-####
BLD-Framing/Rough-in11/28/200111/29/200111/29/2001APART
DetailsRuss Owen
j.c. ###-####
BLD-Conference11/8/200111/9/200111/9/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/08/2001 at 19:32:37. Contact: ###-####...req'd arch/ eng'r to report or provide spec insp for bolts installed in masonry & steel fabrication. 11/9/2001 10:33:13 AM
BLD-Conference11/6/200111/7/200111/7/2001APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/06/2001 at 18:33:51. Contact: ###-####...w/ contractor at site, need structural notes to verify if special insp req'd for steel column attachment to walls& as need. 11/7/2001 11:33:28 AM
BLD-Framing/Rough-in11/7/200111/7/200111/7/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/7/2001 11:36:40 AM joisting for hvac penthouse floor only...need plan notes &/or spec insp for epoxy bolt connections to existing masonry & steel members supprting hvac equipment. Also, need clarify if machinery room req's apply.
Issue PAID IN FULL permit  10/18/2001 DONE
Inspection Record Card- Bld  10/17/2001 DONE
Print Occupancy Form  10/17/2001 DONE
Telephone call  10/17/2001 DONE
left mess that permit is ready
Routing - FIRE10/12/2001 10/16/2001 PASS
Routing - PLAN CHECK10/16/2001 10/16/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/16/2001 PASS
Plan assigned to (JCM)9/25/2001 10/16/2001 PASS
DetailsJohn Menard
10/16/01 15:18:05 JCM - activity updated through activity BLDA022 from case BLD01-02607.
Routing - PLAN CHECK10/2/2001 10/12/2001  
Plan resubmittals received  10/10/2001 DONE
Received two copies of Elkhorn Eng. letter and Elkhorn sketch. SKM-1 Routed to John M. kmm
Plan Reviewer's activity  10/3/2001 PASS
Plans reviewed and approved as submitted with redlined notes. JCM
Routing - PLUMBING9/28/2001 10/2/2001 PASS
Routing - FIRE9/27/2001 9/28/2001 FAIL
need refrigerant quantity
Plan Review Completed(1st rev)  9/28/2001 FAIL
Routing - PUBLIC WORKS9/25/2001 9/27/2001 PASS
Routing - PLANNING9/27/2001 9/27/2001 PASS
Application received  9/25/2001  
Recd Pcfee & Taken To Pln CK  9/25/2001 DONE
Plans ACCEPTED BY PLAN TECH  9/25/2001 DONE
Plan routing begun/NEW & ADDTN  9/25/2001 DONE