Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02631
StatusFinaled
Name EMPIRE BUILDING (5TH FLR CORRIDOR)
Site Address 205 N 10TH ST Unit: (5TH FLR)
Project NameEMPIRE BLDG-5TH FLOOR
Customer Number 
ePlanReviewNo
Description
(EMPIRE BUILDING - 5TH FLOOR) This building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall and too big. To construct a non-rated corridor between the existing stairways on the 5th floor of the Empire Building. Work is to include interior nonbearing walls, interior doors, interior windows, and suspended ceilings all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Building Department. This permit does NOT establish a Certificate of Occupancy for any tenant. PC01-0779 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  5/8/2002 DONE
Letter of Compliance #22351 issued 5-8-02.
BLD-Final4/26/20024/29/20024/29/2002APASS
DetailsRuss Owen
tim ###-#### fn . Ok perm signature on card. 4/29/2002 12:26:56 PM
BLD-Final4/25/20024/25/20024/25/2002PPART
DetailsCarl Dependahl
tim ###-#### fn obtain elec permanent; t/o ok. 4/25/2002 4:36:42 PM
FIRE-Final Inspection4/25/20024/25/20024/25/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 4/25/2002 12:04:05 PM
BLD-Framing/Rough-in4/11/20024/12/20024/12/2002APART
DetailsTom Arcoraci
###-#### TIM grid insp needs spacer bars 4/12/2002 9:09:50 AM
BLD-Framing/Rough-in3/4/20023/4/20023/4/2002PPART
DetailsCarl Dependahl
wall cover insp tim ###-#### 3walls ok 3/4/2002 3:58:50 PM
Issue PAID IN FULL permit  11/8/2001 DONE
(F) Reprint permit  11/8/2001 DONE
Plan assigned to (CJW)10/2/2001 10/24/2001 PASS
DetailsCarl Westfall
10/24/01 13:18:09 CJW - activity updated through activity BLDA022 from case BLD01-02631.
Routing - PLAN CHECK10/23/2001 10/24/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/24/2001 PASS
Print Occupancy Form  10/24/2001 DONE
Inspection Record Card- Bld  10/24/2001 DONE
Telephone call  10/24/2001 DONE
permit ready
Routing - FIRE10/18/2001 10/23/2001 PASS
Routing - PLAN CHECK10/2/2001 10/18/2001 PASS
UBC plan review started October 17, 2001 and finished the next day. The drawings were approved with conditions. See the conditions list.
Plans ACCEPTED BY PLAN TECH  9/28/2001 DONE
<$25,000
First Notice9/27/20019/27/20019/27/2001 DONE
Application received  9/27/2001